AD: Raytheon | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date






Airborne On ANN

Airborne 11.30.15

Airborne 11.24.15

Airborne 11.25.15

Airborne 11.19.15

Airborne 11.20.15

Airborne Hi-Def On YouTube

Airborne 11.30.15

Airborne 11.24.15

Airborne 11.25.15

Airborne 11.19.15

Airborne 11.20.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Fri, Jan 28, 2005

AD: Raytheon

AD NUMBER: 2005-01-04
SUBJECT: Airworthiness Directive 2005-01-04
SUMMARY: The FAA is adopting a new airworthiness directive (AD) to supersede (AD) 98-15-13, which applies to certain Raytheon Aircraft Company 90, 100, 200, and 300 series airplanes. This AD adds the Raytheon Beech 99 series to the applicability listed in AD 98-15-13. The compliance actions remain the same for those aircraft originally affected by AD 98-15-13. AD 98-15-13 currently requires you to check the airplane maintenance records from January 1, 1994, up to and including the effective date of that AD, for any MIL-H-6000B fuel hose replacements on the affected airplanes; inspecting any replaced rubber fuel hose for a spiral or diagonal external wrap with a red or orange-red stripe along the length of the hose with 94519 printed along the stripe; and replacing any MIL-H-6000B rubber fuel hose matching this description with an FAA-approved hose having a criss-cross or braided external wrap. We are issuing this AD to prevent fuel flow interruption, which could lead to uncommanded loss of engine power and loss of control of the airplane.



More News

Airborne 11.25.15: Blue Origin Reusable Rocket!, AMA Reacts, Transgender Pilots

Also: UK CAA, E-Fest 2015, Citizens In Space, Gulfstream G500, Dassault Falcon Jet, CFM LEAP-1A, Tuskegee's Milton Crenchaw ANN Airborne Link: /index.cfm?do=video.playVideo&vid>[...]

Klyde Morris (11.20.15)

Klyde Is SO Ready For An Upgrade... FMI:>[...]

FlightSafety International Further Enhances Gulfstream G650 Training

Simulator Upgrades Include Autobrake Systems For Initial And Recurrent Training FlightSafety continues to enhance its Gulfstream G650 training program with upgrades to the simulato>[...]

Spirit Begins Production Of First Production RAAF P-8A

Aircraft Scheduled For Delivery In Early 2016 Spirit AeroSystems Inc. has begun production of the Royal Australian Air Force's (RAAF) first production P-8A aircraft. Spirit started>[...]

Aero-News: Quote Of The Day (11.30.15)

"ICARUS is going to revolutionize how we approach pilot training. It provides experience to student pilots that we cannot provide right now outside of a simulator. This product wil>[...]

blog comments powered by Disqus





© 2007 - 2015 Web Development & Design by Pauli Systems, LC