NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Most Recent Daily Airborne

Airborne On ANN

Airborne On YouTube/Hi-Def/Mac Friendly

Monday

Airborne 01.26.15

Airborne 01.26.15

Tuesday

Airborne 01.27.15

Airborne 01.27.15

Wednesday

Airborne 01.28.15

Airborne 01.28.15

Thursday

Airborne 01.29.15

Airborne 01.29.15

Friday

Airborne 01.30.15

Airborne 01.30.15

Sun, Aug 28, 2011

NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8

Five-Segment Solid Rocket Booster Burn Expected To Last About Two Minutes

NASA and Alliant Techsystems (ATK) will conduct a full-scale test of a five-segment, solid rocket motor at the ATK Aerospace Systems test facility in Promontory, Utah, at 1605 EDT, Thursday, Sept. 8. The static firing of the five-segment solid rocket motor, designated Development Motor-3 (DM-3), will last approximately two minutes. DM-3 is the third in a series of development motors and the most heavily instrumented solid rocket motor in NASA history, with a total of 37 test objectives measured through more than 970 instruments.

The DM-3 incorporates several performance-based improvements to the designs of the first two development motors. Additionally, the core of DM-3 will be heated to 90 degrees Fahrenheit for this full-duration firing to verify the motor's performance at high temperatures. This test will continue to advance understanding of five-segment solid rocket motor performance and specifically assess performance at the highest end of the motor's accepted temperature range. Through development testing, the solid rocket motor will be certified to fly at ambient temperatures ranging from 40 to 90 degrees Fahrenheit.

The DM-3 test will follow wind constraint requirements different than past development motors. Two days before the test, ATK's public relations will notify registered media of a go/no-go decision. If no-go, the test will slip to the next day. Notification of a decision to proceed will be made via email, website  and social media (Facebook and Twitter).

The solid rocket motor is managed by NASA's Marshall Space Flight Center in Huntsville, AL. ATK Space Systems is the prime contractor.

FMI: www.nasa.gov

Advertisement

More News

Citizen Scientists Lead Astronomers To Mystery Objects In Space

'Yellow Balls' Discovered By Volunteers Studying Spitzer Images Sometimes it takes a village to find new and unusual objects in space. Volunteers scanning tens of thousands of star>[...]

Aero-News: Quote Of The Day (02.01.15)

"While this star formed a long time ago, in fact before most of the stars in the Milky Way, we have no indication that any of these planets have now or ever had life on them. At th>[...]

ANN's Daily Aero-Term (02.01.15): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Air Ambulance Market Size, Vendor Landscape Analyzed In New Report

New Global Air Ambulance Research Report Shows Projected Growth Of Nearly Ten Percent The Global Air Ambulance market is expected to grow at a CAGR (Compound Annual Growth Rate) of>[...]

US Navy Approves F/A-18 IRST System For Production

Long-Range Sensor System Demonstrated Production Readiness On Super Hornet The F/A-18 Super Hornet infrared search and track (IRST) system, developed and integrated by Boeing and L>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC