GE Honda Aero Engines – “Cranking Away” | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Jul 29, 2009

GE Honda Aero Engines – “Cranking Away”

Engine Manufacture Works To Bring The HF120 Engine To Market

By: Chris Batcheller

“We have no major announcement” said GE Honda Aero Engine’s Bill Dwyer as he kicked off the press conference. And, while there is no major announcement, the company is steadily working to certify the HF120 turbine engine. The company is moving from flying and testing demonstration engines to conforming production engines.

Bill Dwyer

GE Honda Aero Engines has completed and tested 11 builds of demonstration engines with 8 different cores in the last 2 years.  These engines were used to collect data and ensure that the design is sound. The HF120 engine has been designed to the rigorous GE Aviation design standards.

The demonstration engines gave the company the opportunity to tweak the design and fly fully instrumented engines to collect test data.  The company has also been competing component development, including an exhaust demonstrator to prove the design. At this point the company has frozen the design, released drawings and is entering the formal FAA testing phase.  

Bill Dwyer noted that the conforming engines will be tested to 15,000 cycles prior to any engines being delivered to customers. That’s according to GE Aviations ETOPS standards. Bill Dwyer noted that the HondaJet will be the first recipient of customer engines and the second will be Spectrum Aeronautical "Freedom" business jet.

The engine will initially be produced at GE Aviation’s Lynn, Massachusetts facility. Later the production will be transferred to GE Honda Aero Engine’s facility in Burlington, North Carolina.

 “The first engine to test will run by the end of the summer, and certification testing will continue into 2010” noted Bill Dwyer.

FMI: www.gehonda.com

Advertisement

More News

ANN's Daily Aero-Linx (04.15.24)

Aero Linx: International Flying Farmers IFF is a not-for-profit organization started in 1944 by farmers who were also private pilots. We have members all across the United States a>[...]

Classic Aero-TV: 'No Other Options' -- The Israeli Air Force's Danny Shapira

From 2017 (YouTube Version): Remembrances Of An Israeli Air Force Test Pilot Early in 2016, ANN contributor Maxine Scheer traveled to Israel, where she had the opportunity to sit d>[...]

Aero-News: Quote of the Day (04.15.24)

"We renegotiated what our debt restructuring is on a lot of our debts, mostly with the family. Those debts are going to be converted into equity..." Source: Excerpts from a short v>[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.16.24): Chart Supplement US

Chart Supplement US A flight information publication designed for use with appropriate IFR or VFR charts which contains data on all airports, seaplane bases, and heliports open to >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC