Dream Chaser Passes Major NASA CCiCap Milestone | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Jul 24, 2014

Dream Chaser Passes Major NASA CCiCap Milestone

Space System Design 'Substantially Advanced' By The Accomplishment

The Dream Chaser space system has successfully passed Milestone 9, the Risk Reduction and Technology Readiness Level (TRL) Advancement Testing milestone, for several critical systems under NASA’s Commercial Crew Integrated Capability (CCiCap) agreement. Milestone 9 culminated in a major comprehensive review of various hardware systems. To date, SNC has received 92 percent of the total award value of the CCiCap agreement.

As defined in the Milestone 9 criteria, Sierra Nevada Corporation (SNC) completed a series of Risk Reduction and TRL advancements on five major systems on the technologically advanced, Dream Chaser spacecraft lifting-body design. The five specific systems subjected to extensive testing were: Crew Systems, Environmental Control and Life Support Systems (ECLSS), Structures, Thermal Control (TCS) and Thermal Protection Systems (TPS). The comprehensive set of tests were in addition to the Risk Reduction and TRL advancement tests completed on the Main Propulsion System and Reaction Control System as part of the recently, and successfully, completed CCiCap Milestone 9a, as announced in SNC’s press release of July 8, 2014. The data collected from the more than 3,500 tests completed over a year during these two milestones resulted in continued maturation of the Dream Chaser spacecraft design and significantly retired overall program risk. With the successful completion of Milestones 9 and 9a, SNC has continued to demonstrate, through rigorous testing, that it puts safety first as the team refines the highly capable spacecraft design that will ferry people to and from low-Earth orbit (LEO).

“By thoroughly assessing and mitigating each of the previously identified design risks, SNC is continuing to prove that Dream Chaser is a safe, robust, and reliable spacecraft,” said Mark N. Sirangelo, corporate vice president of SNC’s Space Systems. “These crucial validations are vital steps in our Critical Design Review and in showing that we have a very advanced and capable spacecraft. This will allow us to quickly and confidently move forward in restoring cutting-edge transportation to low-Earth orbit from the U.S.”

The comprehensive Milestone 9 systems tests that were conducted included:

  • TPS: Extensive design qualification testing was conducted at NASA’s Ames Research Center in California and NASA’s Langley Research Center in Virginia through existing Space Act Agreements to validate TPS design performance. This effort included over 350 tests that allowed SNC to select the optimal TPS architecture for Dream Chaser to safely fly through the high-heat-load atmospheric environment during nominal return to Earth as well as during high altitude ascent aborts.
  • Structures: Numerous tests were conducted in collaboration with SNC Dream Team member Lockheed Martin at NASA’s Michoud Assembly Facility in Louisiana. More than 1,500 stress tests were executed on the primary structure to fully validate the strength and reliability of the Dream Chaser advanced composite structure.
  • Crew Systems: Multiple tests were performed at SNC’s Space Systems headquarters in Louisville, Colorado. These crew-related assessments included reach and visibility, as well as crew ingress and egress testing in the horizontal and vertical positions, all in the new full-scale Dream Chaser crew cabin mockup. Over 25 tests were conducted totaling more than 90 hours of data.
  • ECLSS: Human-in-the-loop tests were performed to analyze temperatures and metabolic rates for crew as part of an in-orbit simulation at Orbital Technologies Corporation (ORBITEC) of Wisconsin in conjunction with their teammate UTC Aerospace in Connecticut.
  • TCS: Both internal and external active thermal control of the spacecraft was successfully demonstrated through rigorous testing by Orbitec at their facilities.

Collectively, this broad array of rigorous testing exemplifies SNC’s commitment to safety, transparency, and technical rigor as part of an overall test-rich spacecraft development strategy. SNC is working with NASA’s Commercial Crew Program during the development of the Dream Chaser -- a safe, innovative, modern, flexible and highly-capable crew transportation system for the 21st Century. Dream Chaser provides the only reusable, human-rated, lifting-body spacecraft with a commercial runway landing capability, anywhere in the world. SNC is on the forefront of the commercial human spaceflight industry, offering safe, reliable and cost-effective crew and critical cargo transportation to and from LEO.

(Image provided by Sierra Nevada Corp. SNC former astronaut Lee Archambault prepares for Dream Chaser Crew Systems Test)

FMI: www.sncspace.com

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC