Oshkosh 2009 NOTAM Now Available Online | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 07.20.15

Airborne 07.21.15

Airborne 07.22.15

Airborne 07.23.15

Airborne 07.24.15

Airborne Hi-Def On YouTube

Airborne 07.20.15

Airborne 07.21.15

Airborne 07.22.15

Airborne 07.23.15

Airborne 07.24.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Tue, May 05, 2009

Oshkosh 2009 NOTAM Now Available Online

Less Than 90 Days??? Panic!

A few hours ago, EAA's Dick Knapinski and I were commiserating about the fact that Oshkosh was less than 90 days away and that we really weren't ready to deal with it all... again. But then again, we can't wait. It's a unique brand of Aero-Schizophrenia... but we repeat it every year...  and this year is no different.

So... it's time to begin preparing for that unforgettable flight to Oshkosh. The first step for any pilot planning to fly to the Oshkosh area for the event is studying FAA's Oshkosh NOTAM, which covers air traffic procedures for the period surrounding and during the annual pilgrimage to the holy land of Oshkosh. THIS IS ESSENTIAL READING! While the overall procedure is similar to previous years, though EAA notes that there are changes on 29 of the 32 NOTAM pages - so don't rely on previous years' versions or your memory to carry you through.

Here are a few of the changes you are urged to note:

  • The NOTAM is effective longer this year - until Noon on August 3, the day after AirVenture.
  • There are changes to the Volk Field Military Operations Area (MOA) times and also active military aircraft (including the Thunderbirds) around Milwaukee.
  • The parking area at Appleton is relocated.
  • There are new descriptions of the VFR arrivals to Oshkosh and Fond du Lac.
  • Some of the IFR routings and altitudes are changed.
FMI: www.airventure.org/flying/notam2009.pdf

Advertisement

More News

Airborne At OSH15 Day 5 Redux: Inhofe's Mission, NextGen GA Fund, New Kitfox

Also: Cicare 8, Switchblade Update, Beringer Alaskan Bush Gear, Jack Pelton Interview - Final E-I-C Note: Regularly Daily Airborne Unlimited Programming will resume this Monday now>[...]

ANN's Daily Aero-Linx (08.01.15)

The BD-5 Web Site The official home of the BD-5 network, the purpose of this web site is to provide information about the Bede Aircraft BD-5, an experimental, homebuilt, single-sea>[...]

ANN's Daily Aero-Term (08.01.15): Notice To Airmen (NOTAM)

A notice containing information (not known sufficiently in advance to publicize by other means) concerning the establishment, condition, or change in any component (facility, servi>[...]

Aero-News: Quote Of The Day (08.01.15)

"The fairing separation is one of our very first critical events. If it doesn't work as planned, it's probable the mission cannot continue." Source: Mike Hawes, Lockheed Martin Ori>[...]

ANN FAQ: Aero-Twitters Offer Instant Alerts For Breaking News

Say Hello To Aero-Twitter! Twitter is designed to work on a mobile phone as well as on a computer (and can be accessed via your IM clients). All Twitter messages (called "Tweets", >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC