SpaceX Pushes Back Launch Date | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 10.01.14 ** HD iPad-Friendly -- Airborne 10.01.14 **
** Airborne 09.29.14 ** HD iPad-Friendly -- Airborne 09.29.14 **
** Airborne 09.26.14 ** HD iPad-Friendly -- Airborne 09.26.14 **

Tue, Apr 24, 2012

SpaceX Pushes Back Launch Date

Says More Time Required To Finish Hardware Testing, Data Review

SpaceX said Monday in an e-mail that it has decided to delay it's COTS 2 launch, citing technical difficulties.

"After reviewing our recent progress, it was clear that we needed more time to finish hardware-in-the-loop testing and properly review and follow up on all data." the e-mail stated. "While it is still possible that we could launch on May 3rd, it would be wise to add a few more days of margin in case things take longer than expected. As a result, our launch is likely to be pushed back by one week, pending coordination with NASA."

No new target date has been set for the launch attempt.

The launch window had been a single instantaneous opportunity at 1222 EDT April 30th.

The planned misson calls for SpaceX's Dragon capsule will conduct a series of check-out procedures to test and prove its systems, including rendezvous and berthing with the International Space Station (ISS). The primary objectives for the flight include a flyby of the ISS at a distance of approximately 1.5 miles to validate the operation of sensors and flight systems necessary for a safe rendezvous and approach. The spacecraft also will demonstrate the ability to abort the rendezvous. After these capabilities are successfully proven, the Dragon will be cleared to berth with the ISS approximately four days after launch. (Top photo ANN staff. Bottom image provided by SpaceX)

FMI: www.spacex.com

Advertisement

More News

AeroSports Update: 38th World Military Parachuting Championship

Countries From Around The World Participated In The 38th World Military Parachuting Championship Competition In Indonesia The competition is part of a program administered through >[...]

ANN's Daily Aero-Linx (10.01.14)

NBAA/CAN Soiree One of the much-anticipated events of the NBAA conference, being held this year in Orlando.>[...]

ANN's Daily Aero-Term (10.01.14): Fixed Slot

A fixed, nozzle shaped opening near the leading edge of a wing that ducts air onto the top surface of the wing.>[...]

Aero-News: Quote Of The Day (10.01.14)

“SNC is offering access to crewed or uncrewed space missions." Source: John Roth, vice president of business development for SNC’s Space Systems.>[...]

ANN FAQ: Feel The Propwash!

Get Aero-News Delivered To Your E-Mail We know you, like many of our readers, make it a point to check out the latest news and information daily on Aero-News... but did you know th>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC