Boeing Begins Certification Testing On 747-8 Performance Improvements | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne 12.11.17

Airborne-Unmanned 12.12.17

Airborne 12.13.17

AMA Drone Report 12.14.17

Airborne 12.08.17

Airborne-YouTube

Airborne 12.11.17

Airborne-Unmanned 12.12.17

Airborne 12.13.17

AMA Drone Report 12.14.17

Airborne 12.08.17

Thu, May 23, 2013

Boeing Begins Certification Testing On 747-8 Performance Improvements

Company Says Performance Package Improves Fuel Burn By Another 1.8 Percent

A Boeing 747-8 Intercontinental successfully completed its first test flight this week with a package of performance improvements including enhanced GE engines. This package is designed to improve the fuel efficiency of the jetliner. With Boeing Flight Test and Evaluation Capt. Kirk Vining and Chief Pilot Capt. Mark Feuerstein at the controls, the airplane took off from Paine Field in Everett, Wash. at 1330 PDT time and landed at Boeing Field in Seattle approximately four hours later.

"It was a great flight and the engines performed as expected," said Capt. Vining. "This is an important milestone for the flight test program."

The airplane Performance Improvement Package (PIP) includes improvements to the GEnx-2B engines and Flight Management Computer (FMC) software.

Boeing's continuous efforts to improve the 747-8 family have resulted in an accumulated 1.5 percent gain in fuel efficiency since the first airplane was delivered less than two years ago. These new improvements will give operators an airplane that is an additional 1.8 percent more efficient.

"These improvements are a part of our commitment to continually improve our great airplanes for our customers," said Eric Lindblad, vice president and general manager of the 747 program. "Improving fuel efficiency by another 1.8 percent saves the airlines approximately one million dollars per year in fuel per airplane and reduces the carbon footprint."

The test program will also validate the design changes and demonstrate the operation of the horizontal tank fuel system on the passenger version of the 747-8, which was deferred from the initial deliveries. The new configuration will first deliver in early 2014 and be available for retrofit. Entry into service of the new engines and FMC software will take place in late 2013.

(747-8 image from file)

FMI: www.boeing.com

Advertisement

More News

Airborne 12.11.17: Pilatus PC-24 Cert, VerdeGo Aero, Canada Nixes Hornets

Also: Engine Coatings Facility, Wrong Runway At JFK, ATR 72-600 Flight Sim, Regional Airline Association Pilatus has obtained type certificates from the FAA and EASA for the first >[...]

Airborne 12.13.17: Flight Design Update, Bell 525, Space Policy Directive

Also: A380 Production Cut?, Canadian Arctic Aviation Tour, US Nationals, Muilenburg'ss Mars Prediction Flight Design may be under new ownership, but it plans to continue to be a le>[...]

Airborne 12.13.17: Flight Design Update, Bell 525, Space Policy Directive

Also: A380 Production Cut?, Canadian Arctic Aviation Tour, US Nationals, Muilenburg'ss Mars Prediction Flight Design may be under new ownership, but it plans to continue to be a le>[...]

Dassault Ends Falcon 5X Program

Cites Issues With Delivery Of Engines, Will Start Development Of A New Aircraft Dassault Aviation has initiated the termination process of the Silvercrest contract leading to the e>[...]

Aero-News: Quote of the Day (12.14.17)

“We appreciate the FAA making an effort to clarify the responsibilities and available options in preserving airport access, improving fee transparency, and ensuring public-us>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC