9,000-Hour TBO Announced for Beechcraft 1900D Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Oct 28, 2004

9,000-Hour TBO Announced for Beechcraft 1900D Engines

More Than Doubles Most Overhaul Intervals

Raytheon Airline Aviation Services (RAAS), in conjunction with Pratt & Whitney Canada, says it's come up with a 9,000-hour overhaul interval for the PT6A-67D engines installed on the Beechcraft 1900D.

Most current operators have overhaul intervals of between 6,000 hours and 8,000 hours, with some able reach 12,000 hours time between overhauls (TBOs).

"This TBO extension is a significant development that has been achieved as part of our ongoing efforts to further reduce the cost of operation of the 1900D, thereby enhancing customer value," said Mike Scheidt, President of RAAS.

The 9,000-hour TBO is available via PWC service bulletin, and allows specific engines to extend their overhaul interval to 9,000 hours or 14 years. The latter is particularly important to low-utilization applications such as corporate shuttles.

Future 1900D deliveries through RAAS will be equipped to qualify for the new TBO. Existing customers can apply for a TBO extension by referring to SB14003.

Main elements include:

  • Submitting an Operator Qualification Application which validates the operators’ ability to maintain the engines in accordance with published procedures
  • Ensuring that each engine to be qualified meets the engine build specification defined in SB14003(or will meet specification at mid-life inspection)
  • Submitting paperwork for each specific engine to be qualified
  • Installing an engine exceedance monitor
  • Performing Engine Condition Trend Monitoring (ECTM)

Complete details regarding the TBO extension are available from Raytheon Airline Aviation Services, and will also be reviewed at the Beechcraft 1900 Operators Conference, Nov. 2-4, 2004 in Wichita (KS).

FMI: www.raytheonaircraft.com

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC