AD: Gulfstream | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date






Airborne On ANN

Airborne 11.23.15

Airborne 11.24.15

Airborne 11.25.15

Airborne 11.19.15

Airborne 11.20.15

Airborne Hi-Def On YouTube

Airborne 11.23.15

Airborne 11.24.15

Airborne 11.25.15

Airborne 11.19.15

Airborne 11.20.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Fri, May 26, 2006

AD: Gulfstream

AD NUMBER: 2006-11-03
SUBJECT: Airworthiness Directive 2006-11-03
The FAA is adopting a new airworthiness directive (AD) for all Gulfstream Model GV and certain Model GV-SP series airplanes. This AD requires a one-time inspection of the left and right aileron and elevator actuators to determine the part and serial numbers of each actuator, repetitive inspections of suspect actuators to detect broken damper shafts, and replacement of any actuator having a broken damper shaft. This AD also requires that operators report any broken damper shaft they find to the FAA. This AD also requires a terminating action for the repetitive inspections. This AD results from reports of broken or cracked damper shafts within the aileron and elevator actuator assemblies. We are issuing this AD to prevent broken damper shafts, which could result in locking of an aileron or elevator actuator (hard-over condition), which would activate the hard-over protection system (HOPS), resulting in increased pilot workload and consequent reduced controllability of the airplane.



More News

Airborne 11.25.15: Blue Origin Reusable Rocket!, AMA Reacts, Transgender Pilots

Also: UK CAA, E-Fest 2015, Citizens In Space, Gulfstream G500, Dassault Falcon Jet, CFM LEAP-1A, Tuskegee's Milton Crenchaw ANN Airborne Link: /index.cfm?do=video.playVideo&vid>[...]

Klyde Morris (11.20.15)

Klyde Is SO Ready For An Upgrade... FMI:>[...]

FlightSafety International Further Enhances Gulfstream G650 Training

Simulator Upgrades Include Autobrake Systems For Initial And Recurrent Training FlightSafety continues to enhance its Gulfstream G650 training program with upgrades to the simulato>[...]

Spirit Begins Production Of First Production RAAF P-8A

Aircraft Scheduled For Delivery In Early 2016 Spirit AeroSystems Inc. has begun production of the Royal Australian Air Force's (RAAF) first production P-8A aircraft. Spirit started>[...]

Aero-News: Quote Of The Day (11.30.15)

"ICARUS is going to revolutionize how we approach pilot training. It provides experience to student pilots that we cannot provide right now outside of a simulator. This product wil>[...]

blog comments powered by Disqus





© 2007 - 2015 Web Development & Design by Pauli Systems, LC