Reliable Production Key To F-22 Success | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Sep 20, 2004

Reliable Production Key To F-22 Success

Lockheed-Martin Calls Program Healthy, On Track

The Raptor industry team has reached a new level of program maturity with reliable production, solid performance and expanding capabilities, Lockheed Martin's Deputy Vice President for Business Development Rob Weiss said last week.

Speaking to reporters at the 2004 Air Force Association National Conference, Weiss said the F/A-22 program is healthy, solid and on track. He added that significant advances in production have been made over the past year, and aircraft committed for delivery in 2004 are completing production build according to schedule.

"We are delivering high-quality aircraft faster than ever before, meeting our 2004 commitment to the Air Force, and we have begun the initial stages of Raptor modernization," Weiss said. "We are excited that the Air Force's operational testing is nearing completion and look forward to a full-rate production decision."

F/A-22 modernization is a robust, long-term plan to inject emerging technologies and expand capabilities.

Weiss pointed out that the F/A-22's performance is exceeding requirements in key areas such as stealth, speed, agility and sensor systems performance at Edwards, Nellis and Tyndall Air Force bases, routinely demonstrating the Raptor's transformational war fighting capabilities.

The Air Force began F/A-22 Initial Operational Test and Evaluation (IOT&E) in late April 2004, and all indications are that IOT&E is proceeding well, although it is not expected to be complete until later this year. According to the Air Force, all scenarios scheduled to be flown are complete.

"In addition to evaluating data gathered during flight scenarios, the Air Force will use modeling and simulation tools to simulate flying operations and maintenance. The Air Combat Simulator in Marietta, Georgia, is being used for the Modeling and Simulation portion of IOT&E," Weiss said.

"The F/A-22 program is concluding development, ramping up for full-rate production and delivering superior jets to the Air Force," he said. "All the while we are working closely with the Air Combat Command to craft a prudent modernization 'flight plan' that will keep the Raptor on the cutting edge of survivability and lethality for decades to come."

FMI: www.lockheedmartin.com

Advertisement

More News

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC