NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne 12.11.17

Airborne-Unmanned 12.12.17

Airborne 12.13.17

AMA Drone Report 12.14.17

Airborne 12.08.17

Airborne-YouTube

Airborne 12.11.17

Airborne-Unmanned 12.12.17

Airborne 12.13.17

AMA Drone Report 12.14.17

Airborne 12.08.17

Sun, Aug 28, 2011

NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8

Five-Segment Solid Rocket Booster Burn Expected To Last About Two Minutes

NASA and Alliant Techsystems (ATK) will conduct a full-scale test of a five-segment, solid rocket motor at the ATK Aerospace Systems test facility in Promontory, Utah, at 1605 EDT, Thursday, Sept. 8. The static firing of the five-segment solid rocket motor, designated Development Motor-3 (DM-3), will last approximately two minutes. DM-3 is the third in a series of development motors and the most heavily instrumented solid rocket motor in NASA history, with a total of 37 test objectives measured through more than 970 instruments.

The DM-3 incorporates several performance-based improvements to the designs of the first two development motors. Additionally, the core of DM-3 will be heated to 90 degrees Fahrenheit for this full-duration firing to verify the motor's performance at high temperatures. This test will continue to advance understanding of five-segment solid rocket motor performance and specifically assess performance at the highest end of the motor's accepted temperature range. Through development testing, the solid rocket motor will be certified to fly at ambient temperatures ranging from 40 to 90 degrees Fahrenheit.

The DM-3 test will follow wind constraint requirements different than past development motors. Two days before the test, ATK's public relations will notify registered media of a go/no-go decision. If no-go, the test will slip to the next day. Notification of a decision to proceed will be made via email, website  and social media (Facebook and Twitter).

The solid rocket motor is managed by NASA's Marshall Space Flight Center in Huntsville, AL. ATK Space Systems is the prime contractor.

FMI: www.nasa.gov

Advertisement

More News

President Trump Signs Space Policy Directive 1

Instructs NASA To Refocus On Manned Space Exploration President Donald Trump is sending astronauts back to the Moon. The president Monday signed at the White House Space Policy Dir>[...]

AMA Drone Report 12.07.17: AMA Supports GoFly, ALPA v UAS, EU Drone Regs

Also: Drones Hunt Pythons, MI State Regs, Thanksgiving Drone Flying, Drone Collision Report A little outside our normal coverage responsibilities, nonetheless, we’re intrigue>[...]

Airborne 12.11.17: Pilatus PC-24 Cert, VerdeGo Aero, Canada Nixes Hornets

Also: Engine Coatings Facility, Wrong Runway At JFK, ATR 72-600 Flight Sim, Regional Airline Association Pilatus has obtained type certificates from the FAA and EASA for the first >[...]

Airborne-Unmanned 12.12.17: ERAU Storm Chaser, USMC Drone Insignia, Malawian UAV

Also: NLR Signs Agreement, QinetiQ, Big Bend Community College, 2nd Annual UAS Conference, Tigershark UAS Kicking off a series of tests for its capstone project, the UAV Storm Chas>[...]

Airborne-Unmanned 12.12.17: ERAU Storm Chaser, USMC Drone Insignia, Malawian UAV

Also: NLR Signs Agreement, QinetiQ, Big Bend Community College, 2nd Annual UAS Conference, Tigershark UAS Kicking off a series of tests for its capstone project, the UAV Storm Chas>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC