FAA OKs 130 Wind Turbines For Cape Wind Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne 11.20.17

Airborne-Unmanned 11.21.17

Airborne 11.22.17

AMA Drone Report 11.16.17

Airborne 11.17.17

Airborne-YouTube

Airborne 11.20.17

Airborne-Unmanned 11.21.17

Airborne 11.22.17

AMA Drone Report 11.16.17

Airborne 11.17.17

Fri, Aug 17, 2012

FAA OKs 130 Wind Turbines For Cape Wind Program

Wind Generators In Nantucket Sound Not A Safety Concern

The FAA on Wednesday issued a “Does Not Exceed (DNE)” determination for the proposed construction of 130 wind turbines in Nantucket Sound.

The FAA completed an aeronautical study and has determined that the proposed construction of the 130 wind turbines, individually and as a group, has no effect on aeronautical operations. Therefore, the FAA concludes that the project, if constructed as proposed, poses no hazard to air navigation.

The FAA makes obstruction evaluations based on safety considerations and the available solutions to mitigate potential risks.

But 130 of the wind turbines is apparently as high as the FAA is willing to go. In its letter approving the structures, the agency said additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights. The agency said any changes in coordinates will void the determination, and any future construction or alteration requires separate notice to the FAA.

The FAA said the determination includes temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA.

"This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body," the FAA said.

FMI: FAA Determination

Advertisement

More News

Airborne 11.22.17: AOPA Plays Icon Apologist, Lancair Mako, Mooney Ovation Ultra

Also: Airbus A380 Deal, Acting PM Belize In A/C Accident, Hartzell Propeller, Crop Duster Shooting ANN’s senior editorial staff was stunned to read a recent article by the AO>[...]

Airborne-Unmanned 11.21.17: Resolute Eagle UAS, Aerotain Skye, Novus Unmanned 17

Also: Mars Drone, ASTM Drones Standards, Huerta Reflects On His Tenure, UAS Delivers Acceptance Letters On Nov. 8, PAE ISR’s Resolute Eagle UAS completed its first commercial>[...]

ANN Wishes Our Readers, Listeners And Viewers A VERY Happy Thanksgiving Holiday

Yes... We Will Be On A Holiday Schedule For The Rest Of Week As the Aero-News staff observes the US holiday of Thanksgiving on Thursday, we wanted to let our readers know that ANN >[...]

Airborne 11.22.17: AOPA Plays Icon Apologist, Lancair Mako, Mooney Ovation Ultra

Also: Airbus A380 Deal, Acting PM Belize In A/C Accident, Hartzell Propeller, Crop Duster Shooting ANN’s senior editorial staff was stunned to read a recent article by the AO>[...]

Aero-News: Quote of the Day (11.23.17)

"We take great pride in our Goodyear Blimp crews teaming up with the U.S. Marine Corps Reserve to support Toys for Tots." Source: Paul Fitzhenry, senior vice president, Global Comm>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC