GEnx Engine Takes Flight For First Time | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Feb 23, 2007

GEnx Engine Takes Flight For First Time

Attached To 747 Test Bed

General Electric's GEnx engine took to the skies Thursday over Victorville, CA, marking the start of flight-testing on GE's 747 flying test-bed. During the three-hour first flight, the GEnx-1B engine demonstrated aircraft systems and instrumentation functionality, climbed to more than 43,000 feet and established engine performance baselines for flight-testing.

"The engine performed extremely well, and we look forward to gaining additional valuable information on the engine's capabilities from flight-testing," said Tom Brisken, general manager of the GEnx program. "Today's flight puts us another step closer to certification later this year on the GEnx-1B engine for the Boeing 787 Dreamliner."

Preparations for the first GEnx flight on GE's flying test-bed began more than two years ago.

GE says the electrical system requirements for the Boeing 787 Dreamliner posed unique challenges. GE's 747 flying test-bed was modified to manage the electrical load from the engine's two starter-generators and to provide the power necessary for electrical ground and air starts. The modifications were completed last month, and the GEnx-1B engine was installed in the inboard location on the left wing of the aircraft in just one day.

The GEnx flight test team has a rigorous schedule ahead, with about three flights per week over the next three months. These flight-tests will evaluate the steady-state and transient performance of the engine, verify air re-starting capability, determine the combustor operability margins, validate throttle response and assess the nacelle and undercowl cooling characteristics.

The majority of the flight tests will occur in Victorville, CA with hot-day assessments taking place in Yuma, AZ and high-altitude takeoff evaluations occurring in Colorado Springs, CO. A second round of flight-testing later this year will focus on the engine control system.

FMI: www.geae.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC