Boeing Begins Certification Testing On 747-8 Performance Improvements | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 04.23.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 04.23.14 **
** Airborne 04.21.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 04.21.14 **
** Airborne 04.18.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 04.18.14 **

Thu, May 23, 2013

Boeing Begins Certification Testing On 747-8 Performance Improvements

Company Says Performance Package Improves Fuel Burn By Another 1.8 Percent

A Boeing 747-8 Intercontinental successfully completed its first test flight this week with a package of performance improvements including enhanced GE engines. This package is designed to improve the fuel efficiency of the jetliner. With Boeing Flight Test and Evaluation Capt. Kirk Vining and Chief Pilot Capt. Mark Feuerstein at the controls, the airplane took off from Paine Field in Everett, Wash. at 1330 PDT time and landed at Boeing Field in Seattle approximately four hours later.

"It was a great flight and the engines performed as expected," said Capt. Vining. "This is an important milestone for the flight test program."

The airplane Performance Improvement Package (PIP) includes improvements to the GEnx-2B engines and Flight Management Computer (FMC) software.

Boeing's continuous efforts to improve the 747-8 family have resulted in an accumulated 1.5 percent gain in fuel efficiency since the first airplane was delivered less than two years ago. These new improvements will give operators an airplane that is an additional 1.8 percent more efficient.

"These improvements are a part of our commitment to continually improve our great airplanes for our customers," said Eric Lindblad, vice president and general manager of the 747 program. "Improving fuel efficiency by another 1.8 percent saves the airlines approximately one million dollars per year in fuel per airplane and reduces the carbon footprint."

The test program will also validate the design changes and demonstrate the operation of the horizontal tank fuel system on the passenger version of the 747-8, which was deferred from the initial deliveries. The new configuration will first deliver in early 2014 and be available for retrofit. Entry into service of the new engines and FMC software will take place in late 2013.

(747-8 image from file)

FMI: www.boeing.com

Advertisement

More News

Classic Aero-TV: Aero-Statesman Phil Boyer – Representing The Aviation Community

Retired AOPA President Still Understands What An Association Must Do To Serve An Embattled Industry Originally WebCast October 18, 2012: Its been nearly four years since Phil Boyer>[...]

AD: Ballonbau Wörner GmbH Balloons

AD NUMBER: 2014-07-10 PRODUCT: Ballonbau Wörner GmbH Models NL-280/STU, NL-380/STU, NL-510/STU, NL-640/STU, NL-840/STU, and NL-1000/STU balloons.>[...]

Airshow Pilot Bails Out After Catastrophic Aircraft Failure

Planning Ahead And Staying Safe Saves A Professional Airshow Pilot Dan Marcotte describes himself on his website as being determined and driven with a sense of vision. His adventur>[...]

ANN FAQ: Share Aero-News With Your Friends

Send Them A Story -- We Don't Mind! Do you need another set of eyes to see that story you can't believe Jim just wrote? Want to spread Hognose's unique wisdom and perspective to th>[...]

AD: Centrair Gliders

AD NUMBER: 2014-07-08 PRODUCT: Centrair Model 101, 101A, 101AP, and 101P gliders.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC