AD: Airbus SAS Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Sep 17, 2019

AD: Airbus SAS Airplanes

AD NUMBER: 2019-17-04

PRODUCT: Certain Airbus SAS Model A350-941 airplanes.

ACTION: Final rule; request for comments.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2019-06-09, which applied to the aircraft listed above.

AD 2019-06-09 required repetitive tightness checks of the baby bassinet inserts installed on stowages and partitions and, depending on findings, accomplishment of applicable corrective actions, as specified in an EASA AD, which was incorporated by reference.

This new AD continues to require repetitive tightness checks of the baby bassinet inserts installed on stowages and partitions and, depending on findings, accomplishment of applicable corrective actions, and also requires modification of the baby bassinet inserts, which constitutes terminating action for the repetitive tightness checks; as specified in an EASA AD, which is incorporated by reference.

This AD was prompted by reports that baby bassinet inserts installed on airplane stowages and partitions were found loose because a self-securing fixation device (Loctite) had not been applied.

DATES: This AD becomes effective September 27, 2019. Comments must be received by October 28, 2019.

COST: The FAA estimates that this AD affects no affected U.S.-registered airplanes. If an affected airplane is imported and
placed on the U.S. Register in the future, operators may incur the following costs in order to comply with this AD:

Required Actions:

  • Retained actions from AD 2019-06-09: 1 work-hours × $85 per hour = $85.
  • New actions: Up to 3 work-hours × $85 per hour = Up to $255.

On Condition Costs:

  • Labor: 1 work-hour × $85 per hour = $85.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC