Embraer Executive Jets Launches Legacy 450 Fabrication | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 04.13.15

Airborne 04.14.15

Airborne 04.15.15

Airborne 04.16.15

Airborne 04.17.15

Airborne Hi-Def On YouTube

Airborne 04.13.15

Airborne 04.14.15

Airborne 04.15.15

Airborne 04.16.15

Airborne 04.17.15

Wed, Aug 15, 2012

Embraer Executive Jets Launches Legacy 450 Fabrication

First Parts Milled For The New Bizjet

Embraer Executive Jets passed a major milestone in the mid-light Legacy 450 program last week when the first part was milled for the business jet, ushering in the beginning of fabrication. "Even as we have been making progress on the Legacy 500, we have been anticipating this event for the Legacy 450,” said Ernest Edwards, President, Embraer Executive Jets. “The first metal cut for the Legacy 450 is a landmark event for the program and is the latest step in bringing this, the second of our revolutionary jets to reality.”

A component of the forward fuselage, the part was milled from a block of aluminum alloy by a five-axis, high-performance machining center. Fully automated, the milling process drew data directly from a digital mockup of the 2,300-nm-range Legacy 450. Once completed, the part was approved by a quality control process that employed the use of laser devices for design validation with the digital mockup.
 
The Legacy 450 is designed with the latest engineering software, CATIA V5, with production planning for the business aircraft simulated by digital virtual manufacturing software. The first metal cut comes after the completion of the Joint Definition Phase for the aircraft in May. The Detailed Design and Certification Phase is ongoing and the Critical Design Reviews are scheduled to be completed at the end of August.
 
For both the Legacy 450 and mid-size Legacy 500, Embraer has completed more than 8,000 systems test hours with 2,500 hours logged on the Iron Bird since November 2010. The two aircraft bring fly-by-wire technology to the mid-light and mid-size segments for the first time.

(Images provided by Embraer)

FMI: www.embraer.com


Advertisement

More News

Garmin Enhances New And Existing G500 And G600 Glass Flight Display Systems

ADS-B Display Capability, Faster & Modernized Mapping Now Included Garmin has rolled out enhanced capability and an expanded feature set for the G500/G600 glass flight display >[...]

Airborne 04.17.15: DC Gyroplane Fallout, ICAS Airshow Update, Message To Space

Also: Blue Origin, Flying Cucumber?, BBJ Combi, NetJets Partners w/Ohio State, ExIm Helo Deal, Long-Range Navy UAS Obviously, the stunt pulled by Douglas Hughes of Ruskin, Florida >[...]

Airborne 04.16.15: Record-Setting AEA15, 9000 RVs!!!, ULA's 'Vulcan'

Also: DJI Phantom 3, API Update, Skyhawks In China, Air Methods Fined, Naming Pluto Features, Era Group Sale The 58th annual Aviation Electronics Association International Conventi>[...]

Airborne 04.17.15: DC Gyroplane Fallout, ICAS Airshow Update, Message To Space

Also: Blue Origin, Flying Cucumber?, BBJ Combi, NetJets Partners w/Ohio State, ExIm Helo Deal, Long-Range Navy UAS Obviously, the stunt pulled by Douglas Hughes of Ruskin, Florida >[...]

ANN's Daily Aero-Linx (04.18.15)

Seaplane Pilots Association The public section of the website for the Seaplane Pilots Association makes available hundreds of articles and discussions about seaplane Training, Advo>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC