NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 05.18.15

Airborne 05.19.15

Airborne 05.20.15

Airborne 05.21.15

Airborne 05.22.15

Airborne Hi-Def On YouTube

Airborne 05.18.15

Airborne 05.19.15

Airborne 05.20.15

Airborne 05.21.15

Airborne 05.22.15

 

Sun, Aug 28, 2011

NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8

Five-Segment Solid Rocket Booster Burn Expected To Last About Two Minutes

NASA and Alliant Techsystems (ATK) will conduct a full-scale test of a five-segment, solid rocket motor at the ATK Aerospace Systems test facility in Promontory, Utah, at 1605 EDT, Thursday, Sept. 8. The static firing of the five-segment solid rocket motor, designated Development Motor-3 (DM-3), will last approximately two minutes. DM-3 is the third in a series of development motors and the most heavily instrumented solid rocket motor in NASA history, with a total of 37 test objectives measured through more than 970 instruments.

The DM-3 incorporates several performance-based improvements to the designs of the first two development motors. Additionally, the core of DM-3 will be heated to 90 degrees Fahrenheit for this full-duration firing to verify the motor's performance at high temperatures. This test will continue to advance understanding of five-segment solid rocket motor performance and specifically assess performance at the highest end of the motor's accepted temperature range. Through development testing, the solid rocket motor will be certified to fly at ambient temperatures ranging from 40 to 90 degrees Fahrenheit.

The DM-3 test will follow wind constraint requirements different than past development motors. Two days before the test, ATK's public relations will notify registered media of a go/no-go decision. If no-go, the test will slip to the next day. Notification of a decision to proceed will be made via email, website  and social media (Facebook and Twitter).

The solid rocket motor is managed by NASA's Marshall Space Flight Center in Huntsville, AL. ATK Space Systems is the prime contractor.

FMI: www.nasa.gov

Advertisement

More News

ANN Special Report: Colorado NIMBYs Defeated... For Now

Vicious Campaign Against Skydiving Operation By Small, But Vocal, Group Loses Court Case News/Analysis by ANN CEO/Editor-In-Chief, Jim Campbell Those of us who work and play in the>[...]

Airborne 05.22.15: Falcon 5X Readies, Avidyne AD, LadiesLoveTaildraggers 2015

Also: Air Power Museum, ANN Could Use A Little Help From Its Friends, GE Honda, Mexican-Registry TBM 900, Legacy 500, BBJ Winglets, Wheels Up Order The new Falcon 5X is getting clo>[...]

Deadline For $30 Million Google Lunar XPRIZE Extended To End Of 2017

Progress Continues To Be Made To Return Humanity To The Moon XPRIZE and Google have officially confirmed a further extension of the $30 million Google Lunar XPRIZE. XPRIZE notes th>[...]

Aero-News: Quote Of The Day (05.25.15)

“It is the Sikorsky Innovations charter to identify the toughest challenges in vertical flight, and to demonstrate solutions to them. Getting an all-new aircraft into flight,>[...]

S-97 Raider Starts Flight Test Program

CoAxial Helo Heralds Development Of Exciting New Rotorcraft We knew it was close... and now it's real. Sikorsky has confirmed the successful first flight of the S-97 RAIDER helicop>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC