Embraer Executive Jets Launches Legacy 450 Fabrication | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 01.16.17

Airborne 01.17.17

Airborne 01.18.17

Airborne 01.19.17

Airborne 01.20.17

Airborne Hi-Def On YouTube

Airborne 01.16.17

Airborne 01.17.17

Airborne 01.18.17

Airborne 01.19.17

Airborne 01.20.17

Wed, Aug 15, 2012

Embraer Executive Jets Launches Legacy 450 Fabrication

First Parts Milled For The New Bizjet

Embraer Executive Jets passed a major milestone in the mid-light Legacy 450 program last week when the first part was milled for the business jet, ushering in the beginning of fabrication. "Even as we have been making progress on the Legacy 500, we have been anticipating this event for the Legacy 450,” said Ernest Edwards, President, Embraer Executive Jets. “The first metal cut for the Legacy 450 is a landmark event for the program and is the latest step in bringing this, the second of our revolutionary jets to reality.”

A component of the forward fuselage, the part was milled from a block of aluminum alloy by a five-axis, high-performance machining center. Fully automated, the milling process drew data directly from a digital mockup of the 2,300-nm-range Legacy 450. Once completed, the part was approved by a quality control process that employed the use of laser devices for design validation with the digital mockup.
 
The Legacy 450 is designed with the latest engineering software, CATIA V5, with production planning for the business aircraft simulated by digital virtual manufacturing software. The first metal cut comes after the completion of the Joint Definition Phase for the aircraft in May. The Detailed Design and Certification Phase is ongoing and the Critical Design Reviews are scheduled to be completed at the end of August.
 
For both the Legacy 450 and mid-size Legacy 500, Embraer has completed more than 8,000 systems test hours with 2,500 hours logged on the Iron Bird since November 2010. The two aircraft bring fly-by-wire technology to the mid-light and mid-size segments for the first time.

(Images provided by Embraer)

FMI: www.embraer.com


Advertisement

More News

Airborne 01.20.17: Astro-NIMBY!, Airbus Flying Car, JetSuiteX v KSMO

Also: Daher Delivers, Aviation Progress, Tecnam P2012, D.B. Cooper, MH370 Search, T-45C Accident, Piper We previously reported that studies indicate many complaints about airport n>[...]

Airborne 01.20.17: Astro-NIMBY!, Airbus Flying Car, JetSuiteX v KSMO

Also: Daher Delivers, Aviation Progress, Tecnam P2012, D.B. Cooper, MH370 Search, T-45C Accident, Piper We previously reported that studies indicate many complaints about airport n>[...]

Airborne 01.19.17: $200K Drone Fine, Sandia IVSI TSO, 'Can't Close' KSMO

Also: MH370 Search Suspended, Supporting AUVSI, Sikorsky S-92, Challenger Astronaut, Stressed Pilots, JBA Aviation, Embraer E2 A settlement agreement has been reached between the F>[...]

ANN's Daily Aero-Linx (01.21.17)

The Lindbergh Foundation The concept of balance is an integral part of what the Lindbergh Foundation Board looks for in a project requesting a grant. Charles and Anne Morrow Lindbe>[...]

ANN's Daily Aero-Term (01.21.17): Jump Zone

The airspace directly associated with a Drop Zone. Vertical and horizontal limits may be locally defined.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC