Boeing Begins Certification Testing On 747-8 Performance Improvements | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 04.13.15

Airborne 04.14.15

Airborne 04.15.15

Airborne 04.16.15

Airborne 04.17.15

Airborne Hi-Def On YouTube

Airborne 04.13.15

Airborne 04.14.15

Airborne 04.15.15

Airborne 04.16.15

Airborne 04.17.15

Thu, May 23, 2013

Boeing Begins Certification Testing On 747-8 Performance Improvements

Company Says Performance Package Improves Fuel Burn By Another 1.8 Percent

A Boeing 747-8 Intercontinental successfully completed its first test flight this week with a package of performance improvements including enhanced GE engines. This package is designed to improve the fuel efficiency of the jetliner. With Boeing Flight Test and Evaluation Capt. Kirk Vining and Chief Pilot Capt. Mark Feuerstein at the controls, the airplane took off from Paine Field in Everett, Wash. at 1330 PDT time and landed at Boeing Field in Seattle approximately four hours later.

"It was a great flight and the engines performed as expected," said Capt. Vining. "This is an important milestone for the flight test program."

The airplane Performance Improvement Package (PIP) includes improvements to the GEnx-2B engines and Flight Management Computer (FMC) software.

Boeing's continuous efforts to improve the 747-8 family have resulted in an accumulated 1.5 percent gain in fuel efficiency since the first airplane was delivered less than two years ago. These new improvements will give operators an airplane that is an additional 1.8 percent more efficient.

"These improvements are a part of our commitment to continually improve our great airplanes for our customers," said Eric Lindblad, vice president and general manager of the 747 program. "Improving fuel efficiency by another 1.8 percent saves the airlines approximately one million dollars per year in fuel per airplane and reduces the carbon footprint."

The test program will also validate the design changes and demonstrate the operation of the horizontal tank fuel system on the passenger version of the 747-8, which was deferred from the initial deliveries. The new configuration will first deliver in early 2014 and be available for retrofit. Entry into service of the new engines and FMC software will take place in late 2013.

(747-8 image from file)

FMI: www.boeing.com

Advertisement

More News

Garmin Enhances New And Existing G500 And G600 Glass Flight Display Systems

ADS-B Display Capability, Faster & Modernized Mapping Now Included Garmin has rolled out enhanced capability and an expanded feature set for the G500/G600 glass flight display >[...]

Airborne 04.17.15: DC Gyroplane Fallout, ICAS Airshow Update, Message To Space

Also: Blue Origin, Flying Cucumber?, BBJ Combi, NetJets Partners w/Ohio State, ExIm Helo Deal, Long-Range Navy UAS Obviously, the stunt pulled by Douglas Hughes of Ruskin, Florida >[...]

Airborne 04.16.15: Record-Setting AEA15, 9000 RVs!!!, ULA's 'Vulcan'

Also: DJI Phantom 3, API Update, Skyhawks In China, Air Methods Fined, Naming Pluto Features, Era Group Sale The 58th annual Aviation Electronics Association International Conventi>[...]

Airborne 04.17.15: DC Gyroplane Fallout, ICAS Airshow Update, Message To Space

Also: Blue Origin, Flying Cucumber?, BBJ Combi, NetJets Partners w/Ohio State, ExIm Helo Deal, Long-Range Navy UAS Obviously, the stunt pulled by Douglas Hughes of Ruskin, Florida >[...]

ANN's Daily Aero-Linx (04.18.15)

Seaplane Pilots Association The public section of the website for the Seaplane Pilots Association makes available hundreds of articles and discussions about seaplane Training, Advo>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC