Audit Finds USAF Acted Appropriately In CSAR-X | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.09.24

Airborne-Unlimited-04.10.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Nov 13, 2008

Audit Finds USAF Acted Appropriately In CSAR-X

Pentagon Says Air Force Followed The Rules In Making Changes

We may be finally nearing an end to the protracted battle over a lucrative US Air Force helicopter contract. A draft Pentagon audit indicates the service acted appropriately in changing four key bidding requirements in the combat search-and-rescue (CSAR-X) helicopter procurement bid.

Bloomberg reports the audit -- requested by the Senate Armed Services Committee earlier this year -- states the USAF followed protocol in making the changes, which ultimately resulted in the 2006 awarding of the CSAR-X bid to the twin-rotor Boeing HH-47. Competitors Lockheed Martin and Sikorsky promptly filed protests of that decision, and the contract has been in limbo ever since.

The nine-page audit reports states changes to the helicopter's cabin space and payload, fuel range and other mission-readiness criteria were "properly vetted" through the council "in accordance with acquisition guidelines."

The Pentagon adds the Air Force made some of those changes at the request of Sikorsky and Lockheed -- and that they were made "to address contractor requests for clarification and to ensure full and open competition." For example, those competitors asked that the Air Force Special Operations Command revise downward the target unrefueled range of operation, from 325 miles roundtrip to 275.

"Our review of the contractor-submitted documentation confirmed these concerns and the rationale for adjusting" the requirement, the audit states. "We found no indications that the changes will adversely affect special operations capabilities in the Global War on Terror."

The Air Force is reportedly on track to finally award the $15 billion CSAR-X helicopter contract next year. That decision was supposed to come sooner... but the Air Force announced a "minor delay" last month, to insure every "i" is dotted so the decision isn't protested yet again.

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Linx (04.13.24)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (04.13.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC