NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne On ANN

ADR 01.23.17

Airborne 01.23.17

Airborne 01.24.17

Airborne 01.18.17

Airborne 01.19.17

Airborne 01.20.17

Airborne Hi-Def On YouTube

ADR 01.23.17

Airborne 01.23.17

Airborne 01.24.17

Airborne 01.18.17

Airborne 01.19.17

Airborne 01.20.17

Sun, Aug 28, 2011

NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8

Five-Segment Solid Rocket Booster Burn Expected To Last About Two Minutes

NASA and Alliant Techsystems (ATK) will conduct a full-scale test of a five-segment, solid rocket motor at the ATK Aerospace Systems test facility in Promontory, Utah, at 1605 EDT, Thursday, Sept. 8. The static firing of the five-segment solid rocket motor, designated Development Motor-3 (DM-3), will last approximately two minutes. DM-3 is the third in a series of development motors and the most heavily instrumented solid rocket motor in NASA history, with a total of 37 test objectives measured through more than 970 instruments.

The DM-3 incorporates several performance-based improvements to the designs of the first two development motors. Additionally, the core of DM-3 will be heated to 90 degrees Fahrenheit for this full-duration firing to verify the motor's performance at high temperatures. This test will continue to advance understanding of five-segment solid rocket motor performance and specifically assess performance at the highest end of the motor's accepted temperature range. Through development testing, the solid rocket motor will be certified to fly at ambient temperatures ranging from 40 to 90 degrees Fahrenheit.

The DM-3 test will follow wind constraint requirements different than past development motors. Two days before the test, ATK's public relations will notify registered media of a go/no-go decision. If no-go, the test will slip to the next day. Notification of a decision to proceed will be made via email, website  and social media (Facebook and Twitter).

The solid rocket motor is managed by NASA's Marshall Space Flight Center in Huntsville, AL. ATK Space Systems is the prime contractor.

FMI: www.nasa.gov

Advertisement

More News

Airborne 01.23.17: PMA Approval Breakthrough, PBoR in Legal Ruling, R44 Cadet

Also: DJI Phantom 4, SpaceX Launch Vid, BasicMed AC, Rolls-Royce, Next F-35A Base, UAV Perched Ldg, K-MAX A proposed new compliance pathway for Parts Manufacturer Approval for manu>[...]

AMA Drone Report 01.23.17: AMA Expo West, Propel Star Wars Drones, Lily Folds

Also: Ready Made RC FPV Fest, ERAU Offering Drone Course, Second Drone Advisory Committee Meeting AMA Expo West was quite a transition for the ANN crew... who went from the insanit>[...]

Airborne 01.23.17: PMA Approval Breakthrough, PBoR in Legal Ruling, R44 Cadet

Also: DJI Phantom 4, SpaceX Launch Vid, BasicMed AC, Rolls-Royce, Next F-35A Base, UAV Perched Ldg, K-MAX A proposed new compliance pathway for Parts Manufacturer Approval for manu>[...]

Air Force COS Goldfein Addresses Priorities For The 21st Century

Outlines His Perspective For The Future Of American Air Power Air Force Chief of Staff Gen. David L. Goldfein outlined his perspective on the future of American airpower and how Ai>[...]

AeroSports Update: FAI World Glider Championship Results

The 34th FAI World Gliding Championships In Australia Ends On A High A hard two-week battle in Australian skies sees three new FAI Gliding World Champions win gold. Three new FAI G>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC