Boeing Begins Certification Testing On 747-8 Performance Improvements | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 11.21.14 ** HD iPad-Friendly -- Airborne 11.21.14 **
** Airborne 11.19.14 ** HD iPad-Friendly -- Airborne 11.19.14 **
** Airborne 11.17.14 ** HD iPad-Friendly -- Airborne 11.17.14 **

Thu, May 23, 2013

Boeing Begins Certification Testing On 747-8 Performance Improvements

Company Says Performance Package Improves Fuel Burn By Another 1.8 Percent

A Boeing 747-8 Intercontinental successfully completed its first test flight this week with a package of performance improvements including enhanced GE engines. This package is designed to improve the fuel efficiency of the jetliner. With Boeing Flight Test and Evaluation Capt. Kirk Vining and Chief Pilot Capt. Mark Feuerstein at the controls, the airplane took off from Paine Field in Everett, Wash. at 1330 PDT time and landed at Boeing Field in Seattle approximately four hours later.

"It was a great flight and the engines performed as expected," said Capt. Vining. "This is an important milestone for the flight test program."

The airplane Performance Improvement Package (PIP) includes improvements to the GEnx-2B engines and Flight Management Computer (FMC) software.

Boeing's continuous efforts to improve the 747-8 family have resulted in an accumulated 1.5 percent gain in fuel efficiency since the first airplane was delivered less than two years ago. These new improvements will give operators an airplane that is an additional 1.8 percent more efficient.

"These improvements are a part of our commitment to continually improve our great airplanes for our customers," said Eric Lindblad, vice president and general manager of the 747 program. "Improving fuel efficiency by another 1.8 percent saves the airlines approximately one million dollars per year in fuel per airplane and reduces the carbon footprint."

The test program will also validate the design changes and demonstrate the operation of the horizontal tank fuel system on the passenger version of the 747-8, which was deferred from the initial deliveries. The new configuration will first deliver in early 2014 and be available for retrofit. Entry into service of the new engines and FMC software will take place in late 2013.

(747-8 image from file)

FMI: www.boeing.com

Advertisement

More News

Airborne 11.21.14: AEA's 3Q/14 Report, Fantasy Of Flight, Modernizing The NAS

Also: Holland Wants Gold, FAA Strangling UAVs?, RAF WWII Trainer For Sale, Bf109s Live, Georgia v Aerospace Engineers The Aircraft Electronics Association has released its third-qu>[...]

Aero-News: Quote Of The Day (11.23.14)

"Reaching this stage that we call ATLO is a critical milestone. This is a very satisfying point of the mission as we transition from many teams working on their individual elements>[...]

ANN FAQ: Getting The Most Out Of ANN's Newsletters

ANN goes through a lot of trouble to make the graphics flashy and cool and an integral part of the story. But let's face it, they're bandwidth-intensive. So here are a couple of th>[...]

Air Force Funds Research On Thermal Management Technology For Fighters

Heat Generated By Electronic Systems A Growing Challenge Managing heat that is generated by electronic subsystems in next-generation aircraft is a vexing challenge for aerospace sy>[...]

Raytheon Successfully Demonstrates Airborne Electronic Attack System

Prototype Test Flights Evaluate Integrated Electronic Warfare Capabilities The U.S. Navy and Raytheon successfully demonstrated an end to end, first of its kind, integrated electro>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC