NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 05.23.16

Airborne 05.24.16

Airborne 05.25.16

Airborne 05.26.16

Airborne 05.27.16

Airborne Hi-Def On YouTube

Airborne 05.23.16

Airborne 05.24.16

Airborne 05.25.16

Airborne 05.26.16

Airborne 05.27.16

AEA2016 LIVE Aero-TV: 04/27-0830ET, 04/28-1400ET, 04/29-1100ET

Sun 'n Fun 2016 Innovation Preview on Vimeo!

Sun 'n Fun 2016 Innovation Preview on YouTube!

Sun, Aug 28, 2011

NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8

Five-Segment Solid Rocket Booster Burn Expected To Last About Two Minutes

NASA and Alliant Techsystems (ATK) will conduct a full-scale test of a five-segment, solid rocket motor at the ATK Aerospace Systems test facility in Promontory, Utah, at 1605 EDT, Thursday, Sept. 8. The static firing of the five-segment solid rocket motor, designated Development Motor-3 (DM-3), will last approximately two minutes. DM-3 is the third in a series of development motors and the most heavily instrumented solid rocket motor in NASA history, with a total of 37 test objectives measured through more than 970 instruments.

The DM-3 incorporates several performance-based improvements to the designs of the first two development motors. Additionally, the core of DM-3 will be heated to 90 degrees Fahrenheit for this full-duration firing to verify the motor's performance at high temperatures. This test will continue to advance understanding of five-segment solid rocket motor performance and specifically assess performance at the highest end of the motor's accepted temperature range. Through development testing, the solid rocket motor will be certified to fly at ambient temperatures ranging from 40 to 90 degrees Fahrenheit.

The DM-3 test will follow wind constraint requirements different than past development motors. Two days before the test, ATK's public relations will notify registered media of a go/no-go decision. If no-go, the test will slip to the next day. Notification of a decision to proceed will be made via email, website  and social media (Facebook and Twitter).

The solid rocket motor is managed by NASA's Marshall Space Flight Center in Huntsville, AL. ATK Space Systems is the prime contractor.

FMI: www.nasa.gov

Advertisement

More News

Toledo Police Helicopter May Be Grounded

Department Seeks Grants To Help Keep Aircraft Flying The police department in Toledo, OH may be forced to ground its helicopter unless it is able to identify a grant for the $300,0>[...]

Bill Gordon Lost In Hudson River P-47 Ditching

Despite What Appeared To Be A Decent Ditching Effort, An Outstanding Pilot Was Lost The airshow community has suffered its second tragedy in nearly as many weeks as long-time warbi>[...]

Aero-News: Quote Of The Day (05.29.16)

"Putting the world's largest satellite constellation into orbit is an enormous task and Arianespace is ideally suited to launch the initial constellation, allowing OneWeb to start >[...]

ANN FAQ: How To Get YOUR News Out On Aero-News

Good News, Bad News... It's ALL News As the preeminent online aviation news resource out there, the editorial staff at Aero-News sees a large number of news releases. We look at al>[...]

Dubai-Based Business Jet Operator Enhances In-Flight Wi-Fi Services

Empire Aviation Group Selects Honeywell Technologies For Its Entire Fleet Honeywell has signed an agreement with Empire Aviation Group to provide its full suite of GoDirect connect>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC