QinetiQ Equips UK Sea King Mk4 Fleet With New Rotor Blades | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Jan 16, 2008

QinetiQ Equips UK Sea King Mk4 Fleet With New Rotor Blades

Shown To Generate Big Increase In Hover Weight, Forward Speed

ANN learned this week QinetiQ, in a partnership with the MOD's Joint Test and Evaluation Group (known as ATEC - Aircraft Test & Evaluation Center), recently completed a 12-month, $10.2 million project to increase the capability of the Royal Navy Sea King HC Mk 4 helicopter.

The work, carried out for the Sea King Integrated Project Team (SK IPT) in support of an Urgent Operational Requirement (UOR), now enables the Sea King HC Mk 4 to be deployed in support of Operation HERIC in Afghanistan -- providing much needed capability.

The main rotor blades on the aircraft were replaced by modified Carson composite blades, and the tail rotor was replaced by an AgustaWestland 5-bladed tail rotor system. A rigorous and intensive series of performance evaluation and flight testing was then conducted by ATEC using a QinetiQ-owned Sea King test aircraft. The tests confirmed initial predictions the new system generates up to 2000lb increase in maximum hover mass at high altitude, and enables a significant increase in the maximum forward speed.

Carson blades first came to the MOD's attention six years ago during a Sea King maintenance symposium and the SK IPT was keen to investigate the technology further, but funding and other operational commitments did not immediately allow the idea to be developed. Some time later however, the MOD had to look at extending the life and capability of its current medium lift Sea King and Puma helicopters.

Funding was made available to investigate Carson's claims of increased performance and QinetiQ was tasked with conducting a feasibility study. The results confirmed that Carson blades were indeed a cost effective upgrade that delivered real performance improvements, so the MOD moved to bring them into service quickly for use in operational theaters.

"Within the MOD, the Carson blades program is recognized as being demanding with regard to the short timescales involved and there has been a lot of admiration for the way that QinetiQ has tackled the program and the amount of hours and effort that have been put in," said Lt Cdr Dave Maude from the SK IPT. "Looking from the outside, the amount of work that individuals have put in and their dedication is incredible."

FMI: www.mod.uk, www.qinetiq.com

Advertisement

More News

ANN's Daily Aero-Linx (04.17.24)

Aero Linx: Space Medicine Association (SMA) The Space Medicine Association of the Aerospace Medical Association is organized exclusively for charitable, educational, and scientific>[...]

ANN's Daily Aero-Term (04.17.24): Jamming

Jamming Denotes emissions that do not mimic Global Navigation Satellite System (GNSS) signals (e.g., GPS and WAAS), but rather interfere with the civil receiver's ability to acquir>[...]

ANN's Daily Aero-Linx (04.18.24)

Aero Linx: Warbirds of America The EAA Warbirds of America, a division of the Experimental Aircraft Association in Oshkosh, Wisconsin, is a family of owners, pilots and enthusiasts>[...]

Aero-News: Quote of the Day (04.18.24)

"From New York to Paris, this life-size replica of the Webb Telescope inspired communities around the world and, in doing so, invited friends and families to explore the cosmos tog>[...]

ANN's Daily Aero-Term (04.18.24): Hold-In-Lieu Of Procedure Turn

Hold-In-Lieu Of Procedure Turn A hold-in-lieu of procedure turn shall be established over a final or intermediate fix when an approach can be made from a properly aligned holding p>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC