Boeing Makes A Change At The Top Of The 747-8 Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Aug 30, 2010

Boeing Makes A Change At The Top Of The 747-8 Program

Mohammad Yahyavi Removed As Program Leader

Boeing said late last week that it has removed Mohammad "Mo" Yahyavi as the top executive of its delayed 747-8 program. The announcement came just one day following Boeing's announcement that the first delivery of the 787 would be pushed into at least February of 2011.

Management has taken much of the blame for the delays in both programs.

The Seattle Times reports that Boeing shifte Yahyavi to a 'special assignment', with no indication what his new duties would be. Program vice president Pat Shanahan announced the move to those in the program in an e-mail Friday afternoon. Shanahan will assume greater control over the overall program, the e-mail said.


747-8 Freighter

The 747-8 program delays may cause delivery of the first of the new freighters to slip into next year, much like the Dreamliner. Shanahan said last July that there had been come design issues that required "enhancement to the flight controls," which led to additional testing. No specific problem was ever identified to the media.

Flight testing on the stretch 747, which as a passenger aircraft will carry 476 people, did not start until February of 2010, though Yahyavi had told Boeing's board there would be three test aircraft flying by the end of 2009.

The 747-8 frieghter recently successfully completed a flight that tipped the scales at more than a million pounds at takeoff.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC