Northrop Grumman Gets The Nod From NASA | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.09.24

Airborne-Unlimited-04.10.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Oct 14, 2004

Northrop Grumman Gets The Nod From NASA

Will Help With ID/IQ

Northrop Grumman Corporation says it's been awarded a $39 million contract to help NASA's Langley Research Center, Hampton (VA) mature key airframe structures technologies under a recently awarded indefinite delivery/ indefinite quantity (ID/IQ) contract.

Northrop Grumman won the contract for its Structures and Materials and Aerodynamic, Aerothermodynamic, and Acoustics Technology for Aerospace Vehicles (SMAcTAV) proposal.  Under the five-year contract, the company will compete for up to $39 million in total task orders.  Award levels are expected to range from $200,000 to $1 million.

"This award recognizes Northrop Grumman's leadership in the development of innovative, mission-enabling airframe structures technologies," said Allen Lockyer, manager of advanced structures development for the company's Integrated Systems sector.  "These skills have contributed heavily to the company's development of platforms such as the B-2 stealth bomber, the Global Hawk aerial reconnaissance system and several advanced, high-altitude surveillance assets."

An ID/IQ contract is a funding vehicle that allows U.S. government customers to allocate a set amount of funding to a general category of activities for a prescribed amount of time.  Over the life of the contract, task orders are defined and awarded to individual contractors to conduct particular activities.  Under the ID/IQ approach, NASA can issue a task order for which all contractors compete or it can award funds on a sole-source basis to a company that has proposed a unique technology development idea.

"ID/IQ task order contracts give the government a flexible, cost-effective way to have aerospace contractors conduct unique, short-duration research projects," explained Tod Palm, Northrop Grumman's program manager for the ID/IQ contract.  "These projects provide opportunities for large contractors and small businesses alike to gain knowledge and experience that could help them win larger government contracts in the future."

According to Palm, Northrop Grumman expects task orders under the SMAcTAV contract to relate to the following topics: structural mechanics and durability; structural dynamics; aeroelasticity and flight controls; metals and thermal structures; analytical and computational methods; advanced materials; materials processing; configuration aerodynamics; acoustics; aerothermodynamics; and hypersonic air-breathing propulsion.

FMI: www.northropgrumman.com

Advertisement

More News

ANN's Daily Aero-Linx (04.13.24)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (04.13.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC