AD: Airbus Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date






Airborne On ANN

Airborne 11.23.15

Airborne 11.24.15

Airborne 11.25.15

Airborne 11.19.15

Airborne 11.20.15

Airborne Hi-Def On YouTube

Airborne 11.23.15

Airborne 11.24.15

Airborne 11.25.15

Airborne 11.19.15

Airborne 11.20.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Wed, Jun 27, 2012

AD: Airbus Airplanes

AD NUMBER: 2012-12-12

PRODUCT: All Airbus Model A330-200 series airplanes; Airbus Model A330-200 Freighter series airplanes; Airbus Model A330-300 series airplanes; Airbus Model A340-200 series airplanes; and Airbus Model A340-300 series airplanes.
SUBJECT: Airworthiness Directive 2012-12-12
ACTION: Final Rule

SUMMARY: This AD was prompted by reports of sheared fasteners located on the outside skin of the forward cargo door and cracks on the frame fork ends, as well as cracks of the aft cargo door frame 64A. This AD requires performing a detailed inspection of the outer skin rivets at the frame fork ends of the forward and aft cargo door for sheared, loose, and missing rivets; repairing the outer skin rivets, if necessary; and performing repetitive inspections. The FAA is issuing this AD to detect and correct sheared, loose, or missing fasteners on the forward and aft cargo door frame, which could result inthe loss of structural integrity of the forward and aft cargo door.

DATES: This AD becomes effective July 30, 2012.



More News

Airborne 11.25.15: Blue Origin Reusable Rocket!, AMA Reacts, Transgender Pilots

Also: UK CAA, E-Fest 2015, Citizens In Space, Gulfstream G500, Dassault Falcon Jet, CFM LEAP-1A, Tuskegee's Milton Crenchaw ANN Airborne Link: /index.cfm?do=video.playVideo&vid>[...]

Klyde Morris (11.20.15)

Klyde Is SO Ready For An Upgrade... FMI:>[...]

FlightSafety International Further Enhances Gulfstream G650 Training

Simulator Upgrades Include Autobrake Systems For Initial And Recurrent Training FlightSafety continues to enhance its Gulfstream G650 training program with upgrades to the simulato>[...]

Spirit Begins Production Of First Production RAAF P-8A

Aircraft Scheduled For Delivery In Early 2016 Spirit AeroSystems Inc. has begun production of the Royal Australian Air Force's (RAAF) first production P-8A aircraft. Spirit started>[...]

Aero-News: Quote Of The Day (11.30.15)

"ICARUS is going to revolutionize how we approach pilot training. It provides experience to student pilots that we cannot provide right now outside of a simulator. This product wil>[...]

blog comments powered by Disqus





© 2007 - 2015 Web Development & Design by Pauli Systems, LC