FAA OKs 130 Wind Turbines For Cape Wind Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne 02.19.18

Airborne-UnManned 02.20.18

Airborne 02.14.18

AMA Drone Report 02.15.18

Airborne 02.16.18

Airborne-YouTube

Airborne 02.19.18

Airborne-UnManned 02.20.18

Airborne 02.14.18

AMA Drone Report 02.15.18

Airborne 02.16.18

Fri, Aug 17, 2012

FAA OKs 130 Wind Turbines For Cape Wind Program

Wind Generators In Nantucket Sound Not A Safety Concern

The FAA on Wednesday issued a “Does Not Exceed (DNE)” determination for the proposed construction of 130 wind turbines in Nantucket Sound.

The FAA completed an aeronautical study and has determined that the proposed construction of the 130 wind turbines, individually and as a group, has no effect on aeronautical operations. Therefore, the FAA concludes that the project, if constructed as proposed, poses no hazard to air navigation.

The FAA makes obstruction evaluations based on safety considerations and the available solutions to mitigate potential risks.

But 130 of the wind turbines is apparently as high as the FAA is willing to go. In its letter approving the structures, the agency said additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights. The agency said any changes in coordinates will void the determination, and any future construction or alteration requires separate notice to the FAA.

The FAA said the determination includes temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA.

"This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body," the FAA said.

FMI: FAA Determination

Advertisement

More News

Airborne 02.19.18: TruTrak Vizion Approvals, 737 MAX 9 Cert, Airplane Loan Scam

Also: Frasca Celebrates 60 Years, Klyde’s 40th!, European Plan For AvSafety, Texas Aviation Hall Of Fame The STC for the TruTrak Vizion autopilot has been updated to include >[...]

Airborne 02.19.18: TruTrak Vizion Approvals, 737 MAX 9 Cert, Airplane Loan Scam

Also: Frasca Celebrates 60 Years, Klyde’s 40th!, European Plan For AvSafety, Texas Aviation Hall Of Fame The STC for the TruTrak Vizion autopilot has been updated to include >[...]

Airborne-Unmanned 02.13.18: FAA UAS Symposium, Airbus Delivers, Manned EHANG 184

Also: UAS Pilot Code, FAA Drone Program, SkyWatch Funding, Quantix Hybrid UAS For Farmers The FAA and AUVSI will co-host the 3rd Annual FAA Unmanned Aircraft Systems (UAS) Symposiu>[...]

AMA Drone Report 02.15.18: AMA Expo East, Skydio R1, TSB Canada Report

Also: DJI Knowledge Quiz, GoFly Competition, Drone ID Rules Coming, FAA Unenthusiastic About Prosecuting? The Academy of Model Aeronautics will host the annual AMA Expo East at the>[...]

Airborne 02.16.18: R66 Wire-Strike Protection, Elk v Helo, Trump Budget

Also: Red Bull Picks Hartzell, SNC Dream Chaser, CH-53K Demo's Vehicle Lift, Emirates Firms Up A380 Orders Robinson has added wire strike protection provisions to its R66 options l>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2018 Web Development & Design by Pauli Systems, LC