Boeing Begins Certification Testing On 747-8 Performance Improvements | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 08.22.16

Airborne 08.23.16

Airborne 08.24.16

Airborne 08.25.16

Airborne 08.26.16

Airborne Hi-Def On YouTube

Airborne 08.22.16

Airborne 08.23.16

Airborne 08.24.16

Airborne 08.25.16

Airborne 08.26.16

Tweet Us The Coolest Things You See @OSH16!
#OSH16Coolest!

It's Alive!: AirVenture 2016 Innovation Preview on Vimeo!

It's Alive!: AirVenture 2016 Innovation Preview on YouTube!

Thu, May 23, 2013

Boeing Begins Certification Testing On 747-8 Performance Improvements

Company Says Performance Package Improves Fuel Burn By Another 1.8 Percent

A Boeing 747-8 Intercontinental successfully completed its first test flight this week with a package of performance improvements including enhanced GE engines. This package is designed to improve the fuel efficiency of the jetliner. With Boeing Flight Test and Evaluation Capt. Kirk Vining and Chief Pilot Capt. Mark Feuerstein at the controls, the airplane took off from Paine Field in Everett, Wash. at 1330 PDT time and landed at Boeing Field in Seattle approximately four hours later.

"It was a great flight and the engines performed as expected," said Capt. Vining. "This is an important milestone for the flight test program."

The airplane Performance Improvement Package (PIP) includes improvements to the GEnx-2B engines and Flight Management Computer (FMC) software.

Boeing's continuous efforts to improve the 747-8 family have resulted in an accumulated 1.5 percent gain in fuel efficiency since the first airplane was delivered less than two years ago. These new improvements will give operators an airplane that is an additional 1.8 percent more efficient.

"These improvements are a part of our commitment to continually improve our great airplanes for our customers," said Eric Lindblad, vice president and general manager of the 747 program. "Improving fuel efficiency by another 1.8 percent saves the airlines approximately one million dollars per year in fuel per airplane and reduces the carbon footprint."

The test program will also validate the design changes and demonstrate the operation of the horizontal tank fuel system on the passenger version of the 747-8, which was deferred from the initial deliveries. The new configuration will first deliver in early 2014 and be available for retrofit. Entry into service of the new engines and FMC software will take place in late 2013.

(747-8 image from file)

FMI: www.boeing.com

Advertisement

More News

Airborne 08.26.16: Citation Longitude Update, Falcon 9 Display, N Shore Heli Rte

Also: Aerosim Scholarship, Santa Monica Nonsense, Marine One, UAV Developer Kit, FAA Penalty, F-35 Weapons Test, Coastal Helicopters The Cessna Citation Longitude moves closer to i>[...]

Another Tough Weekend For Airshows... Two Pilots Lost

Accidents in Oregon and China Take Lives It's been a lousy weekend to be an aviation journalist as we document the tragic loss of two well-known pilots in two separate airshows acc>[...]

Aero-News: Quote of the Day (08.28.16)

"This is the perfect natural laboratory to study aerosol-cloud interactions, which are some of the largest uncertainties in the prediction of future climate." Source: Jens Redemann>[...]

NASA Flies To Africa to Study Climate Effects Of Smoke On Clouds

Two Research Aircraft Head To Namibia Because Of Its Unique Climate NASA scientists and two research aircraft are on their way to a unique natural laboratory off the Atlantic coast>[...]

ANN's Daily Aero-Linx (08.28.16)

Aero Linx: Aviators Model Code Of Conduct Innovative tools advancing aviation safety and offering a vision of excellence for aviators, the AMCC is for use by aviation practitioners>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC