Mu-1 Barrier Attempt Pushed Back, Probably to Spring, 2004 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Oct 11, 2003

Mu-1 Barrier Attempt Pushed Back, Probably to Spring, 2004

Carter Puts Mu-1 Barrier Attempt on Hold

Carter Aviation Technologies (Carter Copters) is announcing that their attempt to break the "Mu-1 barrier" for rotorcraft, recently scheduled for November 22, 2003, has been put on hold. The attempt was scheduled in conjunction with the Organization for Sport Aviation Competition's (OSAC) Air Games at the Texas Motor Speedway in Ft. Worth (TX).

According to Carter President, Jay Carter, Jr., the critical flight-testing phase prior to advancing to Mu-1 has not been completed. The original November date for the Mu-1 attempt was set last spring prior to a wheels-up landing that caused extensive damage to the engine compartment on the Carter prototype.

Springtime trouble spawned opportunity.

Repairs to the fuselage are now complete, but Carter took the opportunity to upgrade the engine from a 300 hp to a 400 hp, turbocharged engine. This new engine is being developed to take Carter's next generation prototype far beyond Mu-1. Changes to the fuselage to accommodate the new engine were fairly straightforward. However, calibrating the engine computer with the turbo added and rewiring the computer systems that download 60 channels of information during flight-testing has been very challenging. In addition to the engine upgrade, Carter took advantage of the downtime to revamp and upgrade some systems that were causing intermittent problems. They also upgraded their patented landing gear to simplify the retraction and extension system and make it more reliable.

Jay Carter commented, "We are moving out of the research stage into more of a development stage.  Our basic technology has been proven with almost 100 hours of successful flight-testing. We are now progressing to the next level and conquering Mu-1 is the first step in expanding the scope of our technology. There are risks involved and our approach has always been one of 'safety first.'  If exceeding Mu-1 was an easy process the barrier would have been broken long before now."

[The OSAC Air Games are also being rescheduled to accommodate a later date for the Mu-1 attempt.  No specific date has been set for the new event. Indications are that it will take place in the spring of 2004 --ed.]

FMI: www.carteraviationtechnologies.com

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC