SpaceX Pushes Back Launch Date | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne-Unmanned w/AUVSI

Airborne On ANN

AMA 03.23.17

Airborne
03.27.17

Airborne
03.28.17

Airborne
03.29.17

Airborne
03.30.17

Airborne 03.24.17

Airborne-Unmanned 03.28.17

Airborne-YouTube

AMA 03.23.17

Airborne
03.27.17

Airborne
03.28.17

Airborne
03.29.17

Airborne
03.30.17

Airborne 03.24.17

Airborne-Unmanned 03.28.17

Tue, Apr 24, 2012

SpaceX Pushes Back Launch Date

Says More Time Required To Finish Hardware Testing, Data Review

SpaceX said Monday in an e-mail that it has decided to delay it's COTS 2 launch, citing technical difficulties.

"After reviewing our recent progress, it was clear that we needed more time to finish hardware-in-the-loop testing and properly review and follow up on all data." the e-mail stated. "While it is still possible that we could launch on May 3rd, it would be wise to add a few more days of margin in case things take longer than expected. As a result, our launch is likely to be pushed back by one week, pending coordination with NASA."

No new target date has been set for the launch attempt.

The launch window had been a single instantaneous opportunity at 1222 EDT April 30th.

The planned misson calls for SpaceX's Dragon capsule will conduct a series of check-out procedures to test and prove its systems, including rendezvous and berthing with the International Space Station (ISS). The primary objectives for the flight include a flyby of the ISS at a distance of approximately 1.5 miles to validate the operation of sensors and flight systems necessary for a safe rendezvous and approach. The spacecraft also will demonstrate the ability to abort the rendezvous. After these capabilities are successfully proven, the Dragon will be cleared to berth with the ISS approximately four days after launch. (Top photo ANN staff. Bottom image provided by SpaceX)

FMI: www.spacex.com

Advertisement

More News

Airborne 03.27.17: Continental Motors ‘Overhaul’, Amazon Rotor, SpaceX DroneShip

Also: Boom Supersonic, Boeing 747-8, Boeing Grant, IKE's 300,000th, Rocket Lab, Duncan Aviation, Xplorer Mini Continental Motors seems to have a lot of faith in the future of aviat>[...]

Airborne 03.28.17: Dynon ADS-B/WX Recvrs, B-29 'Doc' Touring!, Atlanta Tech

Also: Safety Focus, Aero-Calendar, Mechanic Pay, Alaska Airlines, GAMA, CA Aviation Hall Of Fame, Gogo Biz 4G Dynon’s new dual band SV-ADSB-472 receives ADS-B traffic via 978>[...]

Racing Aircraft 'Hot Stuff' Involved In Runway Accident Won't Be Racing

Scratches The Airplane From National Air Race In Reno The iconic World Cup winner and Formula 1 Air Racer "Hot Stuff", flown by Thom Richard will not be participating in the 2017 R>[...]

The European Union And South Asia Strengthen Ties In Civil Aviation

New Technical Cooperation Project Managed By EASA Unveiled The European Union (EU) and South Asian states recently celebrated the launch of a new project to enhance their ties in c>[...]

AD: The Boeing Company Airplanes

AD Number: 2017-06-09 Product: Certain Boeing Model 787-8 airplanes.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC