One Year Later, GOES-N Launch Goes Off Without A Hitch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne 02.12.18

Airborne-UnManned 02.13.18

Airborne 02.14.18

AMA Drone Report 02.15.18

Airborne 02.16.18

Airborne-YouTube

Airborne 02.12.18

Airborne-UnManned 02.13.18

Airborne 02.14.18

AMA Drone Report 02.15.18

Airborne 02.16.18

Thu, May 25, 2006

One Year Later, GOES-N Launch Goes Off Without A Hitch

After a series of delays bumped its launch date by over a year, on Wednesday the Geostationary Operational Environmental-N satellite (GOES-N) lifted off aboard a Boeing Delta IV rocket from Cape Canaveral Air Force Station, FL. The rocket lifted off its pad at Launch Complex 37 at 6:11 pm EDT.

GOES-N is the latest in a series of Earth monitoring satellites. Geostationary Operational Environmental Satellites (GOES) provide the kind of continuous monitoring necessary for intensive data analysis. Geostationary describes an orbit in which a satellite is always in the same position with respect to the rotating Earth.

This allows GOES to hover continuously over one position on the Earth's surface, appearing stationary. As a result, GOES provide a constant vigil for the atmospheric "triggers" for severe weather conditions such as tornadoes, flash floods, hail storms, and hurricanes.

NASA reports the multimission GOES series N-P is the next series of satellites. This series will be a vital contributor to weather, solar and space operations, and science. NASA and the National Oceanic and Atmospheric Administration (NOAA) are actively engaged in a cooperative program to expand the existing GOES system with the launch of the GOES N-P satellites.

Originally scheduled to launch last May, the GOES-N mission was delayed due to various technical issues with the satellite and its rocket. Winds at the tail end of Hurricane Wilma in 2005 also conspired to delay the mission, as did a machinist's strike at Boeing.

After GOES-N reaches its geosynchronous orbit of approximately 22,300 miles and a successful post-launch checkout is performed, the satellite will be placed in an on-orbit storage mode where it will be able to more rapidly replace a failure of any existing operational GOES. 

FMI: www.nasa.gov

Advertisement

More News

AMA Drone Report 02.15.18: AMA Expo East, Skydio R1, TSB Canada Report

Also: DJI Knowledge Quiz, GoFly Competition, Drone ID Rules Coming, FAA Unenthusiastic About Prosecuting? The Academy of Model Aeronautics will host the annual AMA Expo East at the>[...]

Airborne-Unmanned 02.13.18: FAA UAS Symposium, Airbus Delivers, Manned EHANG 184

Also: UAS Pilot Code, FAA Drone Program, SkyWatch Funding, Quantix Hybrid UAS For Farmers The FAA and AUVSI will co-host the 3rd Annual FAA Unmanned Aircraft Systems (UAS) Symposiu>[...]

Airborne 02.16.18: R66 Wire-Strike Protection, Elk v Helo, Trump Budget

Also: Red Bull Picks Hartzell, SNC Dream Chaser, CH-53K Demo's Vehicle Lift, Emirates Firms Up A380 Orders Robinson has added wire strike protection provisions to its R66 options l>[...]

Aero-News: Quote of the Day (02.18.18)

"As drones become more portable, intelligent and accessible, we expect to see more enthusiasts using this technology at home, on their travels and as a complementary tool for their>[...]

ANN's Daily Aero-Linx (02.18.18)

Aero Linx: The Canadian Business Aviation Association (CBAA) The Canadian Business Aviation Association (CBAA) is a non-profit association formed in 1961 as Canada’s voice fo>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2018 Web Development & Design by Pauli Systems, LC