Thrush 510P Earns 10,500 lbs. Gross Weight Certification | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Feb 24, 2017

Thrush 510P Earns 10,500 lbs. Gross Weight Certification

Certification Applies To All New Thrush Aircraft

With the stroke of a pen on an official document, the FAA has certified that the Thrush 510P now joins its sibling, the Thrush 510G, as being fully compliant with the most modern certification standards – and able to officially fly at its fully operational gross weight of 10,500 lbs.

This certification marks the culmination of more than eight years of hard work from the engineering team at Thrush – which was given the mission of ensuring every new 500-gallon aircraft built by the Albany, Georgia manufacturer is fully certified to today’s most modern regulatory standards, and able to operate legally at their full weight capacity. Mission accomplished.

In addition, Thrush will offer kits to current Thrush 510P operators that will allow their aircraft to be in compliance with the new certification standard as well.
The kits will be available through the Thrush dealer and factory Service Center network – and are estimated to require roughly 24 man-hours to install.

The new certification covers Thrush 510P serial number T34-273 forward, which includes virtually every PT6A-34AG powered aircraft built since the new Thrush began manufacturing in 2003. Today, 510P serial number T34-455 is rolling off the assembly line, so roughly one hundred and eighty 510P’s already in the field will be eligible for the kit and its accompanying gross weight increase.

“Thrush Aircraft has and will always put pilot safety first – and ensuring all of our aircraft are certified to the very latest standards and can safely work day in and day out at their full operational weight is a key element in doing just that,” said Payne Hughes, president of Thrush Aircraft.

“We made a significant investment in putting our designs through the rigors of FAA performance and structural testing because our customers count on our airplanes to be fully capable of bringing them home safe and sound each night. It’s a responsibility all of us here take very seriously – and loose guidelines and overload factors published more than 40 years ago don’t instill the level of confidence we think customers deserve. Which is why we want to ensure our airplanes are always built to the highest standards possible.”

“What we now have – in both the Thrush 510P and the Thrush 510G are airplanes you can load to their maximum – and have full confidence when you do. All day. Every day. You simply shouldn’t settle for anything less” he concluded.

(Image provided with Thrush Aircraft news release)

FMI: www.thrushaircraft.com

Advertisement

More News

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC