NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne 02.19.18

Airborne-UnManned 02.20.18

Airborne 02.21.18

AMA Drone Report 02.22.18

Airborne 02.16.18

Airborne-YouTube

Airborne 02.19.18

Airborne-UnManned 02.20.18

Airborne 02.21.18

AMA Drone Report 02.22.18

Airborne 02.16.18

Sun, Aug 28, 2011

NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8

Five-Segment Solid Rocket Booster Burn Expected To Last About Two Minutes

NASA and Alliant Techsystems (ATK) will conduct a full-scale test of a five-segment, solid rocket motor at the ATK Aerospace Systems test facility in Promontory, Utah, at 1605 EDT, Thursday, Sept. 8. The static firing of the five-segment solid rocket motor, designated Development Motor-3 (DM-3), will last approximately two minutes. DM-3 is the third in a series of development motors and the most heavily instrumented solid rocket motor in NASA history, with a total of 37 test objectives measured through more than 970 instruments.

The DM-3 incorporates several performance-based improvements to the designs of the first two development motors. Additionally, the core of DM-3 will be heated to 90 degrees Fahrenheit for this full-duration firing to verify the motor's performance at high temperatures. This test will continue to advance understanding of five-segment solid rocket motor performance and specifically assess performance at the highest end of the motor's accepted temperature range. Through development testing, the solid rocket motor will be certified to fly at ambient temperatures ranging from 40 to 90 degrees Fahrenheit.

The DM-3 test will follow wind constraint requirements different than past development motors. Two days before the test, ATK's public relations will notify registered media of a go/no-go decision. If no-go, the test will slip to the next day. Notification of a decision to proceed will be made via email, website  and social media (Facebook and Twitter).

The solid rocket motor is managed by NASA's Marshall Space Flight Center in Huntsville, AL. ATK Space Systems is the prime contractor.

FMI: www.nasa.gov

Advertisement

More News

Airborne 02.21.18: AEA Report, Aerocor Eclipse Program, WWII Airman Recovered

Also: Gulfstream To Expand, Med-Trans Partners, FAA SAIB On AT-6, Passenger Gas Curtails Flight The AEA has released its 2017 year-end Avionics Market Report. Total worldwide busin>[...]

Airborne-Unmanned 02.20.18: USMC InstantEye, Raleigh Reconsiders, Battle Drones

Also: Fortem DroneHunter, Solar-Powered Rover, Drone Mkt Worth $48.88B, MQ-25 Partnerships InstantEye Robotics has received a substantial order from PMA-263, the Navy and Marine Co>[...]

AMA Drone Report 02.15.18: AMA Expo East, Skydio R1, TSB Canada Report

Also: DJI Knowledge Quiz, GoFly Competition, Drone ID Rules Coming, FAA Unenthusiastic About Prosecuting? The Academy of Model Aeronautics will host the annual AMA Expo East at the>[...]

AMA Drone Report 02.22.18: AMA Expo!, Raleigh Update, UAV v Helo... or Not?

Also: AMA Active In Counseling Gov'ts, Intel Drone Light Show, Drone Park Planned, ALPA Attacks Unmanned Don’t forget... The annual AMA Expo East starts at the Meadowlands Ex>[...]

AMA Drone Report 02.22.18: AMA Expo!, Raleigh Update, UAV v Helo... or Not?

Also: AMA Active In Counseling Gov'ts, Intel Drone Light Show, Drone Park Planned, ALPA Attacks Unmanned Don’t forget... The annual AMA Expo East starts at the Meadowlands Ex>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2018 Web Development & Design by Pauli Systems, LC