Navy to Begin Initial Production Of P-8A | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne-Unmanned w/AUVSI

Airborne On ANN

AMA 08.10.17

Airborne 08.14.17

Airborne 08.15.17

Airborne 08.16.17

Airborne 08.17.17

Airborne 08.11.17

Airborne-Unmanned 08.15.17

Airborne-YouTube

AMA 08.10.17

Airborne 08.14.17

Airborne 08.15.17

Airborne 08.16.17

Airborne 08.17.17

Airborne 08.11.17

Airborne-Unmanned 08.15.17

NEW!!! 2017 AirVenture Innovation Preview -- YouTube Presentation / Vimeo Presentation

Wed, Jan 26, 2011

Navy to Begin Initial Production Of P-8A

This First LRIP Contract Also Includes Spares, Logistics And Training Devices

The U.S. Navy announced today the award of a $1.6 billion contract to Boeing for P-8A Poseidon aircraft Low-Rate Initial Production (LRIP) of six aircraft. This first LRIP contract also includes spares, logistics and training devices. Production of the first LRIP aircraft will begin this summer at Boeing's Renton, Wash. facility.

"In 2004, the U.S. Navy and the Boeing Company made a commitment to deliver the next generation maritime patrol and reconnaissance aircraft to support a 2013 Initial Operational Capability (IOC)," said Capt. Mike Moran, PMA 290 Program Manager. "This contract and these aircraft keep that commitment on track."

Three of the six flight test aircraft, built as part of the System Development and Demonstration contract awarded to Boeing in 2004, are in various stages of testing at Naval Air Station Patuxent River, Md. The Integrated Test Team has conducted sonobuoy releases and counter measures deployments.

Recently, one of two static test planes completed full scale testing on the P-8A airframe. The first static test aircraft underwent 154 different tests with no failure of the primary structure. The second aircraft will begin fatigue testing this year. The U.S. Navy plans to purchase 117 production P-8A aircraft to replace its P-3 Fleet. IOC is planned for 2013 at NAS Jacksonville, Fla.

FMI: www.navair.navy.mil

Advertisement

More News

RFP: ANN Seeking New Site/Facility For Major Studio Upgrade

It's Official: Aggressive Upgrades For New Airborne Programs WILL Require New Digs It's been in development for years, but we're getting to a point where we think we can pull off s>[...]

AMA Drone Report 08.10.17: AMA Gov't Outreach, Nat'l Model Av Day, Lego Drones

Also: Volaero Tracks Pythons, Army v DJI, Snap Acquiring Drone?, Orlando Backs Down There’s no rest for the folks at AMA that deal with the politics that comes with flying ho>[...]

Airborne-Unmanned 08.15.17: Reno Drone Races, DoD CrackDown, Blue Angels v UAV?

Also: Kansas DOT-AirMap, CIRRUAS Drone Program, Daytona Beach PD UAS, Virginia UAS SAR The Reno Air Racing Association has signed an agreement with the MultiGP Drone Racing League >[...]

Airborne 08.15.17: Lycoming AD, Reno Drone Racing!, Santa Monica NIMBYs

Also: Icon A5 Accident, Aero-Calendar, Land Remote Sensing, Storm Aviation, Frontier, World Helicopter Day, Hubble The FAA has issued an Airworthiness Directive (AD) for the connec>[...]

Airborne 08.14.17: Concorde Return?, KSMO RWY Plans, DC Overflights

Also: San Mateo $$, Verhees Delta, Midwest Express, BizAv Activity, Cal Fire, AAR Ldg Gear, jetAVIVA The Concorde SST was retired in 2003 by British Airways and Air France after th>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC