Work Underway On $16.4 Million Control Tower At Ft. Lauderdale | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-

Airborne-Unmanned w/AUVSI-

Airborne Unlimited-

AMA Drone Report-

Airborne Unlimited-

Airborne On ANN

Airborne 03.12.18

Airborne-UnManned 03.13.18

Airborne 03.14.18

AMA Drone Report 03.15.18

Airborne 03.16.18


Airborne 03.12.18

Airborne-UnManned 03.13.18

Airborne 03.14.18

AMA Drone Report 03.15.18

Airborne 03.16.18


Sat, Jan 21, 2012

Work Underway On $16.4 Million Control Tower At Ft. Lauderdale

Groundbreaking At Executive Airport Attended By Ray LaHood, Michael Huerta

The FAA today broke ground Wednesday for a new $16.4 million, state-of-the-art airport traffic control tower at Fort Lauderdale Executive Airport. The new tower, equipped with the latest radar, communications and weather technology, will enable air traffic controllers to continue to provide the safest, most efficient service to flights at the busy South Florida airport.

(L-R) LaHood, Huerta

“Rebuilding and expanding our nation’s aviation infrastructure creates jobs while making flying safer and more efficient,” U.S. Transportation Secretary Ray LaHood said.  “This new tower will benefit South Florida’s air travelers.”

“The new tower demonstrates the FAA’s commitment to aviation safety and to modernizing the air traffic control system in South Florida,” said FAA Acting Administrator Michael Huerta.  “Investing in new air traffic control facilities is a key component of the FAA’s Next Generation Air Traffic Control system.”

The new facility will include a 117-foot-tall air traffic control tower topped by a 525-square-foot tower cab. A 7,200-square-foot single-story base building will house training rooms, administrative offices, and equipment rooms. Air traffic controllers at Ft. Lauderdale Executive Tower handled 162,000 takeoffs and landings in 2011. The airport primarily serves general aviation traffic.

The construction contract for $9.282 million was awarded to J. Kokolakis Contracting, Inc., of Tarpon Springs, Fla.  Design and installation of equipment accounted for the remainder of the total $16.4 million cost. The new tower will be commissioned in spring 2014, replacing the existing tower that was commissioned in 1970.



More News

Barnstorming: The Long Goodbye (Updated)

Thoughts About A Man Who Made EVERYTHING Possible for Me Grief is the price we pay for love. Queen Elizabeth II A Personal Observation By ANN/E-I-C Jim Campbell A Personal Update-0>[...]

AMA Drone Report 03.15.18: Penguins and Drones, FPV Flying, NASA Armstrong

Also: Drone Suspected In Wildfire, UAV Airspace Integration, Longest UAV Urban Pkg Delivery, Drone Locates Child For the past 40 years, the total number of Adélie Penguins, >[...]

Airborne-Unmanned 03.13.18: FAA Message, Drone Waiver, NASA Armstrong

Also: Drone Suspected In Wildfire, DroneShield, Moore County Sheriff, Camcopter S-100 Contract During the third annual FAA UAS Symposium, cosponsored by AUVSI, FAA officials said r>[...]

Airborne 03.14.18: FAA Bill Update, 'Short' Mars Flts, CA Fuel Shortage?

Also: FAA Revokes AeroBearings’ Cert, Gogo Appoints Thorne, Space Festival, Daher Names Rep For India Another contentious issue potentially blocking passage of a long-term FA>[...]

Airborne 03.16.18: Military UFO Sightings, Air Race Classic, Airshow Struggles

Also: Rostec To Build TVS-2DTS, Army Acquiring More Lakotas, Camden Spaceport Draft EIS, Lost WWII Airman Returns Are THEY out There? Really? Video captured by the crew of an F/A-1>[...]

blog comments powered by Disqus





© 2007 - 2018 Web Development & Design by Pauli Systems, LC