Boeing Begins Certification Testing On 747-8 Performance Improvements | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 09.19.14 ** HD iPad-Friendly -- Airborne 09.19.14 **
** Airborne 09.17.14 ** HD iPad-Friendly -- Airborne 09.17.14 **
** Airborne 09.15.14 ** HD iPad-Friendly -- Airborne 09.15.14 **

Thu, May 23, 2013

Boeing Begins Certification Testing On 747-8 Performance Improvements

Company Says Performance Package Improves Fuel Burn By Another 1.8 Percent

A Boeing 747-8 Intercontinental successfully completed its first test flight this week with a package of performance improvements including enhanced GE engines. This package is designed to improve the fuel efficiency of the jetliner. With Boeing Flight Test and Evaluation Capt. Kirk Vining and Chief Pilot Capt. Mark Feuerstein at the controls, the airplane took off from Paine Field in Everett, Wash. at 1330 PDT time and landed at Boeing Field in Seattle approximately four hours later.

"It was a great flight and the engines performed as expected," said Capt. Vining. "This is an important milestone for the flight test program."

The airplane Performance Improvement Package (PIP) includes improvements to the GEnx-2B engines and Flight Management Computer (FMC) software.

Boeing's continuous efforts to improve the 747-8 family have resulted in an accumulated 1.5 percent gain in fuel efficiency since the first airplane was delivered less than two years ago. These new improvements will give operators an airplane that is an additional 1.8 percent more efficient.

"These improvements are a part of our commitment to continually improve our great airplanes for our customers," said Eric Lindblad, vice president and general manager of the 747 program. "Improving fuel efficiency by another 1.8 percent saves the airlines approximately one million dollars per year in fuel per airplane and reduces the carbon footprint."

The test program will also validate the design changes and demonstrate the operation of the horizontal tank fuel system on the passenger version of the 747-8, which was deferred from the initial deliveries. The new configuration will first deliver in early 2014 and be available for retrofit. Entry into service of the new engines and FMC software will take place in late 2013.

(747-8 image from file)

FMI: www.boeing.com

Advertisement

More News

Aero-News: Quote Of The Day (09.21.14)

"The RCAF took the initiative to remove these functional, perfectly good parts and use them effectively. It was a sound decision, helping to ensure the long-term viability of the a>[...]

Enhanced F-35 Logistics Systems Delivered To Flight Test Locations

Integrates Preventative Maintenance, Flight Scheduling, And Mission Planning The 'next evolution' of the F-35 Lightning II's information technology backbone called the Autonomic Lo>[...]

Airbus Forecasts Strong Demand For Air Travel In The Middle East

Delivers First A380 To Qatar Airways Saying Airplane Is 'Ideal' For The Region Airbus has delivered Qatar Airways' first A380, and has used the occasion to tout the airplane as pla>[...]

NBAA Names 2014 Humanitarian Award Recipients

International Jet Aviation, Make-A-Wish Foundation, To Be Honored In Orlando The NBAA is pleased to announce that International Jet Aviation Services of Centennial, CO and the Make>[...]

NASA Seeks America's 'Best And Brightest' For Research Fellowships

Applications Period Open For Space Technology Grants NASA is seeking applications from U.S. graduate students for the agency's Space Technology Research Fellowships. The research g>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC