Boeing Begins Certification Testing On 747-8 Performance Improvements | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 04.18.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 04.18.14 **
** Airborne 04.16.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 04.16.14 **
** Airborne 04.14.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 04.14.14 **

Thu, May 23, 2013

Boeing Begins Certification Testing On 747-8 Performance Improvements

Company Says Performance Package Improves Fuel Burn By Another 1.8 Percent

A Boeing 747-8 Intercontinental successfully completed its first test flight this week with a package of performance improvements including enhanced GE engines. This package is designed to improve the fuel efficiency of the jetliner. With Boeing Flight Test and Evaluation Capt. Kirk Vining and Chief Pilot Capt. Mark Feuerstein at the controls, the airplane took off from Paine Field in Everett, Wash. at 1330 PDT time and landed at Boeing Field in Seattle approximately four hours later.

"It was a great flight and the engines performed as expected," said Capt. Vining. "This is an important milestone for the flight test program."

The airplane Performance Improvement Package (PIP) includes improvements to the GEnx-2B engines and Flight Management Computer (FMC) software.

Boeing's continuous efforts to improve the 747-8 family have resulted in an accumulated 1.5 percent gain in fuel efficiency since the first airplane was delivered less than two years ago. These new improvements will give operators an airplane that is an additional 1.8 percent more efficient.

"These improvements are a part of our commitment to continually improve our great airplanes for our customers," said Eric Lindblad, vice president and general manager of the 747 program. "Improving fuel efficiency by another 1.8 percent saves the airlines approximately one million dollars per year in fuel per airplane and reduces the carbon footprint."

The test program will also validate the design changes and demonstrate the operation of the horizontal tank fuel system on the passenger version of the 747-8, which was deferred from the initial deliveries. The new configuration will first deliver in early 2014 and be available for retrofit. Entry into service of the new engines and FMC software will take place in late 2013.

(747-8 image from file)

FMI: www.boeing.com

Advertisement

More News

Airborne 04.18.14: SpaceX's Historic Pad, Sikorsky Going Presidential?, EAA B17

Also: Airmen Support Pilot's Son, Beyond The Blue!, More Wrong-Way SWA Fallout, Missing WWII Airman Comes Home NASA signed an agreement with Space Exploration Technologies Corporat>[...]

Aero-TV: Dual GPS Solutions -- Maps, Weather, And Traffic To Your EFB Devices

Dual Boasts GPS Support for iOS or Android Platforms While at the AOPA 2013 convention, ANN CEO and Editor-In-Chief, Jim Campbell met with Greg Lukins, Vice President of Business D>[...]

Airborne 04.18.14: SpaceX's Historic Pad, Sikorsky Going Presidential?, EAA B17

Also: Airmen Support Pilot's Son, Beyond The Blue!, More Wrong-Way SWA Fallout, Missing WWII Airman Comes Home NASA signed an agreement with Space Exploration Technologies Corporat>[...]

ANN's Daily Aero-Linx (04.19.14)

The Art Of Airsickness Bags Have you succumbed to the unbridled joy of Air Sickness Bag Collecting? Do you have vomit fever (or, fever-induced vomiting)? Are you ever considering b>[...]

ANN's Daily Aero-Term (04.19.14): Navigable Airspace

Airspace at and above the minimum flight altitudes prescribed in the CFRs including airspace needed for safe takeoff and landing.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC