Emergency CASA AD: Gulfstream | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Aug 29, 2005

Emergency CASA AD: Gulfstream

AD/G1159/44 Adel Wiggins Floor Heater Pad System 11/2005 DM

Applicability: Gulfstream Aerospace Corporation model/series aeroplanes as follows:

Requirement: 1. Perform an inspection to determine if an Adel Wiggins floor heater pad system is installed. A review of aeroplane maintenance records is acceptable in lieu of this inspection if the presence of Adel Wiggins floor heater pads can be conclusively determined from that review.

2. If an Adel Wiggins floor heater pad system is found during the Requirement 1 inspection/determination - deactivate the Adel Wiggins floor heater pad system in accordance with the Accomplishment Instructions of the applicable Alert Customer Bulletin (ACB) identified below, unless Requirement 3 applies.

3. For any aeroplane that is found to have an Adel Wiggins floor heater pad system installed but is not listed in the effectivity block of Gulfstream Drawing 1159SB50018, deactivate the Adel Wiggins floor heater pad system in accordance with a method approved by the Manager, Atlanta Aircraft Certification Office (ACO), FAA.

Model

Series

G-IV

All

GIV-X

Serial Numbers 4001 through 4023 inclusive

GV

All

GV-SP

Serial Numbers 5001 through 5075 inclusive



Note 1: For details of deactivation method approved by the Atlanta FAA ACO contact Gulfstream Customer Support on +1 912-965-4178 for assistance.

Note 2: FAA AD 2005-16-14 Amdt 39-14220 refers.

Model/Series

ACB, including Gulfstream
drawing 1159SB50018

Date

G-IV G-IV ACB 33 13 June 2005
GV GV ACB 22 13 June 2005
G-IV (G300) G300 ACB 33 13 June 2005
GIV-X (G350 G350 ACB 2 13 June 2005
G-IV (G400) G400 ACB 33 13 June 2005
GIV-X (G450) G450 ACB 2 13 June 2005
GV-SP (G500) G500 ACB 3 13 June 2005
GV-SP (G550) G550 ACB 3 13 June 2005


Compliance: For Requirements 1, 2 and 3 - Within 25 flight hours or 30 days after the effective date of this Directive, whichever occurs first.
This Airworthiness Directive becomes effective on 2 September 2005.

Background: The United States Federal aviation Administration has received a report of an incident in which an Adel Wiggins floor heater pad system short-circuited on a Gulfstream GV-SP series aeroplane. The short-circuit was discovered after an odour of burning was detected emanating from the floor of the cabin. The short-circuit resulted in localized damage to the floorboard and carpet. No circuit breakers tripped as a result of the short-circuiting. This condition, if not corrected, could result in a fire in the aeroplane cabin.

Adel Wiggins floor heater pad systems may also be installed on all Gulfstream Model G-IV and G-V series aeroplanes and certain Gulfstream Model GIV-X series aeroplanes. Therefore, those models may be subject to the unsafe  condition revealed on Model GV-SP series aeroplanes.

This Directive requires a one-time inspection to determine if an Adel Wiggins floor heater pad system is installed and deactivation of the floor heater pad system if it is installed.

FMI: www.casa.gov.au/airworth/airwd/ADfiles/over/g1159/G1159-044.pdf

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC