STL Selects Consultants For Airport Improvements | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Jun 25, 2008

STL Selects Consultants For Airport Improvements

First Project In Airport Experience Program Begins In July

Officials at Lambert-St. Louis International Airport have selected the first round of design consultants for the field's major renovation campaign, called the Airport Experience Program. The renovations will modernize and restore the Main Terminal and concourses to improve airport functions and improve the overall passenger experience.

Proposed improvements include restoring the terminal's domed ceilings; replacing inbound baggage claim systems; overhauling Lambert's roadway sign program; modernizing ticket counter operations; constructing new restrooms, upgrading security screening checkpoints, installing new floor, ceiling and wall finishes; improving passenger circulation areas and adding new restaurants and other concessions.

Selected Consultants include:

  • Kwame Building Group of St. Louis: Program Management.
  • Teng & Associates, Inc. of St. Louis: Dome renovations design, Main Terminal Ticketing Hall Main Terminal Ticketing Hall and Mid-Level architectural renovations design; Concourses Architectural Renovations design.
  • Kozeny-Wagner, Inc. of St. Louis: In-bound conveyers and baggage claims design/build.
  • Apple Designs, Inc. of Raleigh North Carolina: Entrance monuments and wayfinding signage design.
  • Burns and McDonnell of St. Louis (Office): Main Terminal Ticketing Hall and Mid-Level Mechanical, Electrical, Plumbing and Special Systems (MEPSS) Renovations design; Concourses Mechanical, Electrical, Plumbing and Special Systems (MEPSS) Renovations design.

The first project is the restoration of Lambert's historic domed ceilings which is scheduled to begin in mid-July. Replacement of the in-bound baggage system and Wayfinding signage projects will begin early 2009.

The other proposed projects will start after completion of their respective design phases. Lambert will make a formal announcement about the first projects in the Airport Experience Program in July.

FMI: www.lambert-stlouis.com

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC