One Year Later, GOES-N Launch Goes Off Without A Hitch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne 12.11.17

Airborne-Unmanned 12.12.17

Airborne 12.13.17

AMA Drone Report 12.07.17

Airborne 12.08.17

Airborne-YouTube

Airborne 12.11.17

Airborne-Unmanned 12.12.17

Airborne 12.13.17

AMA Drone Report 12.07.17

Airborne 12.08.17

Thu, May 25, 2006

One Year Later, GOES-N Launch Goes Off Without A Hitch

After a series of delays bumped its launch date by over a year, on Wednesday the Geostationary Operational Environmental-N satellite (GOES-N) lifted off aboard a Boeing Delta IV rocket from Cape Canaveral Air Force Station, FL. The rocket lifted off its pad at Launch Complex 37 at 6:11 pm EDT.

GOES-N is the latest in a series of Earth monitoring satellites. Geostationary Operational Environmental Satellites (GOES) provide the kind of continuous monitoring necessary for intensive data analysis. Geostationary describes an orbit in which a satellite is always in the same position with respect to the rotating Earth.

This allows GOES to hover continuously over one position on the Earth's surface, appearing stationary. As a result, GOES provide a constant vigil for the atmospheric "triggers" for severe weather conditions such as tornadoes, flash floods, hail storms, and hurricanes.

NASA reports the multimission GOES series N-P is the next series of satellites. This series will be a vital contributor to weather, solar and space operations, and science. NASA and the National Oceanic and Atmospheric Administration (NOAA) are actively engaged in a cooperative program to expand the existing GOES system with the launch of the GOES N-P satellites.

Originally scheduled to launch last May, the GOES-N mission was delayed due to various technical issues with the satellite and its rocket. Winds at the tail end of Hurricane Wilma in 2005 also conspired to delay the mission, as did a machinist's strike at Boeing.

After GOES-N reaches its geosynchronous orbit of approximately 22,300 miles and a successful post-launch checkout is performed, the satellite will be placed in an on-orbit storage mode where it will be able to more rapidly replace a failure of any existing operational GOES. 

FMI: www.nasa.gov

Advertisement

More News

President Trump Signs Space Policy Directive 1

Instructs NASA To Refocus On Manned Space Exploration President Donald Trump is sending astronauts back to the Moon. The president Monday signed at the White House Space Policy Dir>[...]

AMA Drone Report 12.07.17: AMA Supports GoFly, ALPA v UAS, EU Drone Regs

Also: Drones Hunt Pythons, MI State Regs, Thanksgiving Drone Flying, Drone Collision Report A little outside our normal coverage responsibilities, nonetheless, we’re intrigue>[...]

Airborne 12.11.17: Pilatus PC-24 Cert, VerdeGo Aero, Canada Nixes Hornets

Also: Engine Coatings Facility, Wrong Runway At JFK, ATR 72-600 Flight Sim, Regional Airline Association Pilatus has obtained type certificates from the FAA and EASA for the first >[...]

Airborne-Unmanned 12.12.17: ERAU Storm Chaser, USMC Drone Insignia, Malawian UAV

Also: NLR Signs Agreement, QinetiQ, Big Bend Community College, 2nd Annual UAS Conference, Tigershark UAS Kicking off a series of tests for its capstone project, the UAV Storm Chas>[...]

Airborne-Unmanned 12.12.17: ERAU Storm Chaser, USMC Drone Insignia, Malawian UAV

Also: NLR Signs Agreement, QinetiQ, Big Bend Community College, 2nd Annual UAS Conference, Tigershark UAS Kicking off a series of tests for its capstone project, the UAV Storm Chas>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC