FAA OKs 130 Wind Turbines For Cape Wind Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 08.22.16

Airborne 08.23.16

Airborne 08.24.16

Airborne 08.25.16

Airborne 08.26.16

Airborne Hi-Def On YouTube

Airborne 08.22.16

Airborne 08.23.16

Airborne 08.24.16

Airborne 08.25.16

Airborne 08.26.16

Tweet Us The Coolest Things You See @OSH16!
#OSH16Coolest!

It's Alive!: AirVenture 2016 Innovation Preview on Vimeo!

It's Alive!: AirVenture 2016 Innovation Preview on YouTube!

Fri, Aug 17, 2012

FAA OKs 130 Wind Turbines For Cape Wind Program

Wind Generators In Nantucket Sound Not A Safety Concern

The FAA on Wednesday issued a “Does Not Exceed (DNE)” determination for the proposed construction of 130 wind turbines in Nantucket Sound.

The FAA completed an aeronautical study and has determined that the proposed construction of the 130 wind turbines, individually and as a group, has no effect on aeronautical operations. Therefore, the FAA concludes that the project, if constructed as proposed, poses no hazard to air navigation.

The FAA makes obstruction evaluations based on safety considerations and the available solutions to mitigate potential risks.

But 130 of the wind turbines is apparently as high as the FAA is willing to go. In its letter approving the structures, the agency said additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights. The agency said any changes in coordinates will void the determination, and any future construction or alteration requires separate notice to the FAA.

The FAA said the determination includes temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA.

"This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body," the FAA said.

FMI: FAA Determination

Advertisement

More News

Airborne 08.25.16: Airlander 10 Accident, M500 EASA Cert, Flying Car Frenzy

Also: Veterans Against Airshows, Redbird Migration 2016, Rocket Debris, Charles Taylor Award, Wayward Satellite, Norfolk International, Hawaiian Airlines It was only last week that>[...]

Drug Trafficker Sentenced In Virginia

Had Purchased Airplanes Used To Transport Large Quantities Of Narcotics A man who had purchased two airplanes in Virginia that were used to transport tons of cocaine between Guatem>[...]

ANN's Daily Aero-Linx (08.26.16)

Frank Ambrose Beginning as an Air Force Photographer in 1943, Frank Ambrose now operates a studio in Gloversville, New York specializing in Commercial, Industrial and Portrait phot>[...]

ANN's Daily Aero-Term (08.26.16): Position Report

A report over a known location as transmitted by an aircraft to ATC.>[...]

Aero-News: Quote of the Day (08.26.16)

"This year's research shows that South Carolina's aerospace industry is diversifying and trending towards sustainable growth." Source: Dr. Joey Von Nessen, author of the South Caro>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC