One Year Later, GOES-N Launch Goes Off Without A Hitch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne On ANN

ADR 02.20.17

Airborne 02.20.17

Airborne 02.21.17

Airborne 02.22.17

Airborne 02.23.17

Airborne 02.17.17

Airborne-HD On YouTube

ADR 02.20.17

Airborne 02.20.17

Airborne 02.21.17

Airborne 02.22.17

Airborne 02.23.17

Airborne 02.17.17

Thu, May 25, 2006

One Year Later, GOES-N Launch Goes Off Without A Hitch

After a series of delays bumped its launch date by over a year, on Wednesday the Geostationary Operational Environmental-N satellite (GOES-N) lifted off aboard a Boeing Delta IV rocket from Cape Canaveral Air Force Station, FL. The rocket lifted off its pad at Launch Complex 37 at 6:11 pm EDT.

GOES-N is the latest in a series of Earth monitoring satellites. Geostationary Operational Environmental Satellites (GOES) provide the kind of continuous monitoring necessary for intensive data analysis. Geostationary describes an orbit in which a satellite is always in the same position with respect to the rotating Earth.

This allows GOES to hover continuously over one position on the Earth's surface, appearing stationary. As a result, GOES provide a constant vigil for the atmospheric "triggers" for severe weather conditions such as tornadoes, flash floods, hail storms, and hurricanes.

NASA reports the multimission GOES series N-P is the next series of satellites. This series will be a vital contributor to weather, solar and space operations, and science. NASA and the National Oceanic and Atmospheric Administration (NOAA) are actively engaged in a cooperative program to expand the existing GOES system with the launch of the GOES N-P satellites.

Originally scheduled to launch last May, the GOES-N mission was delayed due to various technical issues with the satellite and its rocket. Winds at the tail end of Hurricane Wilma in 2005 also conspired to delay the mission, as did a machinist's strike at Boeing.

After GOES-N reaches its geosynchronous orbit of approximately 22,300 miles and a successful post-launch checkout is performed, the satellite will be placed in an on-orbit storage mode where it will be able to more rapidly replace a failure of any existing operational GOES. 

FMI: www.nasa.gov

Advertisement

More News

Infamous RV-10 Lawsuit Against Van's Aircraft Dismissed

Years of Wasted Effort, Resources, and Worry Signal Ongoing Defects In US Tort Law When the news first came out, in 2015, that Van's Aircraft was sued for a considerable amount of >[...]

Airborne 02.22.17: CAF Dixie Wing P-63A, AF1 Price Cut, SLS Manned Flt?

Also: Drone Light Show, Remotely Piloted Helos, TFR Busts, Gulfstream, XTI Aircraft, CA Airlines, Icelandair After more than 40 years since it’s last flight, the Commemorativ>[...]

AMA Drone Report 02.20.17: DJI & AMA Team Up, MultiGP, Drone Advisory Committee

Also: Another Dumb FL Drone Law, AMA Expo East!, Spaceport America Drone Summit DJI and AMA have launched a joint program to promote safe and responsible drone operations, train pu>[...]

Airborne 02.21.17: NASA 'Space Poop' Challenge, Drone Advisory, Boeing

Also: Alphabet Balloons, Aero-Calendar, DJI-AMA, Solar Research, Dreamliners, F-35, ALPA NASA Johnson Space Center, in partnership with NASA Tournament Lab and online crowdsourcing>[...]

GA Aircraft Shipments And Billings Down Almost Across The Board

Only Uptick Was In Turboprop Airplanes, Turbine Helicopters Hit Hard The news is pretty much all bad, and some of it is really bad, in the GAMA 2016 year-end report of aircraft shi>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC