G250 Completes Natural Icing Tests | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Mar 26, 2011

G250 Completes Natural Icing Tests

Aircraft Now Involved In Function And Reliability Testing

Gulfstream's second G250 flight-test aircraft has recently successfully completed natural icing tests, bringing the aircraft several steps closer to its certification later this year by the FAA and the Civil Aviation Authority of Israel. Serial Number (S/N) 2002 left its home base in Israel last month, crossed the Atlantic and landed in Smryna, TN, where it spent several weeks flying to the Great Lakes region to hunt for natural icing conditions aloft.

The G250 successfully completed the test points required for certification, including allowing ice to build up on the aircraft's unprotected surfaces and then verifying the aircraft's stability and control characteristics, as well as evaluating the ice protection systems and the tolerance of the aircraft after being exposed to icing conditions for 45 minutes. "The G250 performed exceptionally well," said Pres Henne, senior vice president, Programs, Engineering and Test, Gulfstream. "During one particular flight, the crew encountered icing concentrations in excess of the regulatory design envelope. The aircraft remained in this condition for an equivalent icing exposure time of more than 50 minutes to allow adequate accumulation of ice. Despite the extremely demanding conditions and ice accumulation on all untreated surfaces, the aircraft performed flawlessly."

The anti-ice system on the leading edge of the G250 wing was adapted from large-cabin Gulfstream aircraft. Heated bleed air from the engines is routed to the leading edges to prevent ice formation. S/N 2002 will now undergo overnight cold-soak trials, having completed a similar test in Finland. The aircraft has also completed hot-weather testing on the coast of the Red Sea.

S/N 2003 has started function and reliability testing in Israel, where the G250 is manufactured in cooperation with Israel Aerospace Industries (IAI). Function and reliability tests demonstrate that the aircraft, its components and its systems consistently operate as expected. Reaching this point is considered a major milestone toward certification. 

With flight test well under way, manufacturing continues for the first production aircraft, S/N 2004. The empennage and wing have been joined to the fuselage, and installation of the aircraft's systems has begun. Component-level fatigue testing on the main landing gear and rudder continues, while the full-up fatigue test article, S/N 1999, proceeds with preparation for testing over 40,000 cycles.

The three aircraft in the flight-test program have already accrued more than 955 hours in 324 flights.

FMI: www.gulfstream.com

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC