Lockheed Out Of Running For JCA Contract | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Aug 03, 2006

Lockheed Out Of Running For JCA Contract

C-130J Variant Dismissed Due To Cert Questions

The Lockheed Martin Corporation is officially out of the running for a $5 billion contract to provide more than 100 small cargo aircraft to the Army and Air Force.

As Aero-News reported, Lockheed had offered a version of its C-130J Hercules aircraft as a surprise, last-minute entry in the bid for the Joint Cargo Aircraft contract. The company has already spent $1 billion of its own funds developing the aircraft.

The Washington Post reports a letter from the Army contracting office to Lockheed stated that the company's submission did not meet the competition's standards, including a requirement that the aircraft be certified by the FAA, which the C-130J is not.

Lockheed spokesman Jeff Adams says his company disagrees with the decision, and that the C-130J is based on another FAA-certified aircraft already in use by the Air Force, several other services and some foreign countries.

"We believe the C-130J is the best value solution for the Army and is the only aircraft which meets the stringent operational requirements of both the Army and the Air Force," Adams said. He added that Lockheed is currently mulling over whether to file a protest, after it is briefed on the Army's ruling.

Lockheed had also been plagued by rising costs and questions about performance of the aircraft... in fact, the Pentagon proposed canceling the C-130J program last year, but later decided it was too expensive to terminate.

With Lockheed out of the competition, that leaves L-3 Communications Holdings Incorporated and Raytheon in a fight to build the planes.

The Army wants the new planes to replace the C-23 Sherpa, C-12 and other small cargo aircraft used by the Army to deliver small amounts of cargo to military hot spots with unpaved or rough airstrips. The Air Force plans to use some of the new planes as well.

FMI: www.c-27j.com, www.us-c295.com/military_transport.html, www.lockheedmartin.com

Advertisement

More News

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC