Fourth Hawker Horizon Joins Certification Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne-Unmanned w/AUVSI

Airborne On ANN

AMA 04.20.17

Airborne
04.24.17

Airborne
04.25.17

Airborne
04.19.17

Airborne
04.20.17

Airborne
04.21.17

Airborne-Unmanned 04.18.17

Airborne-YouTube

AMA 04.20.17

Airborne
04.24.17

Airborne
04.25.17

Airborne
04.19.17

Airborne
04.20.17

Airborne
04.21.17

Airborne-Unmanned 04.18.17

Mon, May 03, 2004

Fourth Hawker Horizon Joins Certification Program

RC4 Flies In Final Production Configuration

Raytheon Aircraft’s fourth Hawker Horizon entered the certification test program yesterday with its first flight. Hawker Horizon RC-4 lifted off from Beech Field at 11:53 a.m. CDT and flew for 90 minutes.  Senior test pilot Tim Miller, co-pilot Ken Sasine and flight test engineer Amin Gulamhussein conducted a series of functional tests with speeds ranging from 135 to 340 knots at 15,000 feet. 

"This aircraft represents the final production configuration, and we were very pleased with the results of the first flight," said David Riemer, Vice President – Product Development and Engineering. 

The fourth Hawker Horizon will conduct FAA Function and Reliability testing as part of the certification effort.  In addition, it will participate in an operational evaluation that will ensure a successful entry into service and full customer satisfaction prior to initial deliveries. Certification and deliveries are expected by the end of this year.

For its first flight, RC-4’s cabin was fitted with interior components, including sidewalls, headliners and lav and cabin doors. "The Horizon’s composite fuselage allows us to build interior components that can be installed in the airplane with virtually no trim-to-fit changes required," said Brad Hatt, President/General Manager of the Hawker Division.  "This reduces the amount of time required to install, provides great component interchangeability, and enhances the overall interior." Each Hawker Horizon interior will be installed at the company’s Little Rock facility, where Hawker 800XPs are now completed.

The Hawker Horizon offers an outstanding combination of range, speed and cabin size. An NBAA IFR range of 3,100 nm with six passengers is guaranteed, assuring the ability to cross the U.S. non-stop against almost any wind. A maximum range of more than 3,400 nm provides trans-Atlantic capability and additional performance flexibility.

The Horizon fuselage is made with the advanced composite technology.  Built in three sections, the Horizon fuselage features a 72-inch stand-up cabin and 77.5-inch width.

A flat floor runs the entire length of the aircraft, leading to a large baggage area. The baggage compartment is accessible on the ground through an exterior door or during flight through the cabin.

The Hawker Horizon will be delivered with a comprehensive customer support package and will be served by Raytheon Aircraft’s global network of company-owned and independent service centers.

FMI: www.raytheonaircraft.com

Advertisement

More News

AMA Drone Report 04.20.17: Phantom 4 Advanced, NJ NIMBYism, AMA-DJI Team Up

Also: AUVSI XPO17 LIVE!, Steady Drone Sales, Drone v Shotgun... DJI’s new Phantom 4 Advanced offers a more powerful camera and more upgraded controls. The new upgrades the or>[...]

Airborne-Unmanned 04.18.17: Drones v Volcanoes!, Boston Marathon UAVs, XPO-LIVE!

Also: State Pavilions at XPONENTIAL, MQ-8C Fire Scout, Puma UAS, Drone Bust Drones DO wind up in some of the most amazing places... As evidence by the Universities of Bristol and C>[...]

Airborne 04.21.17: Gulfstream G280, Airport $$ Abuse, Boeing Jobs

Also: Drone Power, Jerkwater Drone Regs, CBP, Wichita UAS Mtg, Cessna Accident, Co-Pilot SNAFU, Atlas Air-Polar Air Gulfstream’s super mid-size G280 recently completed two mi>[...]

RFP: ANN Considering Future Options For HQ Relocation

Some Aggressive Upgrades For ANN, Aero-TV, and Airborne May Require New Digs It's been in development for years, but we're getting to a point where we think we can pull off somethi>[...]

Aero-News: Quote of the Day (04.24.17)

"We understand that the hearing will be 8 days before the Planes of Fame Air Show and we want to assure you that your overwhelming support throughout this situation has strengthene>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC