NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne-Unmanned w/AUVSI

Airborne On ANN

AMA 10.12.17

Airborne 10.16.17

Airborne 10.17.17

Airborne 10.11.17

Airborne 10.12.17

Airborne 10.13.17

Airborne-Unmanned 10.10.17

Airborne-YouTube

AMA 10.12.17

Airborne 10.16.17

Airborne 10.17.17

Airborne 10.11.17

Airborne 10.12.17

Airborne 10.13.17

Airborne-Unmanned 10.10.17

NEW!!! 2017 AirVenture Innovation Preview -- YouTube Presentation / Vimeo Presentation

Sun, Aug 28, 2011

NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8

Five-Segment Solid Rocket Booster Burn Expected To Last About Two Minutes

NASA and Alliant Techsystems (ATK) will conduct a full-scale test of a five-segment, solid rocket motor at the ATK Aerospace Systems test facility in Promontory, Utah, at 1605 EDT, Thursday, Sept. 8. The static firing of the five-segment solid rocket motor, designated Development Motor-3 (DM-3), will last approximately two minutes. DM-3 is the third in a series of development motors and the most heavily instrumented solid rocket motor in NASA history, with a total of 37 test objectives measured through more than 970 instruments.

The DM-3 incorporates several performance-based improvements to the designs of the first two development motors. Additionally, the core of DM-3 will be heated to 90 degrees Fahrenheit for this full-duration firing to verify the motor's performance at high temperatures. This test will continue to advance understanding of five-segment solid rocket motor performance and specifically assess performance at the highest end of the motor's accepted temperature range. Through development testing, the solid rocket motor will be certified to fly at ambient temperatures ranging from 40 to 90 degrees Fahrenheit.

The DM-3 test will follow wind constraint requirements different than past development motors. Two days before the test, ATK's public relations will notify registered media of a go/no-go decision. If no-go, the test will slip to the next day. Notification of a decision to proceed will be made via email, website  and social media (Facebook and Twitter).

The solid rocket motor is managed by NASA's Marshall Space Flight Center in Huntsville, AL. ATK Space Systems is the prime contractor.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (10.15.17): Nonapproach Control Tower

Nonapproach Control Tower Authorizes aircraft to land or takeoff at the airport controlled by the tower or to transit the Class D airspace. The primary function of a nonapproach co>[...]

Airborne-Unmanned 10.10.17: Boeing Buying Aurora, DJI Privacy Mode, UAS Delivery

Also: UAS Firefighting, Self-Driving Cars, Karma Drone Follows, Futuristic Unmanned Aircraft, 50-mile UTM Corridor Boeing has announced that it will acquire Aurora Flight Sciences >[...]

ANN FAQ: You Can Sponsor ANN And/Or Aero-TV!

Help ANN Grow So That We Can Be Of Greater Service To You! For the better part of a dozen years, ANN has set the pace for the growing and evolving aero-info revolution. No other ne>[...]

ANN's Daily Aero-Linx (10.16.17)

Aero Linx: The Combat Helicopter Pilots Association (CHPA) The Combat Helicopter Pilots Association (CHPA) was incorporated as a Non-Profit, 501 (c) 19 veterans organization in Was>[...]

AMA Drone Report 10.12.17: NTSB--Drone v Blackhawk, City Drops Reg, DJI Privacy

Also: PassengerDrone, FAA Reauthorization Extension, UAS Pilot Certification, Workhorse Surefly The NTSB is now offering public details of the alleged collision between a hobby dro>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC