Back To Work: Gulfstream Resumes G650 Flight Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne-Unmanned w/AUVSI

Airborne On ANN

AMA 08.17.17

Airborne 08.14.17

Airborne 08.15.17

Airborne 08.16.17

Airborne 08.17.17

Airborne 08.18.17

Airborne-Unmanned 08.15.17

Airborne-YouTube

AMA 08.17.17

Airborne 08.14.17

Airborne 08.15.17

Airborne 08.16.17

Airborne 08.17.17

Airborne 08.18.17

Airborne-Unmanned 08.15.17

NEW!!! 2017 AirVenture Innovation Preview -- YouTube Presentation / Vimeo Presentation

Sun, May 29, 2011

Back To Work: Gulfstream Resumes G650 Flight Testing

Gulfstream Says Certification Still Anticipated For 2011

Gulfstream has resumed the G650 flight-test program, following a temporary suspension of flying after an April 2 accident. The first flight since the accident took place May 28, with Serial Number 6001 flying for 1 hour and 39 minutes. The crew included senior experimental test pilots Jake Howard and Tom Horne and Flight Test Engineer Bill Osborne.

"We have conducted all the necessary reviews to assure ourselves that we can safely resume the flight-test program at this point," said Pres Henne, senior vice president, Programs, Engineering and Test, Gulfstream.

"We have worked closely with the Federal Aviation Administration in this process and received the agency's concurrence to resume flight testing. It is our responsibility to move forward with the flight-test program, and we will do so in a safe and prudent manner. The G650 will enter service as the flagship of our product line, where it will represent the very best in business aviation technology."
 
To date, the G650 flight-test program has accomplished 470 flights, accumulating 1,560 hours towards the estimated 2,200 hours required for certification. Gulfstream resumed flying with the four remaining flight-test aircraft. The company still anticipates certification in 2011, with service entry in 2012, as was originally planned at the aircraft's public launch in 2008.

Gulfstream continues to cooperate with the National Transportation Safety Board (NTSB) in its investigation.

FMI: www.gulfstream.com, www.generaldynamics.com

Advertisement

More News

ONE Aviation 'Canada' Program Unveils First Developmental Airframe

One Of A Series Of Sequential Prototypes Will Help Develop The Forthcoming EA-700 The ONE Aviation 'Canada' program, which ANN exclusively detailed last year for the first time, is>[...]

Garmin Receives EASA Approval For New GTN 650/750 Features

Tailored Specifically For European Operators Garmin is pleased to announce an expanded feature set, an enhanced user interface and additional wireless connectivity solutions for it>[...]

Airborne-Unmanned 08.15.17: Reno Drone Races, DoD CrackDown, Blue Angels v UAV?

Also: Kansas DOT-AirMap, CIRRUAS Drone Program, Daytona Beach PD UAS, Virginia UAS SAR The Reno Air Racing Association has signed an agreement with the MultiGP Drone Racing League >[...]

RFP: ANN Seeking New Site/Facility For Major Studio Upgrade

It's Official: Aggressive Upgrades For New Airborne Programs WILL Require New Digs It's been in development for years, but we're getting to a point where we think we can pull off s>[...]

Airborne 08.17.17: GA Sales Report, Google Lunar XPRIZE, ATC Privatization

Also: Gustave Whitehead, AirVenture Innovation Preview, Learjet 75, HondaJet, ALEA, Honeywell, F-5N GAMA has published second quarter GA airplane shipment and billings data. The ge>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC