Report: Boeing May Decide Soon On Expanding 787 Production | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Aug 21, 2007

Report: Boeing May Decide Soon On Expanding 787 Production

Aims To Increase Dreamliner Deliveries To 10 Per Month

Even as the company faces questions regarding when its revolutionary 787 Dreamliner will take to the skies for the first time, Boeing is also looking ahead towards full-scale production of its 787 Dreamliner... and how the company will best be able to send the 684 planes ordered to date, out the door.

In an interview with Bloomberg this week, Giorgio Zappa -- General Manager of Italy's Finmeccanica SpA, whose airplane unit is manufacturing 14 percent of the Dreamliner's composite body -- said Boeing may decide to increase planned 787 production from seven to 10 planes per month very soon.

"I believe it will make this decision in the next few weeks, and we have already started with the pre-project phase of our investment," Zappa said Monday.

Alenia Aeronautica is now contracted to provide components for seven fuselage assemblies per month. The company builds two fuselage sections, as well as the aircraft's vertical stablilizer.

Boeing's Mike Bair, who oversees the 787 program, said earlier this year the planemaker plans to deliver 112 planes by the end of 2009, and was examining options on how to build on that figure in later years.

On Monday, a Boeing spokesman said the company is still working on the situation.

"We are currently undergoing a production-rate study to determine if we are able to increase rates starting in 2011, but ... we don't have a specific date or timeline for when this decision will be made," spokesman Adam Morgan said.

As ANN reported, Boeing recently acknowledged reports the first flight of the 787, originally planned to occur by the end of August, had slipped to late September... and possibly into October. Difficulties with installing flight control systems and software, and getting those components "talking" with other systems in the highly-integrated airliner, are said to be behind the delay.

Boeing's goal for first flight of the Dreamliner remains late-September, with certification in May 2008. First customer deliveries are set to occur soon after that.

FMI: www.boeing.com

Advertisement

More News

SpaceX to Launch Inversion RAY Reentry Vehicle in Fall

Inversion to Launch Reentry Vehicle Demonstrator Aboard SpaceX Falcon 9 This fall, the aerospace startup Inversion is set to launch its Ray reentry demonstrator capsule aboard Spac>[...]

Aero-News: Quote of the Day (04.23.24)

"We are excited to accelerate the adoption of electric aviation technology and further our journey towards a sustainable future. The agreement with magniX underscores our commitmen>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.20.24)

Aero Linx: OX5 Aviation Pioneers Each year a national reunion of OX5 Aviation Pioneers is hosted by one of the Wings in the organization. The reunions attract much attention as man>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC