NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne-Unmanned w/AUVSI

Airborne On ANN

AMA 06.29.17

Airborne 06.26.17

Airborne 06.27.17

Airborne 06.28.17

Airborne 06.29.17

Airborne 06.23.17

Airborne-Unmanned 06.27.17

Airborne-YouTube

AMA 06.22.17

Airborne 06.26.17

Airborne 06.27.17

Airborne 06.28.17

Airborne 06.29.17

Airborne 06.23.17

Airborne-Unmanned 06.27.17

XPONENTIAL Innovation Preview -- www.allthingsunmanned.com

Sun, Aug 28, 2011

NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8

Five-Segment Solid Rocket Booster Burn Expected To Last About Two Minutes

NASA and Alliant Techsystems (ATK) will conduct a full-scale test of a five-segment, solid rocket motor at the ATK Aerospace Systems test facility in Promontory, Utah, at 1605 EDT, Thursday, Sept. 8. The static firing of the five-segment solid rocket motor, designated Development Motor-3 (DM-3), will last approximately two minutes. DM-3 is the third in a series of development motors and the most heavily instrumented solid rocket motor in NASA history, with a total of 37 test objectives measured through more than 970 instruments.

The DM-3 incorporates several performance-based improvements to the designs of the first two development motors. Additionally, the core of DM-3 will be heated to 90 degrees Fahrenheit for this full-duration firing to verify the motor's performance at high temperatures. This test will continue to advance understanding of five-segment solid rocket motor performance and specifically assess performance at the highest end of the motor's accepted temperature range. Through development testing, the solid rocket motor will be certified to fly at ambient temperatures ranging from 40 to 90 degrees Fahrenheit.

The DM-3 test will follow wind constraint requirements different than past development motors. Two days before the test, ATK's public relations will notify registered media of a go/no-go decision. If no-go, the test will slip to the next day. Notification of a decision to proceed will be made via email, website  and social media (Facebook and Twitter).

The solid rocket motor is managed by NASA's Marshall Space Flight Center in Huntsville, AL. ATK Space Systems is the prime contractor.

FMI: www.nasa.gov

Advertisement

More News

ANN's 2017 AirVenture Innovation Preview is Going To Be A Stunner!

Early Confirmations Show An Amazing Assortment of Exciting New Products and Technologies! It may be the most impressive line-up of new technology to ever be featured in our Innovat>[...]

Airborne 06.27.17: SpaceX Doubles!, Sean Tucker Retirement, FA Changes

Also: Shoreham Update, Aero-Calendar, AUVSI, Fighter Pilots, André Borschberg, Airport Crimes, Drone Conference SpaceX, in the midst of a greatly accelerated launch pace, pu>[...]

Airborne-Unmanned 06.27.17: AUVSI On Senate Bill, Intel Olympics, NIGHTWARDEN

Also: DRL Winner $$, Kespry Enters Insurance Sector, Drone Sim Market, Automated Vehicles Symposium Brian Wynne, president and CEO of AUVSI, issued a statement on the unmanned airc>[...]

AMA Drone Report 06.22.17: FAA Reauthorization, Rotor Riot Int'l, DRL on ESPN

Also: Drones at Oshkosh!, Drone Regulatory Effort, AMA Drone Report-Help Wanted, Aero-TV: MultiGP Drone Racing The House of Representatives has published initial language to reauth>[...]

U.S. Rocketry Students Impress At Internationals, Win Gold

Students From Festus, MO Become Third Consecutive U.S. Team To Take Top Spot The 10-student team from Festus High School in Festus, MO bested the world's best rocketry teams and to>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC