Bombardier Targeting Longer Maintenance Check Intervals For CSeries Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, May 30, 2013

Bombardier Targeting Longer Maintenance Check Intervals For CSeries Aircraft

Line Maintenance Check Proposed At 850 Flight Hours, Base Maintenance Check At 8,500 Flight Hours

At its European Regional Review in Munich, Germany, Bombardier Aerospace said that that prior to the airliner’s entry-into-service, it is targeting CSeries aircraft line maintenance checks (“A Checks) at intervals of 850 flight hours and base maintenance checks (“C” Checks) at intervals of 8,500 flight hours.

Bombardier has been developing a Maintenance Steering Group 3 (MSG-3)-based maintenance program since October 2010 for the CSeries aircraft. Throughout the design evolution phase, the company has determined that line maintenance and base maintenance task intervals at, or in excess of, 850 and 8,500 flight hours respectively, can be achieved. The proposed maintenance plan will allow operators of CSeries aircraft to benefit from minimized downtime and more competitive maintenance costs, all while ensuring the inherent safety and reliability of the aircraft.

“These proposed intervals will provide our operators with a leading maintenance program for the CSeries aircraft,” said Todd Young, Vice President, Customer Services and Support, Bombardier Commercial Aircraft. “We believe that this offers further evidence of our commitment to provide competitive maintenance cost solutions for CSeries aircraft operators.”
 
The maintenance program for the CSeries aircraft remains under development using the MSG-3 process where analysis for systems, powerplant and structures are reviewed during working groups and approved by the CSeries aircraft Industry Steering Committee (ISC). Bombardier currently has multiple working group and ISC meetings prior to submitting the Maintenance Review Board Report to the Authorities for acceptance, prior to entry-into-service in 2014.

(Image provided by Bombardier)

FMI: www.bombardier.com

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC