Embraer Executive Jets Launches Legacy 450 Fabrication | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 09.19.16

Airborne 09.20.16

Airborne 09.21.16

Airborne 09.22.16

Airborne 09.23.16

Airborne Hi-Def On YouTube

Airborne 09.19.16

Airborne 09.20.16

Airborne 09.21.16

Airborne 09.22.16

Airborne 09.23.16

Wed, Aug 15, 2012

Embraer Executive Jets Launches Legacy 450 Fabrication

First Parts Milled For The New Bizjet

Embraer Executive Jets passed a major milestone in the mid-light Legacy 450 program last week when the first part was milled for the business jet, ushering in the beginning of fabrication. "Even as we have been making progress on the Legacy 500, we have been anticipating this event for the Legacy 450,” said Ernest Edwards, President, Embraer Executive Jets. “The first metal cut for the Legacy 450 is a landmark event for the program and is the latest step in bringing this, the second of our revolutionary jets to reality.”

A component of the forward fuselage, the part was milled from a block of aluminum alloy by a five-axis, high-performance machining center. Fully automated, the milling process drew data directly from a digital mockup of the 2,300-nm-range Legacy 450. Once completed, the part was approved by a quality control process that employed the use of laser devices for design validation with the digital mockup.
 
The Legacy 450 is designed with the latest engineering software, CATIA V5, with production planning for the business aircraft simulated by digital virtual manufacturing software. The first metal cut comes after the completion of the Joint Definition Phase for the aircraft in May. The Detailed Design and Certification Phase is ongoing and the Critical Design Reviews are scheduled to be completed at the end of August.
 
For both the Legacy 450 and mid-size Legacy 500, Embraer has completed more than 8,000 systems test hours with 2,500 hours logged on the Iron Bird since November 2010. The two aircraft bring fly-by-wire technology to the mid-light and mid-size segments for the first time.

(Images provided by Embraer)

FMI: www.embraer.com


Advertisement

More News

Aero-News: Quote of the Day (09.25.16)

"Amassing four million flight hours is a testament to the reliability of RPA systems that are designed, built, and maintained by a dedicated group of skilled and innovative profess>[...]

ANN's Daily Aero-Term (09.25.16): Discrete Code

Discrete Code As used in the Air Traffic Control Radar Beacon System (ATCRBS), any one of the 4096 selectable Mode 3/A aircraft transponder codes except those ending in zero zero; >[...]

ANN's Daily Aero-Linx (09.25.16)

Aero Linx: International Aviation Services Organization (IASO) International Aviation Services Organization (IASO) is a non-government organization, Ground Handling Industry Leader>[...]

ANN FAQ: What Does The API Mean To You

Engaging The Aviation World's Pivotal Organizations, Interests And Viewpoints The Airborne Partnership Initiative, we call it the API, is a plan developed by ANN CEO and Editor-In->[...]

Airborne 09.22.16: NATA v Santa Monica, Xodiac And XaeroB, Sikorsky Early?

Also: Solo Circumnavigation, Redbird Migration, Hartzell Propeller, WACO Air Museum, Corporate Angel, Legion Pod, Delta Compensation Last week two fixed base operations located on >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC