NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 11.26.14 ** HD iPad-Friendly -- Airborne 11.26.14 **
** Airborne 11.24.14 ** HD iPad-Friendly -- Airborne 11.24.14 **
** Airborne 11.21.14 ** HD iPad-Friendly -- Airborne 11.21.14 **

Sun, Aug 28, 2011

NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8

Five-Segment Solid Rocket Booster Burn Expected To Last About Two Minutes

NASA and Alliant Techsystems (ATK) will conduct a full-scale test of a five-segment, solid rocket motor at the ATK Aerospace Systems test facility in Promontory, Utah, at 1605 EDT, Thursday, Sept. 8. The static firing of the five-segment solid rocket motor, designated Development Motor-3 (DM-3), will last approximately two minutes. DM-3 is the third in a series of development motors and the most heavily instrumented solid rocket motor in NASA history, with a total of 37 test objectives measured through more than 970 instruments.

The DM-3 incorporates several performance-based improvements to the designs of the first two development motors. Additionally, the core of DM-3 will be heated to 90 degrees Fahrenheit for this full-duration firing to verify the motor's performance at high temperatures. This test will continue to advance understanding of five-segment solid rocket motor performance and specifically assess performance at the highest end of the motor's accepted temperature range. Through development testing, the solid rocket motor will be certified to fly at ambient temperatures ranging from 40 to 90 degrees Fahrenheit.

The DM-3 test will follow wind constraint requirements different than past development motors. Two days before the test, ATK's public relations will notify registered media of a go/no-go decision. If no-go, the test will slip to the next day. Notification of a decision to proceed will be made via email, website  and social media (Facebook and Twitter).

The solid rocket motor is managed by NASA's Marshall Space Flight Center in Huntsville, AL. ATK Space Systems is the prime contractor.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (11.26.14)

FAA Aviation Safety Information Analysis And Sharing System (ASIAS) The Federal Aviation Administration (FAA) promotes the open exchange of safety information in order to continuou>[...]

ANN's Daily Aero-Term (11.26.14): Density Altitude

Pressure altitude corrected for nonstandard temperature. Density altitude is used in computing the performance of an aircraft and its engines.>[...]

Aero-News: Quote Of The Day (11.26.14)

“We hope to never see an event like this again, but, we must be prepared." Source: FAA Administrator Michael Huerta, on the release of the agency's 30 report on the fire at t>[...]

ANN FAQ: It's Alive! ANN REALTIME NewsBug Headlines for YOUR Desktop!

It's For Real! ANN REALTIME NewsBug Released To ANN Readers, Worldwide For those of you using a windows PC (MAC version in the works... we promise), a new REALTIME News Service fro>[...]

Helicopters Still Flying Tourists Over Hudson River

But Activists Continue To Call For A Ban On The Flights A group of activists in New York and New Jersey are still working to have sightseeing flights over New York City and the Hud>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC