FAA OKs 130 Wind Turbines For Cape Wind Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne On ANN

ADR 02.20.17

Airborne 02.20.17

Airborne 02.21.17

Airborne 02.22.17

Airborne 02.23.17

Airborne 02.24.17

Airborne-HD On YouTube

ADR 02.20.17

Airborne 02.20.17

Airborne 02.21.17

Airborne 02.22.17

Airborne 02.23.17

Airborne 02.24.17

Fri, Aug 17, 2012

FAA OKs 130 Wind Turbines For Cape Wind Program

Wind Generators In Nantucket Sound Not A Safety Concern

The FAA on Wednesday issued a “Does Not Exceed (DNE)” determination for the proposed construction of 130 wind turbines in Nantucket Sound.

The FAA completed an aeronautical study and has determined that the proposed construction of the 130 wind turbines, individually and as a group, has no effect on aeronautical operations. Therefore, the FAA concludes that the project, if constructed as proposed, poses no hazard to air navigation.

The FAA makes obstruction evaluations based on safety considerations and the available solutions to mitigate potential risks.

But 130 of the wind turbines is apparently as high as the FAA is willing to go. In its letter approving the structures, the agency said additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights. The agency said any changes in coordinates will void the determination, and any future construction or alteration requires separate notice to the FAA.

The FAA said the determination includes temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA.

"This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body," the FAA said.

FMI: FAA Determination

Advertisement

More News

Counting Down! ANN's Infamous April 1st Edition's Just Around The Corner!

Get Your Wacky Ideas In NOW! ANN E-I-C Note: Folks... we gotta warn you... our Annual April 1st Editions are LEGENDARY -- and this WILL be our best April 1st Edition yet. Based on >[...]

Airborne 02.24.17: RV-10 Suit Dismissed, 2016 GA Sales, Red Tail Legacy

Also: Falcon 9 Landing, TFR Busts, Denton Airshow, QF-16, Treasure Coast, 'Fly Safe' Campaign, Juno Mission When the news first came out, in 2015, that Van's Aircraft was sued for >[...]

Sun 'N Fun To Host Massive Gathering Of P-51 Mustangs

Expected To Be The Largest Assembly Of P-51s In A Decade Or More It is being billed as possibly the largest gathering of P-51 Mustangs in a decade or more ... on Wednesday, April 5>[...]

DJI Hints At A New Drone, Reveals Details Early

Industry WAS Speculating What The Drone Giant May Be Bringing To Market Next Generating buzz is good marketing, and DJI was doing so with a Tweet announcing new products for the Mo>[...]

Klyde Morris (02.27.17)

Klyde Is Amazed By All The Ways NASA Info Gets Interpreted FMI: www.klydemorris.com>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC