100th ISS Spacewalk Will Examine Array Joint Issue | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne-Unmanned w/AUVSI

Airborne On ANN

AMA 06.22.17

Airborne 06.19.17

Airborne 06.20.17

Airborne 06.21.17

Airborne 06.22.17

Airborne 06.23.17

Airborne-Unmanned 06.20.17

Airborne-YouTube

AMA 06.22.17

Airborne 06.19.17

Airborne 06.20.17

Airborne 06.21.17

Airborne 06.22.17

Airborne 06.23.17

Airborne-Unmanned 06.20.17

XPONENTIAL Innovation Preview -- www.allthingsunmanned.com

Sat, Dec 15, 2007

100th ISS Spacewalk Will Examine Array Joint Issue

Whitson, Tani To Perform Analysis December 18

An important spacewalk outside the International Space Station is scheduled for next week, that NASA hopes will provide some answers regarding a mysterious problem with a solar array joint. Station Commander Peggy Whitson and Flight Engineer Dan Tani will perform the 100th spacewalk in support of ISS assembly on Tuesday, December 18. They will inspect the starboard Solar Alpha Rotary Joint (SARJ) and the Beta Gimbal Assembly (BGA).

The SARJ and BGA have been temporarily locked in place while the solar arrays still produce power. Whitson and Tani completed a procedure review on Friday and held a tagup with the lead spacewalk officer on the ground.

Kirk Shireman, station program deputy manager called the spacewalk a "fact-finding mission." The spacewalkers will report back to ground controllers what they find and return a trundle assembly back inside the station. Specialists on the ground will use the results to determine how to restore the starboard solar array's sun-tracking capability.

A move of the Mobile Transporter to worksite 4 in the center of the station's truss Friday from worksite 7 -- to provide micrometeoroid debris protection to the spacewalkers -- was postponed Friday after station cameras detected what appeared to be a piece of insulation on the truss track. Flight controllers continue to analyze the situation, according to NASA.

FMI: www.nasa.gov/mission_pages/station/main/index.html

Advertisement

More News

Airborne 06.21.17: A380plus??, Lycoming TBO Upgrade, Drone Racing League Premier

Also: WomenVenture, EAA Pilot Proficiency Ctr, 787-9 Order, Cardiac Drones, Cessna Ldg Gears, A320neo, Nightwarden TUAS Airbus is presenting a development study for an enhanced A38>[...]

Airborne 06.21.17: A380plus??, Lycoming TBO Upgrade, Drone Racing League Premier

Also: WomenVenture, EAA Pilot Proficiency Ctr, 787-9 Order, Cardiac Drones, Cessna Ldg Gears, A320neo, Nightwarden TUAS Airbus is presenting a development study for an enhanced A38>[...]

Airborne 06.20.17: MAKO Near 1st Flt, Proteus 1000th, Pegasus Flying Car

Also: SR-72 Details, Aero-Calendar, Spitfire Flips, Tecnam Twins, Space Tourism, Iridium NEXT, Falcon Aviation The first new product since the relocation of experimental aircraft p>[...]

AMA Drone Report 06.15.17: AMA Museum-1999 Draganflyer, FPV Fest, Drone-Betting?

Also: AMA Outreach, Drone Theft, Dumb Drone Regs--In NJ, AMA Drone Report -- Help Wanted It’s never too late to start documenting history... even when it comes to topics like>[...]

Airborne-Unmanned 06.20.17: UAS Orgs v Bad Regs, Anti-Collision, Drone Race $$

Also: Solar-Powered UAS, NK Drone, UAS Survey, Brian Wynne Interview The team at AUVSI is staying plenty busy as they and 13 other organizations authored a letter to members of Con>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC