FAA OKs 130 Wind Turbines For Cape Wind Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

 

** Airborne 07.30.14/Oshkosh Day 3! ** HD iPad-Friendly Version--Airborne 07.30.14/Oshkosh Day 3 **
** Airborne 07.29.14/Oshkosh Day 2! ** HD iPad-Friendly Version--Airborne 07.29.14/Oshkosh Day 2 **
** Airborne 07.28.14/Oshkosh Day 1! ** HD iPad-Friendly Version--Airborne 07.28.14/Oshkosh Day 1 **

Fri, Aug 17, 2012

FAA OKs 130 Wind Turbines For Cape Wind Program

Wind Generators In Nantucket Sound Not A Safety Concern

The FAA on Wednesday issued a “Does Not Exceed (DNE)” determination for the proposed construction of 130 wind turbines in Nantucket Sound.

The FAA completed an aeronautical study and has determined that the proposed construction of the 130 wind turbines, individually and as a group, has no effect on aeronautical operations. Therefore, the FAA concludes that the project, if constructed as proposed, poses no hazard to air navigation.

The FAA makes obstruction evaluations based on safety considerations and the available solutions to mitigate potential risks.

But 130 of the wind turbines is apparently as high as the FAA is willing to go. In its letter approving the structures, the agency said additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights. The agency said any changes in coordinates will void the determination, and any future construction or alteration requires separate notice to the FAA.

The FAA said the determination includes temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA.

"This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body," the FAA said.

FMI: FAA Determination

Advertisement

More News

Airborne 07.25.14: Global Flight Tragedy, Blue Angel Update, GA's Next Big Thing

Also: Eve Of Oshkosh, WomenVenture, Garmin Flight Stream, AEA Pilot's Guide The father-son duo of Babar Suleman and 17-year-old Haris Suleman of Plainfield Indiana had planned thei>[...]

IMC CLubs Leads The Way To OSH14 Special Event Coverage

IMC Clubs: Building Instrument Proficiency Through Community When it comes to flying, there is no substitute for proficiency and training. And maybe nowhere is that more important >[...]

Electrifying OSH2014 Sponsor: Concorde Batteries

Concorde Charges Up Our Oshkosh 2014 Coverage! Concorde Battery Corporation has been in the battery manufacturing business for over 30 years and is the world leader in Valve Regula>[...]

Innovative OSH14 Sponsor, iFlightPlanner, Provides Expert Guidance

What is iFlightPlanner? iFlightPlanner is general aviation’s most comprehensive suite of easy-to-use flight planning tools for private and corporate pilots. Featuring iFlight>[...]

OSH2014 Sponsor: Eclipse Aerospace -- In Full Production!

The Eclipse 550: Economical. Efficient. Incredible. The Eclipse 550 not only has the lowest acquisition cost of any twin-engine jet on the planet, it also has the lowest operating >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC