100th ISS Spacewalk Will Examine Array Joint Issue | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne-Unmanned w/AUVSI

Airborne On ANN

AMA 03.23.17

Airborne
03.20.17

Airborne
03.21.17

Airborne
03.22.17

Airborne
03.23.17

Airborne 03.24.17

Airborne-Unmanned 03.21.17

Airborne-YouTube

AMA 03.23.17

Airborne
03.20.17

Airborne
03.21.17

Airborne
03.22.17

Airborne
03.23.17

Airborne 03.24.17

Airborne-Unmanned 03.21.17

Sat, Dec 15, 2007

100th ISS Spacewalk Will Examine Array Joint Issue

Whitson, Tani To Perform Analysis December 18

An important spacewalk outside the International Space Station is scheduled for next week, that NASA hopes will provide some answers regarding a mysterious problem with a solar array joint. Station Commander Peggy Whitson and Flight Engineer Dan Tani will perform the 100th spacewalk in support of ISS assembly on Tuesday, December 18. They will inspect the starboard Solar Alpha Rotary Joint (SARJ) and the Beta Gimbal Assembly (BGA).

The SARJ and BGA have been temporarily locked in place while the solar arrays still produce power. Whitson and Tani completed a procedure review on Friday and held a tagup with the lead spacewalk officer on the ground.

Kirk Shireman, station program deputy manager called the spacewalk a "fact-finding mission." The spacewalkers will report back to ground controllers what they find and return a trundle assembly back inside the station. Specialists on the ground will use the results to determine how to restore the starboard solar array's sun-tracking capability.

A move of the Mobile Transporter to worksite 4 in the center of the station's truss Friday from worksite 7 -- to provide micrometeoroid debris protection to the spacewalkers -- was postponed Friday after station cameras detected what appeared to be a piece of insulation on the truss track. Flight controllers continue to analyze the situation, according to NASA.

FMI: www.nasa.gov/mission_pages/station/main/index.html

Advertisement

More News

Airborne-Unmanned 03.21.17: Heron 1 FOC, Canadian UAVs BVLOS, Quad Inspects C17

Also: Terra Drone, senseFly partners with MicaSense, Quadcopter Topology Optimization The Heron 1 UAV has attained Full Operational Capability (FOC), allowing two Republic of Singa>[...]

AMA Drone Report 03.23.17: New Canada Drone Regs, 'Anti-Drone' Race, Tiny Whoop

Also: SELFLY Camera-Kickstarter, Turtle Tracking Drones, Drones Save Lives! The Canadian government has recently released new regulations for recreational drone operators that carr>[...]

Airborne 03.24.17: GA v Privatization, FAA UAS $$$, Mexico Fines

Also: NASA Authorization, Av-Associations, Essential Air Services, Kite String, Rotax @SnF, Car v Plane, FAA Forecast With the need to authorize the FAA before September 30 of this>[...]

Aero-News: Quote of the Day (03.26.17)

"Every landing on a ship is a very precise thing. When you get 300,000, it's a pretty big testament to the skill of the aviators and the personnel who maintain the recovery equipme>[...]

ANN's Daily Aero-Term (03.26.17): Circle To Runway

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC