NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne-Unmanned w/AUVSI

Airborne On ANN

AMA 03.23.17

Airborne
03.20.17

Airborne
03.21.17

Airborne
03.22.17

Airborne
03.23.17

Airborne 03.24.17

Airborne-Unmanned 03.21.17

Airborne-YouTube

AMA 03.23.17

Airborne
03.20.17

Airborne
03.21.17

Airborne
03.22.17

Airborne
03.23.17

Airborne 03.24.17

Airborne-Unmanned 03.21.17

Sun, Aug 28, 2011

NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8

Five-Segment Solid Rocket Booster Burn Expected To Last About Two Minutes

NASA and Alliant Techsystems (ATK) will conduct a full-scale test of a five-segment, solid rocket motor at the ATK Aerospace Systems test facility in Promontory, Utah, at 1605 EDT, Thursday, Sept. 8. The static firing of the five-segment solid rocket motor, designated Development Motor-3 (DM-3), will last approximately two minutes. DM-3 is the third in a series of development motors and the most heavily instrumented solid rocket motor in NASA history, with a total of 37 test objectives measured through more than 970 instruments.

The DM-3 incorporates several performance-based improvements to the designs of the first two development motors. Additionally, the core of DM-3 will be heated to 90 degrees Fahrenheit for this full-duration firing to verify the motor's performance at high temperatures. This test will continue to advance understanding of five-segment solid rocket motor performance and specifically assess performance at the highest end of the motor's accepted temperature range. Through development testing, the solid rocket motor will be certified to fly at ambient temperatures ranging from 40 to 90 degrees Fahrenheit.

The DM-3 test will follow wind constraint requirements different than past development motors. Two days before the test, ATK's public relations will notify registered media of a go/no-go decision. If no-go, the test will slip to the next day. Notification of a decision to proceed will be made via email, website  and social media (Facebook and Twitter).

The solid rocket motor is managed by NASA's Marshall Space Flight Center in Huntsville, AL. ATK Space Systems is the prime contractor.

FMI: www.nasa.gov

Advertisement

More News

Airborne-Unmanned 03.21.17: Heron 1 FOC, Canadian UAVs BVLOS, Quad Inspects C17

Also: Terra Drone, senseFly partners with MicaSense, Quadcopter Topology Optimization The Heron 1 UAV has attained Full Operational Capability (FOC), allowing two Republic of Singa>[...]

Airborne 03.23.17: Citation Longitude Update, Lawn-Chair Balloonacy, Yuneec

Also: Sea Vixen, FAA-UAS Symposium, Boeing Layoffs, Evada Aircraft, OneWeb, Legacy 450, MS A/C Sale The third aircraft in the Cessna Citation Longitude flight test program recently>[...]

AMA Drone Report 03.23.17: New Canada Drone Regs, 'Anti-Drone' Race, Tiny Whoop

Also: SELFLY Camera-Kickstarter, Turtle Tracking Drones, Drones Save Lives! The Canadian government has recently released new regulations for recreational drone operators that carr>[...]

Airborne 03.22.17: Canada Drone Regs, Fuller On ATC, Harrier For Sale

Also: Affordable ADS-B, Mars Beer, Best Tugs, Collins TXP, CAE 70th, Historic WWII Tour, RARA Design Contest The Canadian government had released new regulations for recreational d>[...]

AMA Drone Report 03.23.17: New Canada Drone Regs, 'Anti-Drone' Race, Tiny Whoop

Also: SELFLY Camera-Kickstarter, Turtle Tracking Drones, Drones Save Lives! The Canadian government has recently released new regulations for recreational drone operators that carr>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC