AD: Gulfstream | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 02.08.16

Airborne 02.09.16

Airborne 02.10.16

Airborne 02.11.16

Airborne 02.12.16

Airborne Hi-Def On YouTube

Airborne 02.08.16

Airborne 02.09.16

Airborne 02.10.16

Airborne 02.11.16

Airborne 02.12.16

Fri, May 26, 2006

AD: Gulfstream

AD NUMBER: 2006-11-03
MANUFACTURER: Gulfstream
SUBJECT: Airworthiness Directive 2006-11-03
SUMMARY:
The FAA is adopting a new airworthiness directive (AD) for all Gulfstream Model GV and certain Model GV-SP series airplanes. This AD requires a one-time inspection of the left and right aileron and elevator actuators to determine the part and serial numbers of each actuator, repetitive inspections of suspect actuators to detect broken damper shafts, and replacement of any actuator having a broken damper shaft. This AD also requires that operators report any broken damper shaft they find to the FAA. This AD also requires a terminating action for the repetitive inspections. This AD results from reports of broken or cracked damper shafts within the aileron and elevator actuator assemblies. We are issuing this AD to prevent broken damper shafts, which could result in locking of an aileron or elevator actuator (hard-over condition), which would activate the hard-over protection system (HOPS), resulting in increased pilot workload and consequent reduced controllability of the airplane.

FMI: www.faa.gov/regulations_policies/airworthiness_directives/

Advertisement

More News

House Science Committee Approves Aviation R&D Bill

Authorizes Funding For The FAA's Research, Engineering, And Development Account Through 2019 The Science, Space, and Technology Committee on Thursday approved the FAA Leadership in>[...]

Airborne 02.12.16: NEW Mooney!, Not-So-Good GAMA Stats, DA40 Upgrades

Also: A350-1000 Final Assembly, Barnstorming: ATC Privatization, Lithium Issue, Boeing Cuts, Tillamook C-27, Sywell Aerodrome, Massive Airship Mooney International Corporation unve>[...]

Airborne 02.11.16: Drone #s Increase, Fokker D. VIII Replica, Gulfstream G500

Also: Albania Auction, Aero-Community: AEA!, 500 F-35 Hours, SeaPort Airlines, Maxcraft Avionics, Air Power Museum, Webb Space Telescope FAA Administrator Michael Huerta told a UAV>[...]

Airborne 02.12.16: NEW Mooney!, Not-So-Good GAMA Stats, DA40 Upgrades

Also: A350-1000 Final Assembly, Barnstorming: ATC Privatization, Lithium Issue, Boeing Cuts, Tillamook C-27, Sywell Aerodrome, Massive Airship Mooney International Corporation unve>[...]

ANN FAQ: View Aero-News YOUR Way ... The 'Headlines And Teasers' Option

Choose How YOU Want To View Your Aero News: Headlines And Teasers We're all pretty excited about the new website design here at ANN, but we HAVE heard from some of you that you lik>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC