Utilicraft To Metalcraft: Go Ahead | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Feb 10, 2005

Utilicraft To Metalcraft: Go Ahead

Construction To Begin On Fuselage Sub-Assembly

Utilicraft Aerospace Industries says it's given Metalcraft Technologies, Inc. (MTI) the "go ahead" to start construction of the initial sub-assembly center-fuselage-section of the prototype FF-1080-300 aircraft, as per the terms of the Manufacturing Agreement executed between the companies late last year.

After several months of extensive meetings between engineers and executives representing both companies, MTI and Utilicraft reached a decision this week to go forward with "cutting metal" on the first pieces of the constant section (main cargo bay) of the fuselage.

Chuck Taylor, Vice President of MTI stated, "We are very pleased to be part of the Utilicraft program, and are excited about commencing construction of the FF-1080-300 prototype aircraft. MTI has been working with John Dupont and his management team on the program since 1998. We are very impressed with their professionalism regarding the design and development of the aircraft, as well as the on-going development of their company in today's aerospace and financial markets."

When completed, the center fuselage section will accommodate up to ten LD-3 containers or seven of the larger "A" series containers with as much as 10 tons of revenue pounds on board -- on the production versions of the aircraft.

Details of the progress of the on-going construction of the center fuselage assembly will be the topic of a series of on-going joint-releases by Utilicraft and MTI that will track the schedule and milestones of the prototype aircraft -- leading to first flight.

Under the terms of the contract entered into last year by the companies, MTI will provide the following for the initial FF-1080 prototype, first article test aircraft, and up to 528 production aircraft:

Manufacture of all of the details for the forward, center, and aft fuselage and empennage assemblies.

Design and manufacture of all required assembly jigs and fixtures.

Assembly of the forward and aft sections of the fuselage (including horizontal and vertical stabilizers) at their facility in Cedar City, Utah.

Technical assistance and supervision for the assembly of the center fuselage by Utilicraft.

Technical assistance and supervision for the mating of the forward, center, and aft fuselage, and empennage assemblies at the Utilicraft final assembly facility, planned to be located at the Double Eagle II Airport, in Albuquerque, NM.

FMI: www.utilicraft.com

Advertisement

More News

ANN's Daily Aero-Linx (04.17.24)

Aero Linx: Space Medicine Association (SMA) The Space Medicine Association of the Aerospace Medical Association is organized exclusively for charitable, educational, and scientific>[...]

ANN's Daily Aero-Term (04.17.24): Jamming

Jamming Denotes emissions that do not mimic Global Navigation Satellite System (GNSS) signals (e.g., GPS and WAAS), but rather interfere with the civil receiver's ability to acquir>[...]

ANN's Daily Aero-Linx (04.18.24)

Aero Linx: Warbirds of America The EAA Warbirds of America, a division of the Experimental Aircraft Association in Oshkosh, Wisconsin, is a family of owners, pilots and enthusiasts>[...]

Aero-News: Quote of the Day (04.18.24)

"From New York to Paris, this life-size replica of the Webb Telescope inspired communities around the world and, in doing so, invited friends and families to explore the cosmos tog>[...]

ANN's Daily Aero-Term (04.18.24): Hold-In-Lieu Of Procedure Turn

Hold-In-Lieu Of Procedure Turn A hold-in-lieu of procedure turn shall be established over a final or intermediate fix when an approach can be made from a properly aligned holding p>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC