NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne-Unmanned w/AUVSI

Airborne On ANN

AMA 08.10.17

Airborne 08.14.17

Airborne 08.15.17

Airborne 08.16.17

Airborne 08.10.17

Airborne 08.11.17

Airborne-Unmanned 08.15.17

Airborne-YouTube

AMA 08.10.17

Airborne 08.14.17

Airborne 08.15.17

Airborne 08.16.17

Airborne 08.10.17

Airborne 08.11.17

Airborne-Unmanned 08.15.17

NEW!!! 2017 AirVenture Innovation Preview -- YouTube Presentation / Vimeo Presentation

Sun, Aug 28, 2011

NASA And ATK Full-Scale Solid Rocket Motor Test Set For Sept. 8

Five-Segment Solid Rocket Booster Burn Expected To Last About Two Minutes

NASA and Alliant Techsystems (ATK) will conduct a full-scale test of a five-segment, solid rocket motor at the ATK Aerospace Systems test facility in Promontory, Utah, at 1605 EDT, Thursday, Sept. 8. The static firing of the five-segment solid rocket motor, designated Development Motor-3 (DM-3), will last approximately two minutes. DM-3 is the third in a series of development motors and the most heavily instrumented solid rocket motor in NASA history, with a total of 37 test objectives measured through more than 970 instruments.

The DM-3 incorporates several performance-based improvements to the designs of the first two development motors. Additionally, the core of DM-3 will be heated to 90 degrees Fahrenheit for this full-duration firing to verify the motor's performance at high temperatures. This test will continue to advance understanding of five-segment solid rocket motor performance and specifically assess performance at the highest end of the motor's accepted temperature range. Through development testing, the solid rocket motor will be certified to fly at ambient temperatures ranging from 40 to 90 degrees Fahrenheit.

The DM-3 test will follow wind constraint requirements different than past development motors. Two days before the test, ATK's public relations will notify registered media of a go/no-go decision. If no-go, the test will slip to the next day. Notification of a decision to proceed will be made via email, website  and social media (Facebook and Twitter).

The solid rocket motor is managed by NASA's Marshall Space Flight Center in Huntsville, AL. ATK Space Systems is the prime contractor.

FMI: www.nasa.gov

Advertisement

More News

RFP: ANN Seeking New Site/Facility For Major Studio Upgrade

It's Official: Aggressive Upgrades For New Airborne Programs WILL Require New Digs It's been in development for years, but we're getting to a point where we think we can pull off s>[...]

AMA Drone Report 08.10.17: AMA Gov't Outreach, Nat'l Model Av Day, Lego Drones

Also: Volaero Tracks Pythons, Army v DJI, Snap Acquiring Drone?, Orlando Backs Down There’s no rest for the folks at AMA that deal with the politics that comes with flying ho>[...]

Airborne-Unmanned 08.15.17: Reno Drone Races, DoD CrackDown, Blue Angels v UAV?

Also: Kansas DOT-AirMap, CIRRUAS Drone Program, Daytona Beach PD UAS, Virginia UAS SAR The Reno Air Racing Association has signed an agreement with the MultiGP Drone Racing League >[...]

Airborne 08.15.17: Lycoming AD, Reno Drone Racing!, Santa Monica NIMBYs

Also: Icon A5 Accident, Aero-Calendar, Land Remote Sensing, Storm Aviation, Frontier, World Helicopter Day, Hubble The FAA has issued an Airworthiness Directive (AD) for the connec>[...]

Airborne 08.14.17: Concorde Return?, KSMO RWY Plans, DC Overflights

Also: San Mateo $$, Verhees Delta, Midwest Express, BizAv Activity, Cal Fire, AAR Ldg Gear, jetAVIVA The Concorde SST was retired in 2003 by British Airways and Air France after th>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC