ISS Cooling System Repairs Proceeding Apace | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Aug 13, 2010

ISS Cooling System Repairs Proceeding Apace

Faulty Ammonia Pump Removed During Spacewalk

Expedition 24 Flight Engineers Doug Wheelock and Tracy Caldwell Dyson have completed the second of three spacewalks to remove the failed ammonia coolant Pump Module on the S1 truss of the International Space Station that failed July 31. Their spacewalk ended at 1553 EDT Wednesday.


NASA Image

Wheelock successfully closed the quick disconnect valve for the final fluid connector for the failed ammonia pump module. Then he successfully detached the final fluid line from the failed ammonia pump module. Caldwell Dyson disconnected five electrical and data cables while Wheelock broke torque and removed four bolts from the old pump. The pump module then was extracted from the truss through the use of a grapple bar and installed on a payload bracket on the Mobile Base System on the station’s truss.

With the failed pump module safely stowed on the truss, Caldwell Dyson prepared the spare pump for installation on the next spacewalk, which is scheduled for Monday, August 16.  A fourth spacewalk may be required to clean up the work site.

In response to the power reconfiguration steps last weekend, the science team worked quickly to establish a plan to preserve experiment samples in the Japanese Experiment Module freezer. The on-orbit crew was able to transfer all the samples from the freezer in the Kibo laboratory to an operating freezer. No sciences samples were lost due to the pump module anomaly.


NASA Image

While the crew schedule has been interrupted to support the newly added spacewalks, the payload ground teams have been working closely with mission controllers to preserve and re-plan high priority activities. Other activities that can be rescheduled with little or no impact are being postponed to a later date.

FMI: www.nasa.gov

Advertisement

More News

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC