First Flight: Tranche 2 Eurofighter Typhoon | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Jan 17, 2008

First Flight: Tranche 2 Eurofighter Typhoon

The first Tranche 2 Eurofighter Typhoon has made its first flight at EADS Military Air Systems' site in Manching. Instrumented Production Aircraft Seven (IPA7) was piloted by EADS Test Pilot Chris Worning.

The aircraft, a German single seat variant, represents the full Tranche 2 build standard and its first prominent task will be to accomplish Type Acceptance for Block 8, the first capability standard of Tranche 2, in April 2008. This work will be carried out together with the BAE Systems-operated IPA6 based at Warton. IPA6 (BS031) is essentially a Tranche 1 standard aircraft but utilises the full Tranche 2 mission computer suite and avionics features. The first series of EJ200 engine flight testing for Tranche 2 was successfully concluded at the end of November with IPA2 in Italy.

The significant Tranche 2 capabilities focus mainly on the new mission computers which deliver the higher processing and memory capacity required for the integration of future weapons such as Meteor, Storm Shadow and Taurus. Differences in the build standard to Tranche 1 are related to changes in production technology or obsolescence.

Based on the Tranche 2 production contract, signed on 14 December 2004, and the original export contract with Austria, the Eurofighter consortium will deliver 251 Tranche 2 weapon systems: 91 to the United Kingdom, 79 to Germany (including 15 aircraft originally contracted by Austria), 47 to Italy and 34 to Spain. Deliveries of Tranche 2 Eurofighter Typhoons to all four Partner Nations will begin in Summer 2008 and are scheduled to run until 2013. 32 aircraft are already in final assembly at the partner companies Alenia Aeronautica, BAE Systems, EADS CASA and EADS Deutschland.

FMI: www.eurofighter.com

Advertisement

More News

Aero-News: Quote of the Day (04.17.24)

"Sometimes, growth makes it easy to miss the little things, and today's "little guy" is smarting more than ever just looking at the price tags of "cheap" aircraft. Poberezny, seein>[...]

ANN's Daily Aero-Linx (04.17.24)

Aero Linx: Space Medicine Association (SMA) The Space Medicine Association of the Aerospace Medical Association is organized exclusively for charitable, educational, and scientific>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

Airborne 04.11.24: SnF24!, King's 50th, Top Rudder, Aileronics

Also: Flight Club, Jet Shades, MyGoFlight’s FlightFlix Acquisition FIFTY YEARS! What a milestone for the aviation world’s master aero-education duo! John, Martha, along>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC