NASA Plans To Roll Atlantis Back Sunday | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Mar 04, 2007

NASA Plans To Roll Atlantis Back Sunday

Crews Will Inspect Hail Damage

Fingers are crossed at NASA, as crews prepare to roll back the space shuttle Atlantis to the Vehicle Assembly Building in order to better assess damage caused by a storm last week. Roll back is currently targeted for Sunday morning.

As Aero-News reported, the STS-117 vehicle stack is returning to the VAB so engineers and technicians can thoroughly inspect the shuttle for hail damage that resulted from a violent storm on Monday evening. Once inspections are complete, a decision will be made on the type of repair necessary and the time needed for that work.

On Thursday, workers at the pad offloaded the fuel and oxidizer from the orbiter maneuvering system tanks. Crews opened the orbiter's payload bay doors, and work was underway Saturday to remove the payload from the cargo bay. Demating of the shuttle from the pad systems continued through Saturday, with rotation of the pads' rotating service structure scheduled for early Sunday morning.

Earlier in the week, the Space Shuttle Program managers met for a two-day STS-117 Flight Readiness Review. During this meeting managers and engineers review risks associated with the mission and determine whether the shuttle's equipment, support systems and procedures are ready for flight.

At the conclusion of the FRR, there was a unanimous decision to proceed with the STS-117 mission, pending resolution of the open work to make necessary repairs to the hail damage on the shuttle.

FMI: www.nasa.gov/mission_pages/shuttle/news/index.html

Advertisement

More News

SpaceX to Launch Inversion RAY Reentry Vehicle in Fall

Inversion to Launch Reentry Vehicle Demonstrator Aboard SpaceX Falcon 9 This fall, the aerospace startup Inversion is set to launch its Ray reentry demonstrator capsule aboard Spac>[...]

Aero-News: Quote of the Day (04.23.24)

"We are excited to accelerate the adoption of electric aviation technology and further our journey towards a sustainable future. The agreement with magniX underscores our commitmen>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.20.24)

Aero Linx: OX5 Aviation Pioneers Each year a national reunion of OX5 Aviation Pioneers is hosted by one of the Wings in the organization. The reunions attract much attention as man>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC