Boeing Selected To Build Ares I Upper Stage | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne 04.23.18

Airborne-UnManned 04.24.18

Airborne 04.25.18

AMA Drone Report 04.26.18

Airborne 04.20.18

Airborne-YouTube

Airborne 04.23.18

Airborne-UnManned 04.24.18

Airborne 04.25.18

AMA Drone Report 04.26.18

Airborne 04.20.18

Wed, Aug 29, 2007

Boeing Selected To Build Ares I Upper Stage

Contract Authorizes Production Of Boosters Thru 2016

NASA on Tuesday selected Boeing's facility in Huntsville, AL as the contractor to provide manufacturing support for design and construction of the upper stage of the Ares I rocket. Ares I will launch astronauts to the International Space Station and eventually help return humans to the moon.

Boeing will provide support to a NASA-led design team during the design phase and will be responsible for production of the Ares I upper stage.

Boeing will manufacture a ground test article, three flight test units and six production flight units to support NASA's flight manifest through 2016. Final assembly of the upper stage will take place at NASA's Michoud Assembly Facility in New Orleans.

The contract type is cost-plus-award-fee and the period of performance is September 1, 2007, through December 31, 2016. The estimated contract value for design team support and the manufacture of the test units and six production flight units is $514.7 million. The selection resulted from a full and open competition.

"Boeing will apply its best practices in program management and Lean manufacturing principles from across the company to ensure that we produce the safest, lowest-cost and most reliable upper stage for NASA," said Roger A. Krone, president of Network and Space Systems, Boeing Integrated Defense Systems. "The Boeing team has an experienced and highly skilled workforce that is ready to get started on this exciting new mission for our customer and our nation."

Ares I is an in-line, two-stage rocket that will carry to low Earth orbit the crew exploration vehicle Orion, which will succeed the space shuttle as NASA's primary vehicle for human exploration in the next decade. The Ares I upper stage, with an engine and an avionics unit procured separately, will provide the navigation, guidance, control and propulsion required for the second stage of the rocket's ascent.

The Ares I first stage will consist of a five-segment solid rocket booster and motor similar to those used on the space shuttle. The second, or upper, stage will consist of a J-2X main engine, a fuel tank for liquid oxygen and liquid hydrogen propellants, and associated avionics.

The Ares I upper stage development is managed by NASA's Marshall Space Flight Center in Huntsville, Ala., for NASA's Constellation Program.

FMI: www.nasa.gov/constellation, www.boeing.com

Advertisement

More News

ANNouncement: Now Accepting Applications For Oshkosh 2018 Stringers!!!

An Amazing Experience Awaits The Chosen Few... E-I-C Note: There's very little we can say yet, but there is a reason why this may be THE year to throw in with ANN to cover the extr>[...]

AMA Drone Report 04.19.18: AMA Leadership, FAA Reauthorization, Coachella

Also: New French Regs, Drone Boot Camp, Public Safety Drone Standards, DroneShield Protects NASCAR It’s a little bit sad and yet a bit cool to see AMA make an exciting change>[...]

Airborne/Barnstorming 04.23.18: We Can Do So Much Better...

I'll Admit It... We're A Mite Frustrated, But We're ALSO Not Quitting... Ever Comments/Analysis/News/Video by ANN CEO/Editor-In-Chief, Jim Campbell We've accomplished so much over >[...]

Airborne-Unmanned 04.24.18: XPO 2018, Apple v Drones, Mosquito-Packed Drones

Also: Osage Nations Repurposes Airpark, UAV/Drone Certification, Leonardo's M-40 Target Drone, GA-ASI Flight Deck Taxi Only a few more days to go... THE major unmanned exposition o>[...]

Airborne 04.23.18: Hemisphere Suspended, Thunderbirds Fly, Apple v Drones

Also: New NASA Administrator, AD For CFM56-7B, Engine Display Upgrade On C-441, First BBJ MAX Textron Aviation has suspended work on the Citation Hemisphere large business jet, cit>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2018 Web Development & Design by Pauli Systems, LC