NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 03.23.15

Airborne 03.24.15

Airborne 03.25.15

Airborne 03.26.15

Airborne 03.27.15

Airborne Hi-Def On YouTube

Airborne 03.23.15

Airborne 03.24.15

Airborne 03.25.15

Airborne 03.26.15

Airborne 03.27.15

Sun, Aug 28, 2011

NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8

Five-Segment Solid Rocket Booster Burn Expected To Last About Two Minutes

NASA and Alliant Techsystems (ATK) will conduct a full-scale test of a five-segment, solid rocket motor at the ATK Aerospace Systems test facility in Promontory, Utah, at 1605 EDT, Thursday, Sept. 8. The static firing of the five-segment solid rocket motor, designated Development Motor-3 (DM-3), will last approximately two minutes. DM-3 is the third in a series of development motors and the most heavily instrumented solid rocket motor in NASA history, with a total of 37 test objectives measured through more than 970 instruments.

The DM-3 incorporates several performance-based improvements to the designs of the first two development motors. Additionally, the core of DM-3 will be heated to 90 degrees Fahrenheit for this full-duration firing to verify the motor's performance at high temperatures. This test will continue to advance understanding of five-segment solid rocket motor performance and specifically assess performance at the highest end of the motor's accepted temperature range. Through development testing, the solid rocket motor will be certified to fly at ambient temperatures ranging from 40 to 90 degrees Fahrenheit.

The DM-3 test will follow wind constraint requirements different than past development motors. Two days before the test, ATK's public relations will notify registered media of a go/no-go decision. If no-go, the test will slip to the next day. Notification of a decision to proceed will be made via email, website  and social media (Facebook and Twitter).

The solid rocket motor is managed by NASA's Marshall Space Flight Center in Huntsville, AL. ATK Space Systems is the prime contractor.

FMI: www.nasa.gov

Advertisement

More News

Airborne 03.27.15: Cockpit Changes Announced, Maine v UAVs, NBAA v Santa Monica

Also: AirVenture Update, Barnstorming Opines On Media Aero-Reporting, NTSB Update, ERAU Scholarships, Doolittle Raiders, Tecnam P2010 The loss of Germanwings Flight 9525 due to wha>[...]

Aero-News: Quote Of The Day (03.29.15)

"Rover challenge puts students in the driver's seat of real-world engineering. Students perform research with computer-aided designs, select and fabricate components using mechanic>[...]

ANN's Daily Aero-Term (03.29.15): Comet

Comet A ball of rock and ice, often referred to as a “dirty snowball.” Typically a few kilometers in diameter, comets orbit the Sun in paths that either allow them to p>[...]

ANN's Daily Aero-Linx (03.29.15)

Aero Linx: New Jersey Aviation Association NJAA was formed in 2000 to promote, protect and preserve the state's multi billion dollar general aviation industry. Its membership inclu>[...]

NASA Core Flight System Software Available To The Public

NASA Goddard Releases Open Source Application Suite The Innovative Technology Partnerships Office at NASA's Goddard Space Flight Center in Greenbelt, Maryland, announced the releas>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC