Navy Ups Production Of P-8A Poseidon Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Nov 11, 2011

Navy Ups Production Of P-8A Poseidon Aircraft

2nd Phase Of Low-Rate Initial Production Also Includes Spares, Logistics And Training

The U.S. Navy has awarded Boeing a $1.7 billion low-rate initial production (LRIP) for seven additional P-8A Poseidon maritime surveillance aircraft. LRIP-II is the follow-on to an initial LRIP-I contract awarded in January to provide six Poseidon aircraft. Overall, the Navy plans to purchase 117 Boeing 737-based P-8A anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft to replace its P-3 fleet.

As part of the contract, Boeing will provide aircrew and maintenance training for the Navy beginning in 2012, in addition to logistics support, spares, support equipment and tools. The training system will include a full-motion, full-visual Operational Flight Trainer that simulates the flight crew stations, and a Weapons Tactics Trainer for the mission crew stations.

"This contract is the result of the Boeing and Navy team's hard work and commitment, and moves us a step closer to P-8A full-rate production," said Chuck Dabundo, Boeing vice president and P-8 program manager. "We've assembled and flown the first LRIP plane and continue to focus on building P-8A aircraft on cost and on schedule."

"LRIP-II brings the P-8A program one step closer to delivering the Poseidon to the fleet," said Capt. Scott Dillon, P-8A deputy program manager for the Navy.

Boeing completed assembly of the first LRIP-I aircraft at its Renton, Wash., facility this summer. The aircraft subsequently completed a successful first flight July 7, 2011, from Renton Field to Boeing Field, which marked its transition from fabrication and assembly to mission system installation and checkout in Seattle.

The Poseidon team is using a first-in-industry in-line production process that draws on Boeing's Next-Generation 737 production system. All P-8A-unique aircraft modifications are made in sequence during fabrication and assembly.

The team has built and is testing six flight-test and two ground-test aircraft under the U.S. Navy System Development and Demonstration contract awarded to Boeing in 2004. Four flight-test aircraft -- T1, T2, T3 and T5 -- are conducting testing at Naval Air Station Patuxent River, Md. The program's static test plane, S1, completed its test program in January. S2, the fatigue test plane, will begin testing next year. Initial operational capability is planned for 2013.

FMI: www.boeing.com, www.navy.mil

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC