NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 09.17.14 ** HD iPad-Friendly -- Airborne 09.17.14 **
** Airborne 09.15.14 ** HD iPad-Friendly -- Airborne 09.15.14 **
** Airborne 09.12.14 ** HD iPad-Friendly -- Airborne 09.12.14 **

Sun, Aug 28, 2011

NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8

Five-Segment Solid Rocket Booster Burn Expected To Last About Two Minutes

NASA and Alliant Techsystems (ATK) will conduct a full-scale test of a five-segment, solid rocket motor at the ATK Aerospace Systems test facility in Promontory, Utah, at 1605 EDT, Thursday, Sept. 8. The static firing of the five-segment solid rocket motor, designated Development Motor-3 (DM-3), will last approximately two minutes. DM-3 is the third in a series of development motors and the most heavily instrumented solid rocket motor in NASA history, with a total of 37 test objectives measured through more than 970 instruments.

The DM-3 incorporates several performance-based improvements to the designs of the first two development motors. Additionally, the core of DM-3 will be heated to 90 degrees Fahrenheit for this full-duration firing to verify the motor's performance at high temperatures. This test will continue to advance understanding of five-segment solid rocket motor performance and specifically assess performance at the highest end of the motor's accepted temperature range. Through development testing, the solid rocket motor will be certified to fly at ambient temperatures ranging from 40 to 90 degrees Fahrenheit.

The DM-3 test will follow wind constraint requirements different than past development motors. Two days before the test, ATK's public relations will notify registered media of a go/no-go decision. If no-go, the test will slip to the next day. Notification of a decision to proceed will be made via email, website  and social media (Facebook and Twitter).

The solid rocket motor is managed by NASA's Marshall Space Flight Center in Huntsville, AL. ATK Space Systems is the prime contractor.

FMI: www.nasa.gov

Advertisement

More News

Airborne 09.17.14: Boeing/SpaceX Win CCtCap, Flying Docs Endorse, Jetpack Bucks

Also: Chris Heintz, Lear 70/75 Certs, Beluga Birthday, Leap Frogs 9/11 Jump Cancelled, Lawyers Sue NTSB The Commercial Spaceflight Federation congratulates NASA and the winners of >[...]

Aero-Analysis: The Choice Has Been Made

NASA Down-Selects Spacecraft For The “Commercial Crew” Program Just after 4:00 pm Eastern Time, NASA Administrator Charlie Bolden announced the agency’s choice of>[...]

Aero-TV: MGL’s Mighty Mite – The Tremendously Versatile Discovery Lite

Small But Feature-Packed, The Discovery Lite Impresses While at EAA AirVenture Oshkosh 2014, ANN’s News Editor, Tom Patton, checks in at the MGL exhibition to see how glass p>[...]

Latest Space Item Up For Auction Is A Viking Lander Engine

>[...]

Reno Results Questioned By Some Fans And Pilots

Committee Judge Ruled That Thom Richard Crossed The Showline, Was Disqualified Sunday, Sept. 14 concluded what was one of the most competitive National Championship Air Races in re>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC