City Council Accepts Lindbergh Field Makeover Plan | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.09.24

Airborne-Unlimited-04.10.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Mar 12, 2009

City Council Accepts Lindbergh Field Makeover Plan

Proposed Overhaul Includes New Terminal, Transit Center

A change is gonna come to San Diego International/Lindbergh Field (SAN); at least, that appears likely after the city council accepted a report this week calling for a total makeover of the busy airport.

The San Diego Union Tribune reports councilors voted their approval Monday to the plan, submitted by a panel of local officials led by San Diego Mayor Jerry Sanders. The plan -- approved 6-2 -- calls for the construction of a new passenger terminal, parking garages and a multimodal transit center connecting the airfield to the city center.

The new terminal would be constructed at the north end of the field -- near Interstate 5 -- with an underground train eventually ferrying passengers to existing gates at the south end. Until that subway is completed, buses would shuttle passengers between the two points.

Councilors who expressed misgivings about earlier expansion plans -- which called for a new multilevel parking garage near Terminal 2 -- hope the new arrangement will prevent that structure from being 'shoehorned' onto a plot of land near Harbor Drive.

"It would be a waste of money," said City Councilman Carl DeMaio of the proposed structure. Others say the garage would add to existing traffic problems on an already-clogged arterial road. Officials have not yet ruled on whether that structure will be built.

Sanders' panel was formed last year to find a compromise between the city and the San Diego County Regional Airport Authority, on how to best expand Lindbergh Field. The single-runway airport is expected to reach capacity by 2025.

An entirely new airport would be ideal, but San Diego has few options in that regard. Voters rejected in 2006 a plan to add commercial facilities to Marine Corps Air Station Miramar, after military officials made it clear they still had plans for that facility.

The Lindbergh plan next goes to the airport authority for consideration. If approved, work will begin on the expected 20-year expansion plan, which is projected to cost between $5 billion and $11 billion.

FMI: www.san.org/

Advertisement

More News

ANN's Daily Aero-Linx (04.13.24)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (04.13.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC