100th ISS Spacewalk Will Examine Array Joint Issue | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne-Unmanned w/AUVSI

Airborne On ANN

AMA 05.18.17

Airborne
05.22.17

Airborne
05.23.17

Airborne
05.17.17

Airborne
05.18.17

Airborne
05.19.17

Airborne-Unmanned 05.23.17

Airborne-YouTube

AMA 05.18.17

Airborne
05.22.17

Airborne
05.23.17

Airborne
05.17.17

Airborne
05.18.17

Airborne
05.19.17

Airborne-Unmanned 05.23.17

XPONENTIAL Innovation Preview -- www.allthingsunmanned.com

Sat, Dec 15, 2007

100th ISS Spacewalk Will Examine Array Joint Issue

Whitson, Tani To Perform Analysis December 18

An important spacewalk outside the International Space Station is scheduled for next week, that NASA hopes will provide some answers regarding a mysterious problem with a solar array joint. Station Commander Peggy Whitson and Flight Engineer Dan Tani will perform the 100th spacewalk in support of ISS assembly on Tuesday, December 18. They will inspect the starboard Solar Alpha Rotary Joint (SARJ) and the Beta Gimbal Assembly (BGA).

The SARJ and BGA have been temporarily locked in place while the solar arrays still produce power. Whitson and Tani completed a procedure review on Friday and held a tagup with the lead spacewalk officer on the ground.

Kirk Shireman, station program deputy manager called the spacewalk a "fact-finding mission." The spacewalkers will report back to ground controllers what they find and return a trundle assembly back inside the station. Specialists on the ground will use the results to determine how to restore the starboard solar array's sun-tracking capability.

A move of the Mobile Transporter to worksite 4 in the center of the station's truss Friday from worksite 7 -- to provide micrometeoroid debris protection to the spacewalkers -- was postponed Friday after station cameras detected what appeared to be a piece of insulation on the truss track. Flight controllers continue to analyze the situation, according to NASA.

FMI: www.nasa.gov/mission_pages/station/main/index.html

Advertisement

More News

Airborne-Unmanned 05.16.17: XPONENTIAL 2017, Airbus Aerial, Parrot Professional

Also: AUVSI BOD, PrecisionHawk's Free PrecisionMapper, Consortiq, XPONENTIAL 2017 Innovation Preview As opening sessions go, it was an eye-opener. Intel CEO Brian Krzanich took the>[...]

AMA Drone Report 05.18.17: Drone-Jumping!, AMA Sightings Report, King Schools

Also: DJI Smart TV App, Huerta: Unmanned Aircraft 'Good News Story', XPONENTIAL Innovation Preview Ya had to see it to believe it... An ingenious Latvian UAS operation has pulled o>[...]

Airborne 05.22.17: Court Nukes FAA Model Drone Regs, Lancair Moves, Virgin Orbit

Also: Dutch King, DA-42NG, US Civil Aircraft Shipments, ADS-B Out, Facial Recognition, Av Threats, Air Travel Growth The hobby drone industry just got a bit shook up... The U.S. Co>[...]

Airborne 05.19.17: Boeing T-X, WomenVenture 2017, BE-4 Rocket Test

Also: Orion Spacecraft, ANN Update, Sinful Sundays, ATC Privatization Oppo, Huerta@AUVSI, Fire Scout, 700th H130 Boeing will assemble its T-X Air Force training jet at its St. Loui>[...]

Airborne 05.22.17: Court Nukes FAA Model Drone Regs, Lancair Moves, Virgin Orbit

Also: Dutch King, DA-42NG, US Civil Aircraft Shipments, ADS-B Out, Facial Recognition, Av Threats, Air Travel Growth The hobby drone industry just got a bit shook up... The U.S. Co>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC