2nd Ariane 5 To Be Launched This Year Enters Assembly Process | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Mar 11, 2010

2nd Ariane 5 To Be Launched This Year Enters Assembly Process

Ariane Plans A Total Of Seven Mission In 2010

The Ariane 5 for Arianespace's second dual-payload flight of 2010 has begun its assembly as the Spaceport in French Guiana is once again the center of activity for two parallel missions.

This latest Ariane 5 began taking shape earlier in the week as its cryogenic core stage was positioned over a mobile launch table in the Spaceport's Launcher Integration Building. It was then joined by the vehicle's two solid boosters for mating.

The second mission of 2010 will utilize a heavy-lift Ariane 5 ECA version of Arianespace's workhorse launcher, and will carry two telecommunications satellites.

As the launch campaign begins for this flight, another Ariane 5 ECA is in the Spaceport's Final Assembly Building, where it is awaiting the integration of its two satellite passengers: ASTRA 3B & COMSATBw-2. The liftoff of this year-opening Arianespace launch is set for March 24.

Arianespace is targeting a total of seven Ariane 5 missions during 2010 while preparations also continue for the upcoming introductions of the medium-lift Soyuz and lightweight Vega launcher in side-by-side operations at the Spaceport.

FMI: www.arianespace.com

Advertisement

More News

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

ANN's Daily Aero-Linx (04.14.24)

Aero Linx: Soaring Safety Foundation (SSF) The Soaring Safety Foundation (SSF) is the Training and Safety arm of the Soaring Society of America (SSA). Our mission is to provide ins>[...]

Classic Aero-TV: 'We're Surviving'-- Kyle Franklin Describes Airshow Life 2013

From 2013 (YouTube Version): Dracula Lives On Through Kyle Franklin... and We're NOT Scared! ANN CEO and Editor-in-Chief, Jim Campbell speaks with Aerobatic and airshow master, Kyl>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC