NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 06.29.15

Airborne 06.30.15

Airborne 07.01.15

Airborne 07.02.15

Airborne 07.03.15

Airborne Hi-Def On YouTube

Airborne 06.29.15

Airborne 06.30.15

Airborne 07.01.15

Airborne 07.02.15

Airborne 07.03.15

 

Sun, Aug 28, 2011

NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8

Five-Segment Solid Rocket Booster Burn Expected To Last About Two Minutes

NASA and Alliant Techsystems (ATK) will conduct a full-scale test of a five-segment, solid rocket motor at the ATK Aerospace Systems test facility in Promontory, Utah, at 1605 EDT, Thursday, Sept. 8. The static firing of the five-segment solid rocket motor, designated Development Motor-3 (DM-3), will last approximately two minutes. DM-3 is the third in a series of development motors and the most heavily instrumented solid rocket motor in NASA history, with a total of 37 test objectives measured through more than 970 instruments.

The DM-3 incorporates several performance-based improvements to the designs of the first two development motors. Additionally, the core of DM-3 will be heated to 90 degrees Fahrenheit for this full-duration firing to verify the motor's performance at high temperatures. This test will continue to advance understanding of five-segment solid rocket motor performance and specifically assess performance at the highest end of the motor's accepted temperature range. Through development testing, the solid rocket motor will be certified to fly at ambient temperatures ranging from 40 to 90 degrees Fahrenheit.

The DM-3 test will follow wind constraint requirements different than past development motors. Two days before the test, ATK's public relations will notify registered media of a go/no-go decision. If no-go, the test will slip to the next day. Notification of a decision to proceed will be made via email, website  and social media (Facebook and Twitter).

The solid rocket motor is managed by NASA's Marshall Space Flight Center in Huntsville, AL. ATK Space Systems is the prime contractor.

FMI: www.nasa.gov

Advertisement

More News

Aero-News: Quote Of The Day (07.06.15)

“Lisa’s contagious passion for reaching the dream of building or restoring an aircraft rubs off on everyone around her... The excitement is easy to enjoy, and has prope>[...]

Aero-TV: An Intro To Quad-Copters – Horizon Hobby Explains A Model Revolution

The Quadcopter Revolution Is In Full Swing... Here's Info On How To Join In! While at eFest 2015, ANN CEO and Editor-In-Chief, Jim Campbell, talks with a company known as Horizon H>[...]

Klyde Morris (07.06.15)

Excuse The Pun... But Klyde Is Clearly Having A Blast -- Pilot Style FMI: www.klydemorris.com>[...]

Airborne 07.03.15: New Trig Avionics, Cargo Biz Grows, iOS GPS Fix

Also: 'No Drone Zone', Aviation v Media, Women's Air Race Classic, Houston Spaceport, Navy's New A/C Launch System, GA Fly Safe, FAA InFO Trig Avionics tells us they are unveiling >[...]

AeroSports Update: Sporty’s Catalog Just Got Bigger

Legend Cub and Sporty's Pilot Shop Partner on Sales and Sweepstakes The American Legend Aircraft Company has announced a twofold partnership with Sporty's Pilot Shop. First, Sporty>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC