Forensic Testing Being Done On Endeavour Load Control Assembly | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, May 05, 2011

Forensic Testing Being Done On Endeavour Load Control Assembly

New LCA Box Has Been Installed Aboard The Orbiter

Technicians at the NASA Shuttle Logistic Depot in Cape Canaveral, FL, are doing additional forensic engineering testing on a faulty power distribution box, called a Load Control Assembly 2 (LCA-2). It was removed Tuesday morning from the aft compartment of space shuttle Endeavour on Launch Pad 39A at NASA?s Kennedy Space Center.

Technicians are trying to determine what caused the power box to fail. Initial testing shows a driver (circuit) inside the LCA-2 shorted out. The LCA-2 feeds power to heaters on the fuel line for Endeavour's auxiliary power unit-1 (APU-1). Initially, when the shorted out driver was replaced, the LCA-2 appeared to worked as designed.

Technicians are performing additional failure analysis on the driver to confirm whether the short experienced by the system came from inside or outside the LCA-2. Depending on the results, additional testing of the box may be required. On Launch Pad 39A, a new LCA-2 box was installed into Endeavour Wednesday morning, and technicians are preparing to retest the system before Endeavour's next launch attempt is scheduled. Currently, Endeavour's no earlier than launch date remains May 10.

The APU-1 fuel line heaters did not work on April 29, prompting the launch team to scrub the Endeavour's first launch attempt for the STS-134 mission to the International Space Station.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

ANN's Daily Aero-Linx (04.14.24)

Aero Linx: Soaring Safety Foundation (SSF) The Soaring Safety Foundation (SSF) is the Training and Safety arm of the Soaring Society of America (SSA). Our mission is to provide ins>[...]

Classic Aero-TV: 'We're Surviving'-- Kyle Franklin Describes Airshow Life 2013

From 2013 (YouTube Version): Dracula Lives On Through Kyle Franklin... and We're NOT Scared! ANN CEO and Editor-in-Chief, Jim Campbell speaks with Aerobatic and airshow master, Kyl>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC