AD: Cessna | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 05.18.15

Airborne 05.19.15

Airborne 05.20.15

Airborne 05.21.15

Airborne 05.22.15

Airborne Hi-Def On YouTube

Airborne 05.18.15

Airborne 05.19.15

Airborne 05.20.15

Airborne 05.21.15

Airborne 05.22.15

 

Fri, Jun 24, 2005

AD: Cessna

AD NUMBER: 2005-13-10
MANUFACTURER: Cessna
SUBJECT: Airworthiness Directive 2005-13-10
SUMMARY: The FAA adopts a new airworthiness directive (AD) for certain Cessna Aircraft Company (Cessna) Models 172R, 172S, 182T, T182T, 206H, and T206H airplanes. This AD requires you to inspect any MC01-3A I.C. 9 or MC01-3A I.C. 10 main electrical power junction box circuit breakers for correct amperage (amp) (a correct 40-amp circuit breaker) and replace any incorrect amp circuit breaker with the correct 40-amp circuit breaker.

This AD results from several reports of circuit breakers that are not the correct 40-amp circuit breaker installed in the MC01-3A main electrical power junction box. We are issuing this AD to replace any incorrect circuit breaker installed in the MC01-3A I.C. 9 or MC01-3A I.C. 10 main electrical power junction box, which could result in premature tripping of the power junction box main feeder circuit breakers and could lead to partial or complete loss of all electrical power on the airplane. This condition could lead to the loss of all navigation and communication equipment and lighting in the cockpit.

FMI: www.airweb.faa.gov/ad

Advertisement

More News

ANN Special Report: Colorado NIMBYs Defeated... For Now

Vicious Campaign Against Skydiving Operation By Small, But Vocal, Group Loses Court Case News/Analysis by ANN CEO/Editor-In-Chief, Jim Campbell Those of us who work and play in the>[...]

Airborne 05.22.15: Falcon 5X Readies, Avidyne AD, LadiesLoveTaildraggers 2015

Also: Air Power Museum, ANN Could Use A Little Help From Its Friends, GE Honda, Mexican-Registry TBM 900, Legacy 500, BBJ Winglets, Wheels Up Order The new Falcon 5X is getting clo>[...]

Deadline For $30 Million Google Lunar XPRIZE Extended To End Of 2017

Progress Continues To Be Made To Return Humanity To The Moon XPRIZE and Google have officially confirmed a further extension of the $30 million Google Lunar XPRIZE. XPRIZE notes th>[...]

Aero-News: Quote Of The Day (05.25.15)

“It is the Sikorsky Innovations charter to identify the toughest challenges in vertical flight, and to demonstrate solutions to them. Getting an all-new aircraft into flight,>[...]

S-97 Raider Starts Flight Test Program

CoAxial Helo Heralds Development Of Exciting New Rotorcraft We knew it was close... and now it's real. Sikorsky has confirmed the successful first flight of the S-97 RAIDER helicop>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC