NASA Conducts Second Test Of Ares Main Parachute | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Nov 17, 2007

NASA Conducts Second Test Of Ares Main Parachute

Large Parachute Passes With 'Falling' Colors

NASA and industry engineers successfully tested the main parachute for Constellation Program rockets during a drop test Thursday at the US Army's Yuma Proving Ground near Yuma, AZ. The parachute system will allow Ares I and Ares V first stage boosters to be recovered and reused.

Thursday's test validated the results of an earlier test conducted in September.

"Measuring 150-feet in diameter and weighing 2,000 pounds, this is the biggest chute of its kind that's been tested," said Steve Cook, director of the Ares Projects Office at NASA's Marshall Space Flight Center in Huntsville, Ala. "With each milestone, we bring ourselves one step closer to further exploring the moon."

Exploring the moon and beyond is the focus of the Constellation Program, which is developing a new family of US launch vehicles, spacecraft and related systems for exploration.

Booster recovery was the focus of the recent test, the second in a series. Outfitted with a 42,000-pound weight to simulate the load of a rocket's first stage, the main parachute was dropped from a US Air Force C-17 aircraft flying at an altitude of 16,500 feet. The 1-ton parachute and all supporting hardware functioned properly, landing safely approximately three minutes later on the Yuma Proving Ground test range.

During the first main parachute test on Sept. 25, the parachute was dropped from a slightly higher elevation of 17,500 feet, giving NASA engineers the opportunity to monitor parachute performance at a dynamic pressure of 86 pounds per square foot. After the drop's completion, engineers spent several weeks reviewing test data - measuring the parachute's peak loads at opening, determining the canopy expansion rate during the early phase of inflation and measuring the parachute's drag area as it drifted down to Earth.

The Ares first stage booster recovery system is derived from the system NASA uses to recover the space shuttle's solid rocket boosters after launch. The first stage booster for Ares I is similar to the space shuttle's solid rocket booster but has an added fifth segment of propellant, resulting in a heavier load.

The current parachute tests are necessary to allow for differences between the space shuttle's four-segment boosters and the Ares launch vehicles. Testing is scheduled to run through 2010.

FMI: www.nasa.gov/constellation

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC