STS-133 Inspections Reveal More Cracking | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Dec 31, 2010

STS-133 Inspections Reveal More Cracking

Additional Data Evaluated, External Tank's New Cracks To Be Repaired

The Space Shuttle Program management team was provided a status update Thursday on the continuing investigation, testing and analysis regarding shuttle Discovery's External Tank stringer crack issue.

Following the rollback of Discovery's STS-133 stack to the Vehicle Assembly Building at NASA's Kennedy Space Center Wednesday, Dec. 22, engineers immediately began the work to continue evaluation of the intertank area of the External Tank. Since the rollback data analysis from a tanking test has continued to be reviewed along with “non-destructive evaluation” (X-rays) of stringers that were not accessible at the launch pad.

The X-rays showed four additional small cracks on three stringers on the opposite side of the tank from Discovery, and managers elected to repair those cracks in a similar fashion to repairs made on cracks discovered after the Nov. 5 launch attempt. That work is estimated to take 2–3 days. Any further work will be evaluated thoroughly early next week after additional data is reviewed. The hardware is in place to perform any modification. That work would be performed inside the VAB.

Managers continue to evaluate an option to perform known and practiced modifications on additional stringers. A decision may be made as early as Monday, Jan. 3.
 
The next available launch date is Thursday, Feb. 3 at the opening of a window that extends through Feb. 10. The current preferred launch time on Feb. 3 is 1:37 a.m. EST.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (04.15.24)

Aero Linx: International Flying Farmers IFF is a not-for-profit organization started in 1944 by farmers who were also private pilots. We have members all across the United States a>[...]

Classic Aero-TV: 'No Other Options' -- The Israeli Air Force's Danny Shapira

From 2017 (YouTube Version): Remembrances Of An Israeli Air Force Test Pilot Early in 2016, ANN contributor Maxine Scheer traveled to Israel, where she had the opportunity to sit d>[...]

Aero-News: Quote of the Day (04.15.24)

"We renegotiated what our debt restructuring is on a lot of our debts, mostly with the family. Those debts are going to be converted into equity..." Source: Excerpts from a short v>[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.16.24): Chart Supplement US

Chart Supplement US A flight information publication designed for use with appropriate IFR or VFR charts which contains data on all airports, seaplane bases, and heliports open to >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC