Lockheed Martin F-35 Successfully Wraps Up Testing At Edwards AFB | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.09.24

Airborne-Unlimited-04.10.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Oct 24, 2008

Lockheed Martin F-35 Successfully Wraps Up Testing At Edwards AFB

Trial Validates Readiness For Future Test Deployment

The first Lockheed Martin F-35 Lightning II fighter has finished all planned testing at California's Edwards Air Force Base, demonstrating that the aircraft, the support crews, and contractor and military service personnel are ready for the dramatically expanded flight testing on the program's horizon.

"This initial round of testing at Edwards is just the beginning," said Doug Pearson, Lockheed Martin vice president of the F-35 Integrated Test Force. "The exceptional performance of the aircraft and those supporting it shows that the team is ready for the fast-paced flight test activities upcoming at Edwards and [Naval Air Station] Patuxent River, Maryland."

By the end of 2009, all 19 F-35 test aircraft will be complete and flight test activities will intensify, leading to Initial Operational Test & Evaluation in the 2013-2014 time frame.

During the three-week deployment at Edwards, most of the F-35's activity centered on a set of crucial tests that validated the aircraft's ability to shut down and restart its engine in flight. During the tests -- conducted to ensure that the aircraft can regain power and be flown safely in the event of an unanticipated engine flameout -- the Pratt & Whitney F135 turbofan repeatedly restarted on command.

"Our goal was to collect in-flight data during 12 specific test cases over Edwards, and we did exactly that," Pearson said. "The initial data review and pilot-reported results are very favorable and meet or exceed our expectations."

With all Edwards testing successfully completed, F-35 Test Pilot Jeff Knowles will fly the aircraft back to Lockheed Martin's Fort Worth, TX plant this week.

"In addition to confirming that the engine spools up and restarts very quickly after being shut off in flight, we found that the airplane itself showed high reliability and was always ready for its next mission," Knowles said. "That kind of performance in an early development plane bodes well for the aircraft we deliver to the fleet."

The deployment began on October 1 when Knowles flew the Lightning II nonstop from Fort Worth to Edwards, landing "code one," or without any aircraft discrepancies.

"Our modeling and simulation indicated a robust propulsion system design. With the completion of testing at Edwards I am even more confident we have an excellent design that demonstrates appropriate performance and margin to accommodate unplanned conditions if encountered," Pearson said, adding that support from the US Air Force and the F-35 logistics team were outstanding and "enabled us to meet every scheduled event."

The F-35 involved in the testing is a conventional takeoff and landing variant that has completed 63 flights.

FMI: www.lockheedmartin.com, www.teamjsf.com/

Advertisement

More News

ANN's Daily Aero-Linx (04.13.24)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (04.13.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC