Boeing Delivers 1st Space Launch System Hardware To NASA | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 09.15.14 ** HD iPad-Friendly -- Airborne 09.15.14 **
** Airborne 09.12.14 ** HD iPad-Friendly -- Airborne 09.12.14 **
** Airborne 09.10.14 ** HD iPad-Friendly -- Airborne 09.10.14 **

Mon, Jun 04, 2012

Boeing Delivers 1st Space Launch System Hardware To NASA

SLS Capability Will Enable Future Human Space Exploration

Three flight computer software test beds have been delivered to NASA by Boeing ... the first critical element for flight software development in support of NASA's Space Launch System (SLS). Flight software controls the launch vehicle during preflight tanking operations and in flight. The test beds were delivered on April 25 to the Software Development Facility at NASA's Marshall Space Flight Center in Huntsville. They are now being integrated with NASA's application software.

"These are the most capable flight computers ever developed for human spaceflight," said Dane Richardson, manager for the Boeing SLS Avionics and Software Team. "They have the highest processing capability available in a flight computer and triple modular redundant processors. The technology is proven from years of satellite applications, and it's reliable enough to take SLS beyond Earth's orbit."
 
In triple modular redundant processing, three processors within each flight computer interpret the data, then "vote" to be sure they all agree on the response before sending that solution from the computer. The three flight computers on the vehicle then compare those answers and send commands to the vehicle for execution. "The triple redundant processors make each computer reliable in the harsh radiation environment. Similarly, the three computers working in concert make the vehicle reliable," explained Richardson. "The configuration is called the flight computer operating group."
 
"We are moving out very quickly on SLS," said Todd May, Space Launch System Program manager at NASA's Marshall Space Flight Center in Huntsville, Ala. "SLS will be the most powerful launch vehicle ever built, and it requires the most capable flight software in the history of human spaceflight. Having this avionics hardware in place early will allow the NASA SLS team and Boeing to accelerate the flight software development."

In 2011, NASA executed a contract modification that changed existing Upper Stage Production and Instrument Unit Avionics contracts into a single contract for design, development and production of the cryogenic stages and avionics for SLS.
 
Under NASA's phased development plan for SLS, Boeing is designing the two cryogenic stages concurrently to maximize the affordability of rocket development and operations. The initial flight-test configuration, scheduled to fly in 2017, will provide a 70-metric ton capacity using only the first stage. The complete two-stage vehicle configuration will provide a lift capability of more than 130 metric tons to enable missions beyond Earth orbit and support deep space exploration. (SLS image provided by NASA)

FMI: www.beyondearth.com

Advertisement

More News

Airborne 09.12.14: Alan Klapmeier's $10M Win, OWW Progress, 3rd Class Update

Also: Zero-G Engine Repo, Collier Trophy, EAA Addresses FAA Hangar Use, CAF's Dallas Air Expo While it comes as no surprise to those of us that have had to deal with Cirrus Aircraf>[...]

Klyde Morris (09.15.14)

Klyde May Set A Record For The Number of People He's Gonna Tick Off With This One... FMI: www.klydemorris.com>[...]

Aero-News: Quote Of The Day (09.15.14)

“Our team organized the WWII Air Expo as a way to thank residents for welcoming the CAF to North Texas. We will fill the Dallas sky with the largest fleet of World War II bom>[...]

AeroSports Update: WhatÂ’s The Difference Between FAA And ASTM Approved Aircraft?

Sport Pilots Have A Choice Of Flying An Airplane That Is Built To FAA Standards Or To ASTM Standards, And It Helps To Understand The Difference Whether an airplane is built to FAA >[...]

Airbus Celebrates 20 Years Of The 'Beluga'

Flight Hours Per Aircraft Have Doubled Since First Flight In 1994 With its maiden flight on September 13, 1994, the popular Beluga cargo aircraft, affectionately named after the wh>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC