FAA Certifies Flat Panel Display System (FPDS) For Classic B737 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne 04.23.18

Airborne-UnManned 04.24.18

Airborne 04.18.18

AMA Drone Report 04.19.18

Airborne 04.20.18

Airborne-YouTube

Airborne 04.23.18

Airborne-UnManned 04.24.18

Airborne 04.18.18

AMA Drone Report 04.19.18

Airborne 04.20.18

Fri, Aug 10, 2012

FAA Certifies Flat Panel Display System (FPDS) For Classic B737

STC Covers Installation On -300, -400, and -500 Models

The FAA has granted an STC to Innovative Solutions & Support, Inc. for the installation of its Flat Panel Display System (FPDS) on Classic B-737 aircraft.

The STC covers the B737-300/-400/-500 series aircraft and provides B-737 operators with a retrofit of their flight deck avionics with a modern pilot and copilot suite of high resolution multi-color LCD flat panel displays. The company says operators will benefit from improved dispatch reliability, logistics savings, and adaptability to future airspace requirements.

“Working with customers, we continue to expand our Flat Panel product line to additional aircraft types,” said Shahram Askarpour, president for IS&S. “With the launch of this program late last year, IS&S is able to deliver another certified program in to the market quickly and efficiently to support increasing customer demand for integrated avionics offerings.”

The receipt of the STC positions IS&S to pursue the more than 1,000 Classic B-737 aircraft with the need for Flat Panel Display System upgrades. The cockpit upgrade of the B737 replaces aging flight instruments and includes the installation of an Electronic Standby Instrument System (ESIS). The FPDS utilizes a common 10.4-inch display architecture that IS&S developed and certified, and that IS&S has installed on more than 160 B-757 and B-767 aircraft. “What makes this installation revolutionary is the short aircraft down time, while removing 10 net LRU’s and approximately 100 pounds, which can be less than 24 hours,” added Askarpour. The company will provide a complete turn key installation including installation at remote sites.

As it continues to deliver technology to support NextGen and SESAR requirements, IS&S has delivered multiple solutions which satisfy Communications, Navigation, and Surveillance/Air Traffic Management (CNS/ATM) needs. “The FPDS serves as the foundation of future technology by providing a true Forward Field of View (FFV) display of information and data to flight crews,” said Mike Glover, Director – IS&S Atlanta Region Director. “We are pleased to announce the B737 program certification and to deliver features and functions which operators need to support existing and emerging airspace requirements.”

The B737 FPDS is available for purchase and delivery through IS&S and offers an open architecture flat panel display system that allows operators to upgrade their aircraft while not replacing installed third party avionics. This approach allows the operator to select the best new equipment and minimizes the cost and down time of the upgrade.

(Image provided by IS&S)

FMI: www.innovative-ss.com

Advertisement

More News

Airborne-Unmanned 04.17.18: XPO 2018, Drone Broadcasts, Airbus Inspection Drone

Also: NZ AFB Drone Incident, Police UAVs, Inaugural Drone Boot Camp, Predator 5M Flight Hours This is it! THE major unmanned exposition of the year -- AUVSI XPONENTIAL 2018 starts >[...]

AMA Drone Report 04.19.18: AMA Leadership, FAA Reauthorization, Coachella

Also: New French Regs, Drone Boot Camp, Public Safety Drone Standards, DroneShield Protects NASCAR It’s a little bit sad and yet a bit cool to see AMA make an exciting change>[...]

Airborne/Barnstorming 04.23.18: We Can Do So Much Better...

I'll Admit It... We're A Mite Frustrated, But We're ALSO Not Quitting... Ever Comments/Analysis/News/Video by ANN CEO/Editor-In-Chief, Jim Campbell We've accomplished so much over >[...]

Airborne 04.23.18: Hemisphere Suspended, Thunderbirds Fly, Apple v Drones

Also: New NASA Administrator, AD For CFM56-7B, Engine Display Upgrade On C-441, First BBJ MAX Textron Aviation has suspended work on the Citation Hemisphere large business jet, cit>[...]

Airborne 04.20.18: Continental Jet-A Seminole, SWA Fallout, NYC NIMBY's Helo's

Also: Teamsters Talk Allegiant, Coleman Young Airport, Miracle Flights, IN Av Repair Biz Cleared Piper has selected the Continental Motors CD-170 compression ignition engine fueled>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2018 Web Development & Design by Pauli Systems, LC