100th ISS Spacewalk Will Examine Array Joint Issue | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne-Unmanned w/AUVSI

Airborne On ANN

AMA 08.17.17

Airborne 08.14.17

Airborne 08.15.17

Airborne 08.16.17

Airborne 08.17.17

Airborne 08.18.17

Airborne-Unmanned 08.15.17

Airborne-YouTube

AMA 08.17.17

Airborne 08.14.17

Airborne 08.15.17

Airborne 08.16.17

Airborne 08.17.17

Airborne 08.18.17

Airborne-Unmanned 08.15.17

NEW!!! 2017 AirVenture Innovation Preview -- YouTube Presentation / Vimeo Presentation

Sat, Dec 15, 2007

100th ISS Spacewalk Will Examine Array Joint Issue

Whitson, Tani To Perform Analysis December 18

An important spacewalk outside the International Space Station is scheduled for next week, that NASA hopes will provide some answers regarding a mysterious problem with a solar array joint. Station Commander Peggy Whitson and Flight Engineer Dan Tani will perform the 100th spacewalk in support of ISS assembly on Tuesday, December 18. They will inspect the starboard Solar Alpha Rotary Joint (SARJ) and the Beta Gimbal Assembly (BGA).

The SARJ and BGA have been temporarily locked in place while the solar arrays still produce power. Whitson and Tani completed a procedure review on Friday and held a tagup with the lead spacewalk officer on the ground.

Kirk Shireman, station program deputy manager called the spacewalk a "fact-finding mission." The spacewalkers will report back to ground controllers what they find and return a trundle assembly back inside the station. Specialists on the ground will use the results to determine how to restore the starboard solar array's sun-tracking capability.

A move of the Mobile Transporter to worksite 4 in the center of the station's truss Friday from worksite 7 -- to provide micrometeoroid debris protection to the spacewalkers -- was postponed Friday after station cameras detected what appeared to be a piece of insulation on the truss track. Flight controllers continue to analyze the situation, according to NASA.

FMI: www.nasa.gov/mission_pages/station/main/index.html

Advertisement

More News

RFP: ANN Seeking New Site/Facility For Major Studio Upgrade

It's Official: Aggressive Upgrades For New Airborne Programs WILL Require New Digs It's been in development for years, but we're getting to a point where we think we can pull off s>[...]

Airborne-Unmanned 08.15.17: Reno Drone Races, DoD CrackDown, Blue Angels v UAV?

Also: Kansas DOT-AirMap, CIRRUAS Drone Program, Daytona Beach PD UAS, Virginia UAS SAR The Reno Air Racing Association has signed an agreement with the MultiGP Drone Racing League >[...]

AMA Drone Report 08.17.17: MULTI-GP Int'l Open, Drone v Chicago, Reno Drone Race

Also: Yuneec Extended Service Plan, UAV on A/C Carrier, Blue Angels Incident, Drone Operator Safety Act MultiGP’s 2017 MultiGP International Open, conducted on the grounds of>[...]

Airborne 08.18.17: NBAA v KSMO, Sully Attacked, DB Cooper Update

Also: New NASA Admin?, Anti-Aviation Hypocrites, Airberlin, Sky Hopper, Drone v Carrier, Jet Aviation, Airman Retires The NBAA joined five other stakeholders to file a brief with t>[...]

Airborne 08.17.17: GA Sales Report, Google Lunar XPRIZE, ATC Privatization

Also: Gustave Whitehead, AirVenture Innovation Preview, Learjet 75, HondaJet, ALEA, Honeywell, F-5N GAMA has published second quarter GA airplane shipment and billings data. The ge>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC