Teams Continue To Work Toward Nov. 30 Discovery Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Nov 15, 2010

Teams Continue To Work Toward Nov. 30 Discovery Launch

GUPC Alignment Tweaked, Fuel Tank Foam Repairs Proceeding

Space Shuttle Discovery continues to wait at launch complex 39A at the Kennedy Space Center in Cape Canaveral, FL, as technicians work to prepare her for her final mission into space.


NASA File Photo

Over the weekend, additional measurements were taken to ensure the best possible alignment of the newly installed ground umbilical carrier plate, or GUCP, on space shuttle Discovery's external fuel tank. Teams installed the flight seal Friday night and will meet today to evaluate data. Technicians expect to begin installing the quick disconnects today (Monday).

Engineers also are continuing work to repair cracks in Discovery's external tank intertank section. During foam removal and inspection of adjacent stringers to the one with two 9-inch cracks, technicians identified a crack about 3-inches long on the left-hand adjacent stringer. This was not an unexpected result since the load was most likely transferred to the adjacent stringer when both sides of the original stringer cracked during tanking operations for Discovery's scrubbed launch attempt on Nov. 5. Teams will build and use existing structural math models to understand the loading at the interface. Stringers are aluminum support strips on the outside of the external tank that form the section between the inside liquid oxygen tank and the liquid hydrogen tanks.

Discovery's launch was delayed when the leaking GUPC was discovered. The cracks in the foam insulation on the main fuel tank were found during the GUPC inspection. The shuttle is now targeted for launch on a mission to ISS on November 30. It will be Discovery's final space flight.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (04.15.24)

Aero Linx: International Flying Farmers IFF is a not-for-profit organization started in 1944 by farmers who were also private pilots. We have members all across the United States a>[...]

Classic Aero-TV: 'No Other Options' -- The Israeli Air Force's Danny Shapira

From 2017 (YouTube Version): Remembrances Of An Israeli Air Force Test Pilot Early in 2016, ANN contributor Maxine Scheer traveled to Israel, where she had the opportunity to sit d>[...]

Aero-News: Quote of the Day (04.15.24)

"We renegotiated what our debt restructuring is on a lot of our debts, mostly with the family. Those debts are going to be converted into equity..." Source: Excerpts from a short v>[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.16.24): Chart Supplement US

Chart Supplement US A flight information publication designed for use with appropriate IFR or VFR charts which contains data on all airports, seaplane bases, and heliports open to >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC