FAA OKs 130 Wind Turbines For Cape Wind Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Oshkosh Day One

Oshkosh Day Two

Airborne 07.20.16

Airborne 07.21.16

Airborne 07.22.16

Airborne Hi-Def On YouTube

Oshkosh Day One

Oshkosh Day Two

Airborne 07.20.16

Airborne 07.21.16

Airborne 07.22.16

Tweet Us The Coolest Things You See @OSH16!
#OSH16Coolest!

It's Alive!: AirVenture 2016 Innovation Preview on Vimeo!

It's Alive!: AirVenture 2016 Innovation Preview on YouTube!

 

Fri, Aug 17, 2012

FAA OKs 130 Wind Turbines For Cape Wind Program

Wind Generators In Nantucket Sound Not A Safety Concern

The FAA on Wednesday issued a “Does Not Exceed (DNE)” determination for the proposed construction of 130 wind turbines in Nantucket Sound.

The FAA completed an aeronautical study and has determined that the proposed construction of the 130 wind turbines, individually and as a group, has no effect on aeronautical operations. Therefore, the FAA concludes that the project, if constructed as proposed, poses no hazard to air navigation.

The FAA makes obstruction evaluations based on safety considerations and the available solutions to mitigate potential risks.

But 130 of the wind turbines is apparently as high as the FAA is willing to go. In its letter approving the structures, the agency said additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights. The agency said any changes in coordinates will void the determination, and any future construction or alteration requires separate notice to the FAA.

The FAA said the determination includes temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA.

"This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body," the FAA said.

FMI: FAA Determination

Advertisement

More News

Airborne 07.25.16: Pelton Opens OSH16!, Textron Denali, Eclipse CANADA

Also: PS Engineering Update, Martin Mars Wows Oshkosh, Garmin Plays 'Me, Too' With STCs, Comprehensive Jack Pelton Intvw, Part 1 EAA's Jack Pelton opened up Oshkosh 2016 with some >[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN!>[...]

Airborne 07.22.16: ONE Aviation New Jet, Drone Pilot Nabbed, Stemme Twin Voyager

Also: AEA Giveaway, 44 Trips To OSH, Airbus Drones, Future Pilots, NTSB Training, Air BP, Boeing Forecast, ALPA Milestone ONE Aviation has provided ANN with the initial outline for>[...]

Only Sporty's!!! Sporty's Pilot Shop Helps ANN Cover Oshkosh 2016!

Sporty's Pilot Shop Is A Pivotal GA Resource! Sporty’s Pilot Shop was founded over 50 years ago by a flight instructor, and ever since has been for pilots and by pilots. Hal >[...]

Aspen Avionics, True Innovators, Present OSH2016 Special Event Coverage!

OSH2016 Sponsor: Always-Innovative Aspen Avionics Based in Albuquerque, New Mexico, Aspen Avionics specializes in bringing the most advanced display and sensor technology from the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC