Key Milestones Reached In $1.2 Billion JFK Construction Project | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Jul 21, 2011

Key Milestones Reached In $1.2 Billion JFK Construction Project

Delta Animated Video Previews Expanded Terminal 4

The $1.2 billion expansion of Terminal 4 at John F. Kennedy International Airport is on schedule, according to a news release from Delta Air Lines. If you're traveling through JFK, the structural steel frame of the Concourse B extension is now visible.

Ahead of the 2013 opening, customers can take a virtual tour of the expanded terminal through a new animated video available on the Delta Air Lines YouTube channel. In addition, more than 80 displays throughout JFK Terminals 2, 3 and 4 and on airport vehicles display the changes customers will experience in 2013.

"Delta's expanded and enhanced Terminal 4 at JFK will provide a modern international gateway for millions of travelers and accommodate future growth for Delta in New York," said Gail Grimmett, Delta's senior vice president for New York. "The project will create 10,000 jobs in the region and $1.6 billion in economic output from the purchase of goods and services by 2014."

The Concourse B extension will include one of the largest Sky Clubs in the Delta system, as well as nine new international gates, for a total of 16 the airline will occupy. The project will improve passenger flow by adding more capacity at check-in areas and security checkpoints. The state-of-the-art facilities also will feature a new automated baggage handling system and larger shopping and dining areas post-security. The project expands baggage claim and Customs and Border Protection areas to speed fliers through the airport. Delta jets will see faster taxi times with the addition of dual taxiways, improving on-time performance.

"This is a game-changing project for our customers and the entire regional aviation system," said Chris Ward, executive director of the Port Authority of New York and New Jersey. "It increases JFK's capacity, vastly improves the customer experience for hundreds of thousands of Delta travelers and strengthens the economic competitiveness of the most important gateway in the country."

The 1.5-million-square-foot Terminal 4 covers 165 acres, making it one of North America's largest air terminals.  Delta, the Port Authority of New York and New Jersey and Terminal 4 operator JFKIAT LLC are working together to increase the terminal's size by 491,000 square feet, or nearly one third. The airline has already invested more than $70 million in its JFK hub over the last few years.

FMI: www.delta.com, www.panynj.gov/airports/jfk.html

Advertisement

More News

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

ANN's Daily Aero-Linx (04.14.24)

Aero Linx: Soaring Safety Foundation (SSF) The Soaring Safety Foundation (SSF) is the Training and Safety arm of the Soaring Society of America (SSA). Our mission is to provide ins>[...]

Classic Aero-TV: 'We're Surviving'-- Kyle Franklin Describes Airshow Life 2013

From 2013 (YouTube Version): Dracula Lives On Through Kyle Franklin... and We're NOT Scared! ANN CEO and Editor-in-Chief, Jim Campbell speaks with Aerobatic and airshow master, Kyl>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC